Category:101 Standard Forms: Difference between revisions
Jump to navigation
Jump to search
m →AASHTOWare Project Quick Reference Guides (QRGs): added 2 new links |
|||
Line 402: | Line 402: | ||
:* [https://epg.modot.org/forms/CM/AWP_CM_Filters.doc AWP CM Filters] | :* [https://epg.modot.org/forms/CM/AWP_CM_Filters.doc AWP CM Filters] | ||
:* [https://epg.modot.org/forms/CM/AWP_CM_Filters_for_Sample_Records_or_Acceptance_Actions.doc AWP CM Filters for Sample Records or Acceptance] | |||
:* [https://epg.modot.org/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment] | :* [https://epg.modot.org/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment] | ||
Line 476: | Line 478: | ||
:* [https://epg.modot.org/forms/CM/AWP_MA_DEC_Sample_Record.docx AWP MA DEC Sample Record] | :* [https://epg.modot.org/forms/CM/AWP_MA_DEC_Sample_Record.docx AWP MA DEC Sample Record] | ||
:* [https://epg.modot.org/forms/CM/AWP_MA_DeletingMaterialsFromAcceptanceActions.doc AWP MA Deleting materials From Acceptance] | |||
:* [https://epg.modot.org/forms/CM/AWP_MA_EditingContractAcceptanceActionsAndActionRelationships.doc AWP MA Editing Contract Acceptance Actions and Action Relationships] | :* [https://epg.modot.org/forms/CM/AWP_MA_EditingContractAcceptanceActionsAndActionRelationships.doc AWP MA Editing Contract Acceptance Actions and Action Relationships] |
Revision as of 10:07, 30 November 2022
EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding). |
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
AASHTOWare Project Quick Reference Guides (QRGs)
Storm Water Database Quick Reference Guides (QRGs)
Design
Microstation D-Sheets |
Signing |
D-28, D-29 through D-34 |
Signals |
D-37A through D-37d, D-38 through D-38e |
Typical Sections |
D-49 through D-70 |
Miscellaneous |
D-71 |
Bridge
Checklist
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Materials
Planning
Public Involvement
- Public Hearing Statement Form
- Sample Letter Advertising a Public Hearing
- Sample Notice 4F
- Sample Notice of Public Hearing
- Sample Opportunity for a Public Hearing/Meeting Notice
- Sample Public Involvement Plan or Communication Plan
- Sample Request for Approval of Location and/or Design of Highways to State Design Engineer
- Sample Request for Approval of Location to the Commission
- Sample Transcript
Right of Way
Scoping
Survey
External Civil Rights
DBE
OJT
Workforce Diversity JSP
Financial Services
Highway Safety/Traffic
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition