Category:101 Standard Forms: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
Smithk (talk | contribs)
m →‎SiteManager Quick Reference Guides (QRGs) 20px: Per CM, removed archaic SiteManager info and replaced with AASHTOWARE info
Line 468: Line 468:


:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_UsingFindSample.docx AWP MA Using the Find Sample Function]
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_UsingFindSample.docx AWP MA Using the Find Sample Function]
====SiteManager Quick Reference Guides (QRGs) [[image:bulldozer.jpg|20px]]====
<div id="Change Order Codes"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_Codes.doc Change Order Codes]
<div id="Change Order Reports"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_reports.docx Change Order Reports]
<div id="Change Orders - Zero Dollar"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_zero_dollar.docx Change Orders - Zero Dollar]
<div id="Change Orders"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders.docx Change Orders]
<div id="Change Orders – Mobilization and Contract Bond"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Mobilization_and_Contract_Bond.docx Change Orders – Mobilization and Contract Bond]
<div id="Change Orders – Time Adjustment"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Time_Adjustment.docx Change Orders – Time Adjustment]
<div id="Change Orders – Value Engineering"></div>
:* [http://epg.modot.mo.gov/forms/CM/Change_Orders_Value_Engineering.doc Change Orders – Value Engineering]
:* [http://epg.modot.mo.gov/forms/CM/Check_for_Current_Version_of_SiteManager.doc Check for Current Version of SiteManager]
:* [http://epg.modot.mo.gov/forms/CM/Concrete_Cylinder_Sample_Sent_to_Central_Lab.doc Concrete Cylinder Sample Sent to Central Lab]
:* [http://epg.modot.mo.gov/forms/CM/Concrete_mix_design_creation.doc Concrete Mix Design Creation]
<div id="Contract Adjustments"></div>
:* [http://epg.modot.mo.gov/forms/CM/Contract_Adjustments.docx Contract Adjustments]
:* [http://epg.modot.mo.gov/forms/CM/Contract_Master_List.docx Contract Master List]
:* [http://epg.modot.mo.gov/forms/CM/Contract_Finalization.doc Contract Finalization]
<div id="Contractor Pay Estimates"></div>
:* [http://epg.modot.mo.gov/forms/CM/Contractor_Pay_Estimates.docx Contractor Pay Estimates]
:* [http://epg.modot.mo.gov/forms/CM/CRE20_Contractor_Reoporting_Excel2Oracle.docx CRE2O - Contractor Reporting Excel2Oracle]
:* [http://epg.modot.mo.gov/forms/CM/CRE20_QA_Asphalt_Guide.docx CRE2O QA Asphalt Guide]
:* [http://epg.modot.mo.gov/forms/CM/Daily_Work_Reports.docx Daily Work Reports]
:* [http://epg.modot.mo.gov/forms/CM/Diaries.docx Diaries]
:* [http://epg.modot.mo.gov/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital Signature for Adobe Reader DC or Pro DC]
:* [http://epg.modot.mo.gov/forms/CM/Disposition_Remarks_for_PAL_Materials.doc Disposition Remarks for PAL Materials]
:* [http://epg.modot.mo.gov/forms/CM/Emergency_Contacts.docx Emergency Contacts]
:* [http://epg.modot.mo.gov/forms/CM/Equipment_Rental_Rates_online.doc Equipment Rental Rates from the Blue Book]
<div id=" Equipment Verification Samples "></div>
:* [http://epg.modot.mo.gov/forms/CM/Equipment_Verification_Samples.docx Equipment Verification Samples]
:* [http://epg.modot.mo.gov/forms/CM/Estimate_Based_Documentation_Records.doc Estimate Based Documentation Records]
:* [http://epg.modot.mo.gov/forms/CM/Filtering_a_SiteManager_Pick_List.doc Filtering a SiteManager Pick List]
:* [http://epg.modot.mo.gov/forms/CM/How_to_Use_Cognos_Reports.docx How to Use Cognos Reports]
:* [http://epg.modot.mo.gov/forms/CM/Job_Order_Contracts.docx Job Order Contracts]
:* [http://epg.modot.mo.gov/forms/CM/Key_Dates.docx Key Dates]
:* [http://epg.modot.mo.gov/forms/CM/Line_Item_Adjustments.docx Line Item Adjustments]
<div id="Liquidated Damage Adjustments"></div>
:* [http://epg.modot.mo.gov/forms/CM/Liquidated_Damage_Adjustments.docx Liquidated Damage Adjustments]
<div id="Milestones"></div>
:* [http://epg.modot.mo.gov/forms/CM/Milestones.docx Milestones]
<div id="Moving Files from SharePoint to CIA"></div>
:* [http://epg.modot.mo.gov/forms/CM/PAL_Plant_Inspection_and_Record.docx PAL Plant Inspection and Record]
:* [http://epg.modot.mo.gov/forms/CM/SL_Reason_Codes_for_Time_Extension_Change_Orders.doc SL District Reason Codes for Time Extension Change Orders]
:* [http://epg.modot.mo.gov/forms/CM/SL_Signal_Maintenance.docx SL District Signal Maintenance by Contractor Key Dates]
:* [http://epg.modot.mo.gov/forms/CM/Sample_Record_General.docx Sample Record General Information]
:* [http://epg.modot.mo.gov/forms/CM/Sample_Record_of_DEC_Inspection.doc Sample Record of DEC Inspection]
:* [http://epg.modot.mo.gov/forms/CM/Sample_Record_of_Soil_Density_Inspection.doc Sample Record of Soil Density Inspection]
:* [http://epg.modot.mo.gov/forms/CM/Sample_Record_of_Visual_Inspection.doc Sample Record of Visual Inspection]
:* [http://epg.modot.mo.gov/forms/CM/Sampling_Checklist.docx Sampling Checklist]
<div id="Stockpiled Materials"></div> 
:* [http://epg.modot.mo.gov/forms/CM/Stockpiled_Materials.doc Stockpiled Materials]
:* [http://epg.modot.mo.gov/forms/CM/Subcontracts.docx Subcontracts]
<div id="SuperPave Adjustments"></div> 
:* [http://epg.modot.mo.gov/forms/CM/SuperPave_Adjustments.doc SuperPave Adjustments]
:* [http://epg.modot.mo.gov/forms/CM/Terminal_Services-Remote_Desktop_Connection.docx Terminal Services/Remote Desktop Connection]
:* [http://epg.modot.mo.gov/forms/CM/Vendor_Master_List.doc Vendor Master List]


====Storm Water Database Quick Reference Guides (QRGs)====
====Storm Water Database Quick Reference Guides (QRGs)====

Revision as of 11:40, 13 September 2021

EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding).

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

Construction and Materials

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

AASHTOWare Project Quick Reference Guides (QRGs)

AWP QRG Revision Dates

Storm Water Database Quick Reference Guides (QRGs)

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer

Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Materials

Photo

Planning

Public Involvement

Right of Way

Scoping

Survey

External Civil Rights

DBE

OJT

Workforce Diversity JSP

Financial Services

Highway Safety/Traffic

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services

Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition