Category:101 Standard Forms: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
Smithk (talk | contribs)
Line 380: Line 380:


:* [http://epg.modot.mo.gov/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CM_Test_Equipment.doc AWP CM Test Equipment]
 
<div id="Change Order Overview"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_1ChangeOrderOverview.doc AWP CO 1 Change Order Overview]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_1ChangeOrderOverview.doc AWP CO 1 Change Order Overview]


:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_2ChangeOrderAddingNewItemorOverrunUnderrunExisting.doc AWP CO 2 Change Order Adding New Item or Overrun/Underrun of Existing Items]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_2ChangeOrderAddingNewItemorOverrunUnderrunExisting.doc AWP CO 2 Change Order Adding New Item or Overrun/Underrun of Existing Items]
 
<div id="AWP CO 3"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc AWP CO 3 Change Order Time Extension]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc AWP CO 3 Change Order Time Extension]
 
<div id="AWP CO 4"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_4ChangeOrderValueEngineering.doc AWP CO 4 Change Order Value Engineering]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_4ChangeOrderValueEngineering.doc AWP CO 4 Change Order Value Engineering]
 
<div id="AWP CO 5"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_5ChangeOrderNoCostContractModification.doc AWP CO 5 Change Order, No Cost Contract Modification]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_5ChangeOrderNoCostContractModification.doc AWP CO 5 Change Order, No Cost Contract Modification]
<div id="AWP CO 6"></div>
<div id="AWP CO 6"></div>
Line 394: Line 394:


:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_7ChangeOrderApproval.doc AWP CO 7 Change Order Approval]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_7ChangeOrderApproval.doc AWP CO 7 Change Order Approval]
 
<div id="Change Order Codes"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Codes.doc AWP CO Change Order Codes]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Codes.doc AWP CO Change Order Codes]
 
<div id="Change Order Reports"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Reports.doc AWP CO Change Order Reports]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Reports.doc AWP CO Change Order Reports]
<div id="CO Commercially Useful"></div>
<div id="CO Commercially Useful"></div>
Line 402: Line 402:


:*[[media:146 CUF After Mar 2021.pdf|Commercially Useful Function (CUF) Determination Form (for contracts awarded after March 2021)]]
:*[[media:146 CUF After Mar 2021.pdf|Commercially Useful Function (CUF) Determination Form (for contracts awarded after March 2021)]]
 
<div id="CO Construction Stockpiles"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Construction_Stockpiles.doc AWP CO Construction Stockpiles]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Construction_Stockpiles.doc AWP CO Construction Stockpiles]


Line 408: Line 408:


:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_ContractVendorAssets.doc AWP CO Contract Vendor Assets]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_ContractVendorAssets.doc AWP CO Contract Vendor Assets]
 
<div id="CO Contract Adjustments"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Adjustments.doc AWP CO Contract Adjustments]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Adjustments.doc AWP CO Contract Adjustments]
<div id="CO Contract Times"></div>
<div id="CO Contract Times"></div>
Line 424: Line 424:


:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_EmergencyContacts.doc AWP CO Emergency Contacts]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_EmergencyContacts.doc AWP CO Emergency Contacts]
 
<div id="AWP CO Estimate"></div>
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Estimate.doc AWP CO Estimate]
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Estimate.doc AWP CO Estimate]
<div id="AWP CO Estimate Final"></div>
<div id="AWP CO Estimate Final"></div>

Revision as of 11:39, 13 September 2021

EPG articles are not referenced as "sections" but as EPG XXX.X (example: EPG 401.3) to avoid confusion with MoDOT specs (which are contractually binding).

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

Construction and Materials

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

AASHTOWare Project Quick Reference Guides (QRGs)

AWP QRG Revision Dates

SiteManager Quick Reference Guides (QRGs)

Storm Water Database Quick Reference Guides (QRGs)

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer

Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Materials

Photo

Planning

Public Involvement

Right of Way

Scoping

Survey

External Civil Rights

DBE

OJT

Workforce Diversity JSP

Financial Services

Highway Safety/Traffic

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services

Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition