Category:101 Standard Forms: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m Updated Design Exception Info form by adding line for State Design Engineer's signature |
||
Line 18: | Line 18: | ||
[[image:101 Bridge.jpg|right|150px]] | [[image:101 Bridge.jpg|right|150px]] | ||
*[[media:131.4 Design Exception Info.doc|Design Exception Information]] | *[[media:131.4 Design Exception Info 2013.doc|Design Exception Information]] | ||
*[http://epg.modot.mo.gov/forms/BR/Design%20Except%20to%20District.dot Design Except to District] | *[http://epg.modot.mo.gov/forms/BR/Design%20Except%20to%20District.dot Design Except to District] | ||
Line 514: | Line 514: | ||
*[http://epg.modot.mo.gov/forms/DE-DEForms/D-28%20Sign%20Design%20Order%20Form.dot D-28 Sign Design Order Form] | *[http://epg.modot.mo.gov/forms/DE-DEForms/D-28%20Sign%20Design%20Order%20Form.dot D-28 Sign Design Order Form] | ||
*[[media:131.4 Design Exception Info.doc|Design Exception Information]] | *[[media:131.4 Design Exception Info 2013.doc|Design Exception Information]] | ||
*[http://epg.modot.mo.gov/forms/DE-DEForms/Equipment%20and%20Materials%20List.dot Equipment and Materials List] | *[http://epg.modot.mo.gov/forms/DE-DEForms/Equipment%20and%20Materials%20List.dot Equipment and Materials List] |
Revision as of 10:25, 17 April 2013
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Posters, State Aid
Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.
Utility or Right of Way Related
Quick Reference Guides (QRGs)
Design
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Bridge Maintenance Repair Report (Excel)
- Cathodic System Evaluation
- CIF (Critical Inspection Finding)
- FAR (Follow-Up Action Required)
- Maintenance Material Usage (Excel)
- Maintenance Recommendation Report
- Paint Data Report (Excel)
- Photo Log Sheet (Excel)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Resource Management
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition