Category:101 Standard Forms: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m →‎Construction and Materials: Per CM, updated numerous links to forms
Smithk (talk | contribs)
m →‎Construction and Materials: Per CM, updated numerous links to forms
Line 74: Line 74:
*[http://epg.modot.mo.gov/forms/CM/Aggregate_Base_Random_Locations.xlsm Aggregate Base Random Locations]
*[http://epg.modot.mo.gov/forms/CM/Aggregate_Base_Random_Locations.xlsm Aggregate Base Random Locations]


*[http://epg.modot.mo.gov/forms/CM/As_Built_Final_Plans_Checklist_SL_District.dotx As Built Plans Checklist - SL District]
*[http://epg.modot.mo.gov/forms/CM/As_Built_Final_Plans_Checklist_SL_District.pdf As Built Plans Checklist - SL District]


*[http://epg.modot.mo.gov/forms/CM/Asbestos_Bulk_Sample_Bridge_CL_EL_5.dotx Asbestos Bulk Sample Bridge CL EL 5]
*[http://epg.modot.mo.gov/forms/CM/Asbestos_Bulk_Sample_Bridge_CL_EL_5.pdf Asbestos Bulk Sample Bridge CL EL 5]


*[http://epg.modot.mo.gov/forms/CM/Asbestos_Bulk_Sample_Parcel_CL_EL_5.dotx Asbestos Bulk Sample Parcel CL EL 5]
*[http://epg.modot.mo.gov/forms/CM/Asbestos_Bulk_Sample_Parcel_CL_EL_5.pdf Asbestos Bulk Sample Parcel CL EL 5]


*[http://epg.modot.mo.gov/forms/CM/Asbestos_Survey_Report_T746_T747_T748_C760.dotx Asbestos Survey Report - All Suspect ACM (Form T746), Nonfriable ACM (Form T747) and All Materials (Form T748)]
*[http://epg.modot.mo.gov/forms/CM/Asbestos_Survey_Report_T746_T747_T748_C760.pdf Asbestos Survey Report - All Suspect ACM (Form T746), Nonfriable ACM (Form T747) and All Materials (Form T748)]


*[http://epg.modot.mo.gov/forms/CM/Asphalt_Core_Spreadsheet.xlsx Asphalt Core Spreadsheet]
*[http://epg.modot.mo.gov/forms/CM/Asphalt_Core_Spreadsheet.xlsx Asphalt Core Spreadsheet]
Line 94: Line 94:
*[http://epg.modot.mo.gov/forms/CM/Bridge_Bearings.xlsx Bridge Bearings]
*[http://epg.modot.mo.gov/forms/CM/Bridge_Bearings.xlsx Bridge Bearings]


*[http://epg.modot.mo.gov/forms/CM/Bridge_Clearance_Report_C239A.dotx Bridge Clearance Report (C-239A)]
*[http://epg.modot.mo.gov/forms/CM/Bridge_Clearance_Report_C239A.pdf Bridge Clearance Report (C-239A)]


*[http://epg.modot.mo.gov/forms/CO/Bridge%20Fabrication%20Report.dot Bridge Fabrication Report]
*[http://epg.modot.mo.gov/forms/CO/Bridge%20Fabrication%20Report.dot Bridge Fabrication Report]
Line 110: Line 110:
*[http://epg.modot.mo.gov/forms/CM/Concrete_Cylinder_Sample_Sent_to_Central_Lab.doc Concrete Cylinder Sample Sent to Central Lab]
*[http://epg.modot.mo.gov/forms/CM/Concrete_Cylinder_Sample_Sent_to_Central_Lab.doc Concrete Cylinder Sample Sent to Central Lab]


*[http://epg.modot.mo.gov/forms/CM/Concrete_Roadway_Report.dotx Concrete Roadway Report]
*[http://epg.modot.mo.gov/forms/CM/Concrete_Roadway_Report.pdf Concrete Roadway Report]


*[http://epg.modot.mo.gov/forms/CM/Contingent_Item_Price_Check.dotx Contingent Item Price Check]
*[http://epg.modot.mo.gov/forms/CM/Contingent_Item_Price_Check.pdf Contingent Item Price Check]


*[http://epg.modot.mo.gov/forms/CM/Contractor_Performance_Evaluation_Letter.dotx Contractor Performance Evaluation Letter]
*[http://epg.modot.mo.gov/forms/CM/Contractor_Performance_Evaluation_Letter.pdf Contractor Performance Evaluation Letter]


*[http://epg.modot.mo.gov/forms/CM/Contractor_Performance_Evaluation_Signature_Page.dotx Contractor Performance Evaluation Signature Page]
*[http://epg.modot.mo.gov/forms/CM/Contractor_Performance_Evaluation_Signature_Page.pdf Contractor Performance Evaluation Signature Page]


*[http://epg.modot.mo.gov/forms/CM/C9_Daily_Utility_Report.dotx Daily Utility Report (C-9).dot]
*[http://epg.modot.mo.gov/forms/CM/C9_Daily_Utility_Report.pdf Daily Utility Report (C-9).dot]


*[http://epg.modot.mo.gov/forms/CM/Dimensions%20To%20Tons%20Converter.xlsx Dimensions To Tons Converter]
*[http://epg.modot.mo.gov/forms/CM/Dimensions%20To%20Tons%20Converter.xlsx Dimensions To Tons Converter]


*[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.dotx EEO Checklist]
*[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.pdf EEO Checklist]


*[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.dotx Fence Removal Notice]
*[http://epg.modot.mo.gov/forms/CM/EEO_Checklist.pdf Fence Removal Notice]


*[http://ghdcogwp01/c10/cgi-bin/cognosisapi.dll?b_action=cognosViewer&ui.action=run&ui.object=%2fcontent%2ffolder%5b%40name%3d%27SiteManager%20Reporting%27%5d%2ffolder%5b%40name%3d%27Headquarters%27%5d%2ffolder%5b%40name%3d%27Contract%20-Administration%27%5d%2freport%5b%40name%3d%27C239_Final_Acceptance_Report%27%5d&ui.name=C239_Final_Acceptance_Report&run.outputFormat=PDF&run.prompt=true&ui.backURL=%2fc10%2fcgi-bin%2fcognosisapi.dll%3fb_action%3dxts.run%26m%3dportal%2fcc.xts%26m_folder%3di734C7F8180CF4B9BA373FD704584E006 Final Acceptance Report (C-239), Cognos Report]
*[http://ghdcogwp01/c10/cgi-bin/cognosisapi.dll?b_action=cognosViewer&ui.action=run&ui.object=%2fcontent%2ffolder%5b%40name%3d%27SiteManager%20Reporting%27%5d%2ffolder%5b%40name%3d%27Headquarters%27%5d%2ffolder%5b%40name%3d%27Contract%20-Administration%27%5d%2freport%5b%40name%3d%27C239_Final_Acceptance_Report%27%5d&ui.name=C239_Final_Acceptance_Report&run.outputFormat=PDF&run.prompt=true&ui.backURL=%2fc10%2fcgi-bin%2fcognosisapi.dll%3fb_action%3dxts.run%26m%3dportal%2fcc.xts%26m_folder%3di734C7F8180CF4B9BA373FD704584E006 Final Acceptance Report (C-239), Cognos Report]
Line 130: Line 130:
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239.pdf Final Acceptance Report (C-239), pdf version]
*[http://epg.modot.mo.gov/forms/CM/Final_Acceptance_C_239.pdf Final Acceptance Report (C-239), pdf version]


*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.dotx Final Plans Certification]
*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Certification.pdf Final Plans Certification]


*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Checklist.dotx Final Plans Checklist]
*[http://epg.modot.mo.gov/forms/CM/Final_Plans_Checklist.pdf Final Plans Checklist]


*[http://epg.modot.mo.gov/forms/CM/KC_Final_Plans_Memo.pdf Final Plans Memo]
*[http://epg.modot.mo.gov/forms/CM/KC_Final_Plans_Memo.pdf Final Plans Memo]


*[http://epg.modot.mo.gov/forms/CM/C13_Final_Utility_Report.dotx Final Utility Report (C-13)]
*[http://epg.modot.mo.gov/forms/CM/C13_Final_Utility_Report.pdf Final Utility Report (C-13)]


*[http://epg.modot.mo.gov/forms/CM/Force_Account_Spreasheet.xlsx Force Account Spreadsheet]
*[http://epg.modot.mo.gov/forms/CM/Force_Account_Spreasheet.xlsx Force Account Spreadsheet]
Line 144: Line 144:
*[http://epg.modot.mo.gov/forms/CM/Fuel_Adjustment_Calculation.xlsx Fuel Adjustment Calculation]
*[http://epg.modot.mo.gov/forms/CM/Fuel_Adjustment_Calculation.xlsx Fuel Adjustment Calculation]


*[http://epg.modot.mo.gov/forms/CM/Inspectors_Pay_Qty_Report_IPQR.dotx Inspectors Pay Qty Report (IPQR)]
*[http://epg.modot.mo.gov/forms/CM/Inspectors_Pay_Qty_Report_IPQR.pdf Inspectors Pay Qty Report (IPQR)]


*[http://epg.modot.mo.gov/forms/CM/Internal_MoDOT_Product_Form.dotx Internal MoDOT Product Form]
*[http://epg.modot.mo.gov/forms/CM/Internal_MoDOT_Product_Form.pdf Internal MoDOT Product Form]


*[http://epg.modot.mo.gov/forms/CM/IRI_Inertial_Profiler_Report_with_Bonus.xlsm IRI Inertial Profiler Report with Bonus]
*[http://epg.modot.mo.gov/forms/CM/IRI_Inertial_Profiler_Report_with_Bonus.xlsm IRI Inertial Profiler Report with Bonus]
Line 168: Line 168:
*[http://epg.modot.mo.gov/forms/CM/JOC_Signal_and_Lighting_Repair.xlsm JOC Signal and Lighting Repair]
*[http://epg.modot.mo.gov/forms/CM/JOC_Signal_and_Lighting_Repair.xlsm JOC Signal and Lighting Repair]


*[http://epg.modot.mo.gov/forms/CM/Milestone_Worksheet.dotx Milestone Worksheet]
*[http://epg.modot.mo.gov/forms/CM/Milestone_Worksheet.pdf Milestone Worksheet]


*[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Calibration.xlsx Mobile Mixer Calibration]
*[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Calibration.pdf Mobile Mixer Calibration]


*[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Verification_Sheet.dotx Mobile Mixer Verification Sheet]
*[http://epg.modot.mo.gov/forms/CM/Mobile_Mixer_Verification_Sheet.dotx Mobile Mixer Verification Sheet]


*[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_C709ND.dotx Nuclear Density (C-709ND)]
*[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_C709ND.pdf Nuclear Density (C-709ND)]


*[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_of_Plastic_Portland_Cement_Concrete_C_710ND.dotx Nuclear Density of Plastic Portland Cement Concrete (C-710ND)]
*[http://epg.modot.mo.gov/forms/CM/Nuclear_Density_of_Plastic_Portland_Cement_Concrete_C_710ND.pdf Nuclear Density of Plastic Portland Cement Concrete (C-710ND)]


*[http://epg.modot.mo.gov/forms/CM/Order_Record.dotx Order Record (C-259)]
*[http://epg.modot.mo.gov/forms/CM/Order_Record.pdf Order Record (C-259)]


*[http://epg.modot.mo.gov/forms/CM/Outlier%20Analysis.xls Outlier Analysis]
*[http://epg.modot.mo.gov/forms/CM/Outlier%20Analysis.xls Outlier Analysis]


*[http://epg.modot.mo.gov/forms/CM/Pavement_Type_Selection_Submittal.dotx Pavement Type Selection Submittal Information (PTS Submittal Form)]
*[http://epg.modot.mo.gov/forms/CM/Pavement_Type_Selection_Submittal.pdf Pavement Type Selection Submittal Information (PTS Submittal Form)]


*[http://epg.modot.mo.gov/forms/CM/Payroll_Log.xltx Payroll Log Form]
*[http://epg.modot.mo.gov/forms/CM/Payroll_Log.xltx Payroll Log Form]
Line 188: Line 188:
*[http://epg.modot.mo.gov/forms/CM/Pile%20Driving%20Chart2.xls Pile Driving Chart]
*[http://epg.modot.mo.gov/forms/CM/Pile%20Driving%20Chart2.xls Pile Driving Chart]


*[http://epg.modot.mo.gov/forms/CM/Pile_Driving_Data.dotx Pile Driving Data]
*[http://epg.modot.mo.gov/forms/CM/Pile_Driving_Data.pdf Pile Driving Data]


*[http://epg.modot.mo.gov/forms/CM/Pore_Pressure_Report_Type_A.dotx Pore Pressure Report - Type A]
*[http://epg.modot.mo.gov/forms/CM/Pore_Pressure_Report_Type_A.pdf Pore Pressure Report - Type A]


*[http://epg.modot.mo.gov/forms/CM/Pore_Pressure_Report_Type_B.dotx Pore Pressure Report - Type B]
*[http://epg.modot.mo.gov/forms/CM/Pore_Pressure_Report_Type_B.pdf Pore Pressure Report - Type B]


<div id="PreCon Letter - Federal No Trainees"></div>
<div id="PreCon Letter - Federal No Trainees"></div>
*[http://epg.modot.mo.gov/forms/CM/PreCon_Letter_Federal.dotx PreCon Letter - Federal]
*[http://epg.modot.mo.gov/forms/CM/PreCon_Letter_Federal.pdf PreCon Letter - Federal]


*[http://epg.modot.mo.gov/forms/CM/PreCon_Letter_State.dotx PreCon Letter - State]
*[http://epg.modot.mo.gov/forms/CM/PreCon_Letter_State.pdf PreCon Letter - State]


*[http://epg.modot.mo.gov/forms/CM/Prestress_Deficiency_Report.dotx Prestress Deficiency Report (1029-01)]
*[http://epg.modot.mo.gov/forms/CM/Prestress_Deficiency_Report.pdf Prestress Deficiency Report (1029-01)]


*[http://epg.modot.mo.gov/forms/CM/Price_Verification.xlsx Price Verification]
*[http://epg.modot.mo.gov/forms/CM/Price_Verification.xlsx Price Verification]


*[http://epg.modot.mo.gov/forms/CM/Railroad_Crossing_Inspection.dotx Railroad Crossing Inspection]
*[http://epg.modot.mo.gov/forms/CM/Railroad_Crossing_Inspection.pdf Railroad Crossing Inspection]


*[http://epg.modot.mo.gov/forms/CM/RE_Letterhead.dotx RE Letterhead]
*[http://epg.modot.mo.gov/forms/CM/RE_Letterhead.pdf RE Letterhead]


*[http://epg.modot.mo.gov/forms/CM/Retroreflectivity_Payment_Adjustment.xlsm Retroreflectivity Payment Adjustment]
*[http://epg.modot.mo.gov/forms/CM/Retroreflectivity_Payment_Adjustment.xlsm Retroreflectivity Payment Adjustment]
Line 235: Line 235:
*[http://epg.modot.mo.gov/forms/CM/RM_Water_Calibration.dotx RM Water Calibration]
*[http://epg.modot.mo.gov/forms/CM/RM_Water_Calibration.dotx RM Water Calibration]


*[http://epg.modot.mo.gov/forms/CM/RoCap_Test_Form_Long_Bolts.dotx RoCap Test Form - Long Bolts]
*[http://epg.modot.mo.gov/forms/CM/RoCap_Test_Form_Long_Bolts.pdf RoCap Test Form - Long Bolts]


*[http://epg.modot.mo.gov/forms/CM/RoCap_Test_Form_Short_Bolts.dotx RoCap Test Form - Short Bolts]
*[http://epg.modot.mo.gov/forms/CM/RoCap_Test_Form_Short_Bolts.pdf RoCap Test Form - Short Bolts]


*[http://epg.modot.mo.gov/forms/CM/Semi_Annual_Labor_Compliance_Report.dotx Semi-annual Labor Compliance Report]
*[http://epg.modot.mo.gov/forms/CM/Semi_Annual_Labor_Compliance_Report.dotx Semi-annual Labor Compliance Report]
Line 306: Line 306:
:* [http://epg.modot.org/forms/CM/Subcontractor_Certification_Regarding_Affirmative_Action.pdf Subcontractor Certification Regarding Affirmative Action]
:* [http://epg.modot.org/forms/CM/Subcontractor_Certification_Regarding_Affirmative_Action.pdf Subcontractor Certification Regarding Affirmative Action]


:* [http://epg.modot.org/forms/CM/Value_Engineering_Proposal_C_104.doc Value Engineering Change Proposal (C-104)]
:* [http://epg.modot.org/forms/CM/Value_Engineering_Proposal_C_104.pdf Value Engineering Change Proposal (C-104)]


:* [http://epg.modot.org/forms/CM/Wage_Flow_Chart_for_Federal_Jobs.pdf Wage Flowchart for Federal Jobs – Precon]
:* [http://epg.modot.org/forms/CM/Wage_Flow_Chart_for_Federal_Jobs.pdf Wage Flowchart for Federal Jobs – Precon]

Revision as of 06:59, 22 October 2018

EPG articles are not referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding).

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

Construction and Materials

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer


Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Hearings

Materials

Photo


Planning

Right of Way

Scoping

Survey

External Civil Rights

Financial Services

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services


Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition