Category:101 Standard Forms: Difference between revisions
Jump to navigation
Jump to search
m →Construction and Materials: clarification between “Contractor Performance Rating” and “Contractor Questionnaire", per Constr & Matls |
m correct links for forms 3.4-1A, 3.4-1B and 3.4-2A to RW folder rather than DE-ROW folder |
||
Line 631: | Line 631: | ||
*[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Request%20for%20Acquisition%20Authority_Form%203-6_10A.dot Request for Acquisition Authority_(Form 3-6_10A)] | *[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Request%20for%20Acquisition%20Authority_Form%203-6_10A.dot Request for Acquisition Authority_(Form 3-6_10A)] | ||
*[http://epg.modot.mo.gov/forms/ | *[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Request%20for%20Federal%20Funding_Limited%20Acquisition%20Authority_Form%203-4_1A.dot Request for Federal Funding_Limited Acquisition Authority_(Form 3-4_1A)] | ||
*[http://epg.modot.mo.gov/forms/ | *[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Request%20for%20Limited%20Acquisition%20Authority_Form%203-4_1B.dot Request for Limited Acquisition Authority_(Form 3-4_1B)] | ||
*[http://epg.modot.mo.gov/forms/ | *[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Request%20for%20Federal%20Funding_Form%203-4_2A.dot Request for Federal Funding_(Form 3-4_2A)] | ||
*[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Right%20of%20Way%20Cost%20Estimate%20Worksheet_Form%203-3_3A.dot Right of Way Cost Estimate Worksheet_(Form 3-3_3A)] | *[http://epg.modot.mo.gov/forms/RW/Chapter%203_Administration/Right%20of%20Way%20Cost%20Estimate%20Worksheet_Form%203-3_3A.dot Right of Way Cost Estimate Worksheet_(Form 3-3_3A)] |
Revision as of 12:15, 25 February 2009
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
Materials Related
Posters, Federal Aid
- Equal Employment Opportunity (also available en español)
- Important Wage Rate Info FHWA-1495 (also available en español)
- Job Safety and Health OSHA (also available en español)
- Minimum Wage 1088 (also available en español)
- Notice Polygraph WH 1462 (also available en español)
Posters, State Aid
- Workers Compensation WC 106 (also available en español)
Utility or Right of Way Related
Design
Bridge
Checklist
Computer
Contracts
Design Forms
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Maintenance
Bridge Maintenance
- Blank Inspection Report
- Maintenance Material Usage (Excel)
- Paint Data Report (Excel)
- Maintenance Recommendation Report
- Bridge Maintenance Repair Report (Excel)
- Photo Log Sheet (Excel)
- FAR (Follow-Up Action Required)
- CIF (Critical Inspection Finding)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition