Search results

Jump to navigation Jump to search
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)

Page title matches

  • [[image:106.jpg|right|375px]] ...tions-highway-construction Sec 106] establishes the respective obligations of contractor and MoDOT concerning materials to be used. ...
    25 members (1 subcategory, 0 files) - 09:57, 13 December 2024

Page text matches

  • [[image:106.20.jpg|right|350px]] ...tps://www.modot.org/research-publications Research Publications] lists all of MoDOT's online research publications by date. Publications may be availabl ...
    682 bytes (92 words) - 14:34, 6 August 2021
  • ...on of the plant making the shipment, of each shipment of all pipe and pipe material found in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf AASHTOWARE Project (AWP) sample IDs will be assigned to pipe and pipe material as described in the applicable Specification section. ...
    2 KB (315 words) - 08:37, 16 November 2021
  • ...erformed on the sample are designated by the inspector in the remarks area of AASHTOWARE Project (AWP). ...of weight (mass) of coating]] for additional information on the proper use of the magnetic gage. Original test data and calculations shall be recorded i ...
    2 KB (262 words) - 11:02, 14 September 2021
  • <categorytree mode=all>103 Award and Execution of Contract</categorytree> <categorytree mode=all>105 Control of Work</categorytree> ...
    49 members (48 subcategories, 0 files) - 08:57, 15 November 2022
  • ...usiness/materials/pdf/PAL/concrete%20curing%20material.pdf Concrete Curing Material Pre-Acceptance List]. Samples from each lot of Type l-D - clear or transparent, or Type 2 Class A - white pigmented, mater ...
    3 KB (399 words) - 08:58, 24 November 2021
  • [[image:106.jpg|right|375px]] ...tions-highway-construction Sec 106] establishes the respective obligations of contractor and MoDOT concerning materials to be used. ...
    25 members (1 subcategory, 0 files) - 09:57, 13 December 2024
  • ...ateral loads, damage is reduced. The pull box costs the same but labor and material for the concrete pad is eliminated.'''</center>]] ...procedures for inspecting, [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]] and reporting pull boxes, junction ...
    0 members (0 subcategories, 0 files) - 10:49, 19 October 2021
  • ...e and Magnesium Oxide in Hydrated Lime|EPG 106.3.2.27 TM-27, Determination of Calcium Oxide and Magnesium Oxide in Hydrated Lime]]. Qualification of non-metallic expansive mortars for compliance with [http://www.modot.org/bu ...
    2 KB (312 words) - 11:06, 14 September 2021
  • :(b) Rule with suitable graduations to accurately measure the material to be inspected. ...roducts are to be inspected by an approved inspection agency with the cost of inspection to be borne by the contractor in accordance with [http://www.mod ...
    1 member (0 subcategories, 0 files) - 13:15, 15 October 2021
  • ...procedures for inspecting, [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]] and reporting polyethylene sheeting. Refer to [ Se ...e width of the roll and is to be cut at least 5 ft. (1500 mm) from the end of the roll. The samples are to be submitted to the Laboratory for testing thr ...
    0 members (0 subcategories, 0 files) - 10:10, 18 October 2021
  • [[image:106.19.jpg|right|125px]] * The Material Safety Data Sheet ...
    4 KB (604 words) - 15:52, 22 October 2024
  • ...tp://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.11], Metric Implementation, will handle most authority needed for enforceme ...e not exact equivalents; therefore, each system must be used independently of the other. ...
    4 KB (648 words) - 12:04, 18 February 2022
  • ...o cite any shortages of material inspection or circumstances of acceptance of materials, which did not receive normal inspection. The Construction and Ma ...lerance should be used judicially, dependent upon the type and quantity of material represented. ...
    8 KB (1,209 words) - 08:04, 1 October 2021
  • ...that must comply with Buy America. These are listed under Sec 106.9.6 and 106.9.7, respectively, in the specifications, currently available in the [https ==106.9.1 Requirements for Construction Materials other than iron and steel mater ...
    9 KB (1,274 words) - 09:54, 14 November 2023
  • ...ified as either special designs or as shop drawings. If the classification of the drawing(s) is unclear, ask the producer for clarification. A copy of all files related to special designs and shop drawings are to be retained i ...
    4 KB (622 words) - 15:12, 10 July 2023
  • ...metallic conduit and fittings to be used as a raceway for wires and cables of an electrical system. Refer to [http://www.modot.org/business/standards_an :(a) Scales or balance accurate to within 0.5 percent of the weight (mass) of the sample to be weighed. ...
    1 member (0 subcategories, 0 files) - 14:05, 17 July 2023
  • [[image:106.8.jpg|right|400px]] ==106.19.1 Certifications== ...
    15 KB (2,324 words) - 13:30, 1 March 2022
  • This article establishes procedures for calibration of scales, material proportioning plants, bituminous distributors and field testing equipment. ...verifications performed by MoDOT personnel have become the responsibility of the contractor or producer. In those cases, the inspector’s job now is to r ...
    15 KB (2,285 words) - 11:02, 8 December 2021
  • |'''[[:Category:106.3.2 Material Inspection Test Methods|EPG 106.3.2 MoDOT Test Methods]]''' ...mple, identify and ship a sample. Also included in this article is a list of MoDOT test methods utilized by MoDOT and information regarding non-MoDOT te ...
    17 KB (2,489 words) - 14:19, 10 September 2021
  • ...establishes inspection and [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]] procedures for fencing materials except wood posts, :(a) Magnetic gauge, reading range of 0-40 mils (0-1000 <sub><math>\mu\,</math></sub>m). ...
    1 member (0 subcategories, 0 files) - 13:45, 1 October 2021
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)