Talk:104.7 Scoping Estimates

From Engineering_Policy_Guide
Revision as of 11:53, 22 May 2008 by EPG-Admin (talk | contribs)
Jump to navigation Jump to search

Year of Estimate Figures

Please add the year to the "cost estimate guide for rural preliminary design" document. Knowing the year these costs are representative of would allow adjustment for inflation.

Dan Tschirgi: The last date these figures were updated was added to the heading of this figure, to use in those instances where application of inflation rates is appropriate.