718.1 Construction Inspection for Sec 718

This work consists of building temporary bridges as called for in the plans. The contractor is responsible for maintaining the bride and removing it when its use is no longer needed. If the temporary bridge washes out through no negligence or fault of the contractor the Commission will bear the actual cost of replacement.

Where steel grid systems are used for the superstructure they may be either state furnished or contractor furnished. In either case the grid system will remain the property of the Commission and should be stored as set out in the contract. The grid system should be inspected prior to storing to see that it is in a satisfactory condition.

Temporary bridges are paid for on a lump sum basis but the inspector should note in the diary that the structure was built according to plan or approved changes. The date the structure was placed in and taken out of service should be recorded.

718.2 Materials Inspection for Sec 718

No additional guidance - refer to Standard Specification 718.

718.3 Laboratory Testing for Sec 718

No additional guidance - refer to Standard Specification 718.