User contributions for Hoskir
Jump to navigation
Jump to search
21 April 2023
- 07:5907:59, 21 April 2023 diff hist 0 File:134.5.2 2017.docx Hoskir uploaded a new version of File:134.5.2 2017.docx current
20 April 2023
- 14:3014:30, 20 April 2023 diff hist −5 m Category:402 Bituminous Surface Leveling No edit summary
- 14:2114:21, 20 April 2023 diff hist −70 m Category:402 Bituminous Surface Leveling No edit summary
- 14:2014:20, 20 April 2023 diff hist 0 N File:CLC plans 2024.pdf No edit summary current
- 14:1814:18, 20 April 2023 diff hist 0 N File:402 FY2024 Contract Leveling Course Guidelines.docx No edit summary current
- 14:1814:18, 20 April 2023 diff hist 0 N File:402 FY2024 Contract Leveling Course Book Job Guidelines.docx No edit summary current
- 14:1714:17, 20 April 2023 diff hist −142 Category:409 Seal Coat 2024 Seal Coat updates
- 14:1414:14, 20 April 2023 diff hist 0 N File:Seal Coat plans 2024.pdf No edit summary current
- 14:1214:12, 20 April 2023 diff hist 0 N File:409 FY2024 Contract Seal Coat Book Job Guidelines.docx No edit summary current
- 14:1114:11, 20 April 2023 diff hist 0 N File:409 FY2024 Contract Seal Coat Guidelines.docx No edit summary current
- 13:3013:30, 20 April 2023 diff hist −3 Job Special Provisions No edit summary
- 12:2812:28, 20 April 2023 diff hist −2 Job Special Provisions updated JSP's for July
- 07:5407:54, 20 April 2023 diff hist +2 m Category:409 Seal Coat updated JSP links
19 April 2023
- 15:0815:08, 19 April 2023 diff hist −32 m 620.12 Construction Inspection for Sec 620 updated link to Retroreflectometer Request in two places
- 11:2111:21, 19 April 2023 diff hist +153 751.50 Standard Detailing Notes →H4. Conduit System: updated per RR 3631
- 11:0711:07, 19 April 2023 diff hist +1,335 751.10 General Superstructure →751.10.4 Conduit Systems: updated per RR 3631
- 10:5610:56, 19 April 2023 diff hist 0 N File:751.10.4-Wing Section AA-Feb-23.jpg No edit summary current
- 10:5610:56, 19 April 2023 diff hist 0 N File:751.10.4-Single Conduit in Slab-Feb-23.jpg No edit summary current
- 10:5510:55, 19 April 2023 diff hist 0 N File:751.10.4-Single Conduit in Barrier-Feb-23.jpg No edit summary current
- 10:5510:55, 19 April 2023 diff hist 0 N File:751.10.4-Section Suspended Conduit-Feb-23.jpg No edit summary current
- 10:5510:55, 19 April 2023 diff hist 0 N File:751.10.4-Section Suspended Conduit DetailA-Feb-23.jpg No edit summary current
- 10:5510:55, 19 April 2023 diff hist 0 N File:751.10.4-Multiple Conduits in Safety Barrier-Feb-23.jpg No edit summary current
- 10:5410:54, 19 April 2023 diff hist 0 N File:751.10.4-Multiple Conduits in Deepened Slab-Feb-23.jpg No edit summary current
- 10:5410:54, 19 April 2023 diff hist 0 N File:751.10.4-Junction Box-Feb-23.jpg No edit summary current
- 10:5410:54, 19 April 2023 diff hist 0 N File:751.10.4-Junction Box in Wing-Feb-23.jpg No edit summary current
- 10:5310:53, 19 April 2023 diff hist 0 N File:751.10.4-Junction Box in Barrier-Feb-23.jpg No edit summary current
- 10:5310:53, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb-Feb-23.jpg No edit summary current
- 10:5310:53, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb Section Single Conduit-Feb-23.jpg No edit summary current
- 10:5310:53, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb Section Multiple Conduit-Feb-23.jpg No edit summary current
- 10:5210:52, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb Section BB-Feb-23.jpg No edit summary current
- 10:5210:52, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb over Slab-Feb-23.jpg No edit summary current
- 10:5210:52, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb Detail B-Feb-23.jpg No edit summary current
- 10:5110:51, 19 April 2023 diff hist 0 N File:751.10.4-Barrier Curb Detail A-Feb-23.jpg No edit summary current
- 10:1810:18, 19 April 2023 diff hist +880 751.22 Prestressed Concrete I Girders →751.22.3.6 Camber, Haunching, and Stepping and Sloping of Top Flange: updated per RR 3648
- 10:1510:15, 19 April 2023 diff hist +880 751.22 Prestressed Concrete I Girders →751.22.2.6 Deformations: updated per RR 3648
- 10:1110:11, 19 April 2023 diff hist +573 Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.13 Inspection of Completed Members: updated per RR 3648 current
- 10:0810:08, 19 April 2023 diff hist −158 748.7 Bridge Deck and Bridge End Drainage →748.7.11 Drain Flumes: updated per RR 3656 current
- 10:0010:00, 19 April 2023 diff hist −345 750.6 Erosion Control and Energy Dissipation →750.6.3.3 Rock Ditch Liner: updated per RR 3656 (last paragraph only) current
- 09:5509:55, 19 April 2023 diff hist −9 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.69 Direction Indicator Barricades (MUTCD 6F.69): updated per RR 3671
- 09:5309:53, 19 April 2023 diff hist −4 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.67 Drums (MUTCD 6F.67): updated per RR 3671
- 09:5209:52, 19 April 2023 diff hist −7 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.66 Vertical Panels (MUTCD 6F.66): updated per RR 3671
- 09:4909:49, 19 April 2023 diff hist −8 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.65 Tubular Markers (MUTCD 6F.65): updated per RR 3671
- 09:4809:48, 19 April 2023 diff hist −5 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.64.2 Trim-lines: updated per RR 3671
- 09:4609:46, 19 April 2023 diff hist −1 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.16 Warning Sign Function, Design and Application (MUTCD 6F.16): updated per RR 3671
- 09:4309:43, 19 April 2023 diff hist 0 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.3 Sign Dimension: updated per RR 3671
- 09:3309:33, 19 April 2023 diff hist −3 Category:403 Asphaltic Concrete Pavement →403.1.21 Basis of Payment (Sec 403.23): updated per RR 3644 (Pay Factors (Sec 403.23.7.2) only
- 09:2709:27, 19 April 2023 diff hist −7 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: updated per RR 3644
- 09:2409:24, 19 April 2023 diff hist −58 Category:401 Bituminous Base and Pavement →401.1.2 Plant Mix Bituminous Pavement (PMBP): updated per RR 3644 current
- 09:2409:24, 19 April 2023 diff hist +438 Category:450 Bituminous Pavement Design updated per RR 3644 current
- 09:0909:09, 19 April 2023 diff hist +88 Category:401 Bituminous Base and Pavement →401.2.7 Quality Control (Sec 401.8): updated per RR 3663