User contributions for Hoskir
Jump to navigation
Jump to search
21 September 2022
- 12:4412:44, 21 September 2022 diff hist +8 Category:606 Guardrail and Guard Cable No edit summary
- 12:3912:39, 21 September 2022 diff hist +7 m Category:606 Guardrail and Guard Cable updated Guard Cable - Testing Criteria to MASH 2016
- 12:1912:19, 21 September 2022 diff hist +19 Category:241 Aesthetic Considerations updated to MASH 2016 and AASHTO 2016 current
- 09:4509:45, 21 September 2022 diff hist −78 m 238.2 Land Surveying updated the links to Standard Plan 602.00
- 07:4807:48, 21 September 2022 diff hist +22 m Category:134 Engineering Professional Services updated link to the 2012 UAG
20 September 2022
- 09:3409:34, 20 September 2022 diff hist +11 236.7 Negotiation →236.7.2.4 Offer Letter and Supporting Documentation
16 September 2022
- 08:1108:11, 16 September 2022 diff hist 0 640.1 Pavement Drainage →640.1.3.2 Composite Curb-and-Gutter Sections current
- 07:5107:51, 16 September 2022 diff hist −1 m Category:128 Conceptual Studies Changed the RES Instructions from a docx to a PDF
- 07:5107:51, 16 September 2022 diff hist −1 m Category:101 Standard Forms →Environmental and Cultural
- 07:5007:50, 16 September 2022 diff hist −1 127.1 Request for Environmental Services Changed the RES Instructions from a docx to a PDF
- 07:4807:48, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.pdf No edit summary
- 07:1907:19, 16 September 2022 diff hist +11 m Category:128 Conceptual Studies updated the RES Form Instructions
- 07:1807:18, 16 September 2022 diff hist +11 m 127.1 Request for Environmental Services updated the RES Form Instructions
- 07:1507:15, 16 September 2022 diff hist +11 Category:101 Standard Forms →Environmental and Cultural
- 06:5806:58, 16 September 2022 diff hist 0 N File:2022-08-31 RES Instruction Manual.docx No edit summary
13 September 2022
- 08:2408:24, 13 September 2022 diff hist +978 m 806.1 Erosion Control Measures →806.1.7.1 Design Considerations
12 September 2022
7 September 2022
- 08:1908:19, 7 September 2022 diff hist 0 LPA:136.6 Environmental and Cultural Requirements No edit summary
- 08:1708:17, 7 September 2022 diff hist +43 N File:136.6.16 2022.pdf LPA Project Process Checklist current
- 07:1707:17, 7 September 2022 diff hist +17 LPA:136.6 Environmental and Cultural Requirements No edit summary
- 07:1207:12, 7 September 2022 diff hist +31 N File:136.6.15 e106 Example 2022.pdf e106 Form Example current
2 September 2022
- 13:5713:57, 2 September 2022 diff hist +63 237.8 Contract Time No edit summary
1 September 2022
- 13:5713:57, 1 September 2022 diff hist −5 m Category:171 Maintenance Policy and Operations No edit summary
- 13:5613:56, 1 September 2022 diff hist +12 m Category:171 Maintenance Policy and Operations Revised per revision request 3549
- 13:5413:54, 1 September 2022 diff hist +16 m Category:171 Maintenance Policy and Operations Revised per revision request 3549
- 13:4313:43, 1 September 2022 diff hist +325 616.23 Traffic Control for Field Operations Revised per revision request 3549