User contributions for Smithk
Jump to navigation
Jump to search
21 June 2022
- 11:5411:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
17 June 2022
- 07:3607:36, 17 June 2022 diff hist −43 m Main Page updated broken links
- 06:2406:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
16 June 2022
- 10:2610:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
15 June 2022
- 07:3807:38, 15 June 2022 diff hist −58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
8 June 2022
- 10:1810:18, 8 June 2022 diff hist −27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
3 June 2022
- 14:1114:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 08:2208:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 08:1708:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 07:2007:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 07:1907:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 07:1907:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 07:1807:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 07:1707:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 07:1707:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 07:1607:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 07:1607:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 07:1607:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 07:1507:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map
- 07:1407:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map
- 07:1407:14, 3 June 2022 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Per TP, updated Major Highway System map
- 07:1207:12, 3 June 2022 diff hist 0 m 236.13 Designing Right of Way Plans Per TP, updated Major Highway System map
- 07:1207:12, 3 June 2022 diff hist 0 m Category:232 Facility Selection Per TP, updated Major Highway System map
- 07:1107:11, 3 June 2022 diff hist 0 m 231.4 Shoulder Width Per TP, updated Major Highway System map
- 07:1007:10, 3 June 2022 diff hist 0 m 144.5 Pavement Maintenance Per TP, updated Major Highway System map
- 07:0907:09, 3 June 2022 diff hist 0 m Category:144 Practical Operations Per TP, updated Major Highway System map
- 07:0807:08, 3 June 2022 diff hist 0 m 133.5 Operator’s Guide for Anti-Icing Per TP, updated Major Highway System map current
- 07:0707:07, 3 June 2022 diff hist 0 N File:144 Major Highway System 2022.pdf No edit summary current
- 07:0607:06, 3 June 2022 diff hist 0 m 121.5 Asset Management Per TP, updated Major Highway System map
2 June 2022
- 14:0614:06, 2 June 2022 diff hist +12 m LPA:136.13 LPA Policy Changes EPG 136.8
- 13:5713:57, 2 June 2022 diff hist +559 m LPA:136.13 LPA Policy Changes EPG 136.8
- 13:4613:46, 2 June 2022 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition Per RW, increased the value of waiver valuations to $25,000 (from $10,000), per FHWA's approval in 2021
- 09:4509:45, 2 June 2022 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.7.2 Reinforcement
- 09:4309:43, 2 June 2022 diff hist +4 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 09:4209:42, 2 June 2022 diff hist +72 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
1 June 2022
- 12:2312:23, 1 June 2022 diff hist +429 m Recent Policy Changes in the EPG EPG 751
- 11:2311:23, 1 June 2022 diff hist +8 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Concrete Shear Blocks: updated a link
- 10:2910:29, 1 June 2022 diff hist +24 m 751.50 Standard Detailing Notes updated links
- 10:2610:26, 1 June 2022 diff hist −92 m 751.11 Bearings updated links
- 10:2310:23, 1 June 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams updated links
- 10:2110:21, 1 June 2022 diff hist 0 m 751.9 Bridge Seismic Design updated links
- 10:1310:13, 1 June 2022 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 10:1010:10, 1 June 2022 diff hist 0 N File:751.22.3.10 Open2.jpg No edit summary current
- 10:0910:09, 1 June 2022 diff hist 0 N File:751.22.3.10 Open1.jpg No edit summary current
- 10:0810:08, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed2.jpg No edit summary current
- 10:0510:05, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed1.jpg No edit summary current
- 10:0310:03, 1 June 2022 diff hist 0 N File:751.22.3.9.3 2022.jpg No edit summary current
- 10:0110:01, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU2.jpg No edit summary current
- 09:5909:59, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU1.jpg No edit summary current
- 09:5809:58, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee2.jpg No edit summary current