User contributions for Smithk
Jump to navigation
Jump to search
21 June 2022
- 12:5412:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
17 June 2022
- 08:3608:36, 17 June 2022 diff hist −43 m Main Page updated broken links
- 07:2407:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
16 June 2022
- 11:2611:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
15 June 2022
- 08:3808:38, 15 June 2022 diff hist −58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
8 June 2022
- 11:1811:18, 8 June 2022 diff hist −27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
3 June 2022
- 15:1115:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 09:2209:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 09:1709:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 08:2008:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 08:1908:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 08:1908:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 08:1808:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 08:1708:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 08:1708:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 08:1608:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 08:1608:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 08:1608:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 08:1508:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map
- 08:1408:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map
- 08:1408:14, 3 June 2022 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Per TP, updated Major Highway System map
- 08:1208:12, 3 June 2022 diff hist 0 m 236.13 Designing Right of Way Plans Per TP, updated Major Highway System map
- 08:1208:12, 3 June 2022 diff hist 0 m Category:232 Facility Selection Per TP, updated Major Highway System map
- 08:1108:11, 3 June 2022 diff hist 0 m 231.4 Shoulder Width Per TP, updated Major Highway System map
- 08:1008:10, 3 June 2022 diff hist 0 m 144.5 Pavement Maintenance Per TP, updated Major Highway System map
- 08:0908:09, 3 June 2022 diff hist 0 m Category:144 Practical Operations Per TP, updated Major Highway System map
- 08:0808:08, 3 June 2022 diff hist 0 m 133.5 Operator’s Guide for Anti-Icing Per TP, updated Major Highway System map current
- 08:0708:07, 3 June 2022 diff hist 0 N File:144 Major Highway System 2022.pdf No edit summary current
- 08:0608:06, 3 June 2022 diff hist 0 m 121.5 Asset Management Per TP, updated Major Highway System map
2 June 2022
- 15:0615:06, 2 June 2022 diff hist +12 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:5714:57, 2 June 2022 diff hist +559 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:4614:46, 2 June 2022 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition Per RW, increased the value of waiver valuations to $25,000 (from $10,000), per FHWA's approval in 2021
- 10:4510:45, 2 June 2022 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.7.2 Reinforcement
- 10:4310:43, 2 June 2022 diff hist +4 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:4210:42, 2 June 2022 diff hist +72 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
1 June 2022
- 13:2313:23, 1 June 2022 diff hist +429 m Recent Policy Changes in the EPG EPG 751
- 12:2312:23, 1 June 2022 diff hist +8 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Concrete Shear Blocks: updated a link
- 11:2911:29, 1 June 2022 diff hist +24 m 751.50 Standard Detailing Notes updated links
- 11:2611:26, 1 June 2022 diff hist −92 m 751.11 Bearings updated links
- 11:2311:23, 1 June 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams updated links
- 11:2111:21, 1 June 2022 diff hist 0 m 751.9 Bridge Seismic Design updated links
- 11:1311:13, 1 June 2022 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 11:1011:10, 1 June 2022 diff hist 0 N File:751.22.3.10 Open2.jpg No edit summary current
- 11:0911:09, 1 June 2022 diff hist 0 N File:751.22.3.10 Open1.jpg No edit summary current
- 11:0811:08, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed2.jpg No edit summary current
- 11:0511:05, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed1.jpg No edit summary current
- 11:0311:03, 1 June 2022 diff hist 0 N File:751.22.3.9.3 2022.jpg No edit summary current
- 11:0111:01, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU2.jpg No edit summary current
- 10:5910:59, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU1.jpg No edit summary current
- 10:5810:58, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee2.jpg No edit summary current