- 13:3413:34, 3 May 2022 diff hist 0 N File:127.2.6 brochure.pdf No edit summary current
- 13:3313:33, 3 May 2022 diff hist 0 N File:127.2.6 sample letter.docx No edit summary
- 13:3313:33, 3 May 2022 diff hist −40 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated broken links
- 07:1707:17, 3 May 2022 diff hist +16 m LPA:136.11 Local Public Agency Construction Per LPA, updated links
- 07:1407:14, 3 May 2022 diff hist +2 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, updated link
- 07:1307:13, 3 May 2022 diff hist +2 m LPA:136.7 Design Per LPA, updated link
- 07:1207:12, 3 May 2022 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated link
- 06:5706:57, 3 May 2022 diff hist +2 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated link
- 06:5606:56, 3 May 2022 diff hist +2 m LPA:136.1 Introduction Per LPA, updated link
- 06:5406:54, 3 May 2022 diff hist +2 m LPA:136 Local Public Agency (LPA) Policy Per LPA, updated link
- 06:3806:38, 3 May 2022 diff hist +10 m Category:108 Prosecution and Progress →108.16.1 Informational Dates: updated link
29 April 2022
- 14:0514:05, 29 April 2022 diff hist +100 m Recent Policy Changes in the EPG No edit summary
- 13:5613:56, 29 April 2022 diff hist −49 m Recent Policy Changes in the EPG EPG 105, EPG 109.8
- 12:5212:52, 29 April 2022 diff hist +3 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents
- 12:4512:45, 29 April 2022 diff hist +2 m Category:105 Control of Work →105.15.1.4 Acceptance for Maintenance (Final Inspection)
- 12:4212:42, 29 April 2022 diff hist +268 m Category:105 Control of Work →105.15 Project Acceptance: inserted links
- 12:3612:36, 29 April 2022 diff hist +6 m Category:105 Control of Work →105.15 Project Acceptance
- 12:3612:36, 29 April 2022 diff hist +68 m Category:105 Control of Work →105.15 Project Acceptance: inserted link
- 12:3112:31, 29 April 2022 diff hist +89 m Category:105 Control of Work →105.15.2.1 Contractor Delays in Submittal of Final Acceptance Documents: inserted link
- 12:2012:20, 29 April 2022 diff hist −1,461 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, clarified and updated project acceptance guidance to current practice by deleting "Sample Letters to Address Final Paperwork Requirements for Contractors"
- 12:0512:05, 29 April 2022 diff hist +306 m Category:109 Measurement and Payment →109.8 Final Acceptance and Payment (for Sec 109.8): Per CM, clarifying and updating guidance to current practice.
- 11:4811:48, 29 April 2022 diff hist +96 m Category:108 Prosecution and Progress inserted links
- 11:4411:44, 29 April 2022 diff hist −3,080 m Category:108 Prosecution and Progress →108.16.1 Informational Dates: Per CM, clarified and updated Date of Final Inspection guidance to current practice.
- 11:3811:38, 29 April 2022 diff hist +1 m Category:108 Prosecution and Progress updated link
- 11:1011:10, 29 April 2022 diff hist +81 m Category:105 Control of Work →105.15.2 Final Acceptance: inserted link
- 11:0911:09, 29 April 2022 diff hist +83 m Category:105 Control of Work →105.15.2 Final Acceptance: inserted link
- 11:0511:05, 29 April 2022 diff hist +395 m Category:105 Control of Work inserted link
- 10:2910:29, 29 April 2022 diff hist +65 m Category:105 Control of Work inserted link
- 10:2410:24, 29 April 2022 diff hist +60 m Category:105 Control of Work →105.15.2 Final Acceptance: uploaded link
- 10:1210:12, 29 April 2022 diff hist +12,297 m Category:105 Control of Work Per CM, clarifying and updating guidance to current practice. Replaced EPG 105.15 Acceptance (Sec 105.15) with EPG 105.15 Project Acceptance.
- 09:0709:07, 29 April 2022 diff hist +37 m Category:107 Legal Relations and Responsibility to the Public No edit summary
- 07:5207:52, 29 April 2022 diff hist 0 m Help Article →Division Contacts
28 April 2022
- 13:5313:53, 28 April 2022 diff hist +174 m 127.9 Floodplain Management →127.9.3.1 Requirement Determination: Per BR, updated broken Memorandum of Agreement with SEMA current
- 11:1311:13, 28 April 2022 diff hist +1 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions
- 09:1409:14, 28 April 2022 diff hist 0 N File:616.13 WZ Impact April 2022.xlsm No edit summary current
- 09:1309:13, 28 April 2022 diff hist +12 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated WZ Impact Analysis Spreadsheet
- 06:3006:30, 28 April 2022 diff hist −39 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.4 Survey (.dgn) file: Per CADD, updated broken link
- 06:1306:13, 28 April 2022 diff hist −45 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.4 Survey (.dgn) file: Per CADD, updated broken link
27 April 2022
- 14:2314:23, 27 April 2022 diff hist 0 N File:237.14.2.5 MoDOT Linear Feature Naming Convention.pdf No edit summary current
- 14:2314:23, 27 April 2022 diff hist −123 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated broken links
- 10:2510:25, 27 April 2022 diff hist 0 N File:237.14.3.6 Export a Completed Project for Construction.pdf No edit summary current
- 10:2510:25, 27 April 2022 diff hist 0 N File:237.14.3.1 Electronic Design Data Checklist.xlsx No edit summary current
- 10:2410:24, 27 April 2022 diff hist 0 N File:237.14.2.11 04 Make PDF Process for Contract Plans.pdf No edit summary current
- 10:1310:13, 27 April 2022 diff hist 0 N File:237.14.2.6 Civil Geometry Report.xlsx No edit summary current
- 10:1210:12, 27 April 2022 diff hist 0 N File:237.14.2.3 Survey Coordinate File Example.pdf No edit summary current
- 10:1110:11, 27 April 2022 diff hist 0 N File:237.14.2.2 Survey Report Example.pdf No edit summary current
- 10:1110:11, 27 April 2022 diff hist 0 N File:237.14.2.2 Survey Report.pdf No edit summary current
- 10:1010:10, 27 April 2022 diff hist 0 N File:237.14.2.1 Project Data Summary Report.xlsx No edit summary current
- 10:1010:10, 27 April 2022 diff hist −421 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, updated numerous broken links
26 April 2022
- 13:5513:55, 26 April 2022 diff hist −4,540 m 616.18 Construction Inspection Guidelines for Sec 616 Per CM, moved safety and sanitary guidance from EPG 616.18 to EPG 107.4. Updated EPG 616.18's Signing for Cold Milled Surfaces guidance by removing archaic verbiage about what the Changeable Message Signs are to display