User contributions for Smithk
Jump to navigation
Jump to search
26 April 2022
- 13:3413:34, 26 April 2022 diff hist +916 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions: Per CM, moved safety and sanitary guidance from EPG 616.18 to EPG 107.4
- 12:3912:39, 26 April 2022 diff hist −11 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated verbiage to come in line with USDOL verbiage
- 08:1708:17, 26 April 2022 diff hist +137 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG Checking For Unauthorized Sample Records
25 April 2022
- 11:2711:27, 25 April 2022 diff hist +33 m 102.2 Contractor Performance Rating System →102.2.5 Contractor Recognition: Per CM, clarified the conditions for contractors to receive an award based on their contractor performance rating
22 April 2022
- 14:1314:13, 22 April 2022 diff hist 0 N File:236.16.2 April 2022 map.jpg No edit summary current
- 14:1314:13, 22 April 2022 diff hist +6 m 236.16 Outdoor Advertising Per ODA, further updated contact info and map
- 13:5113:51, 22 April 2022 diff hist +40 m 642.8 Sidewalk Design Criteria Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 13:4813:48, 22 April 2022 diff hist +40 m Category:150 Quality Management Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 13:3713:37, 22 April 2022 diff hist +40 m LPA:136.12 Figures, Glossary and Other Useful Links Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 13:3613:36, 22 April 2022 diff hist +80 m LPA:136.11 Local Public Agency Construction Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 13:3413:34, 22 April 2022 diff hist +80 m LPA:136.9 Plans, Specs and Estimates (PSE) Per CM, provided a very clear identification of the revision date for the ADA Checklist
- 13:3013:30, 22 April 2022 diff hist +40 m Category:101 Standard Forms →Construction and Materials: Per CM, provided a very clear identification of the revision date for the ADA Checklist
21 April 2022
- 14:1314:13, 21 April 2022 diff hist −126 m Recent Policy Changes in the EPG EPG 712.1.4
- 13:4313:43, 21 April 2022 diff hist −374 m Category:712 Structural Steel Construction →712.1.4 Welding: Per BR, removed archaic references to field welder cards. Added language for stud welding to match Sec 712.6.3.
20 April 2022
- 13:1713:17, 20 April 2022 diff hist −435 m Recent Policy Changes in the EPG No edit summary
- 13:0113:01, 20 April 2022 diff hist +538 m Recent Policy Changes in the EPG EPG 137
- 12:5412:54, 20 April 2022 diff hist +32 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, revision briefly updates information about how CM Division stores electronic contract document.
- 12:0712:07, 20 April 2022 diff hist −30 m 127.29 Stormwater →127.29.4.3 MCM 3: Illicit Discharge Detection and Elimination (IDDE) Program: Per Env'l, updated broken link
- 09:5909:59, 20 April 2022 diff hist −314 m Recent Policy Changes in the EPG EPG 903.3.4.3
- 09:4709:47, 20 April 2022 diff hist +895 m Recent Policy Changes in the EPG EPG 802, EPG 805, EPG 806.1, EPG 806.8
- 09:3009:30, 20 April 2022 diff hist +36 m Category:805 Seeding →805.2.3 Construction Requirements (Sec 805.3): added link
- 08:1108:11, 20 April 2022 diff hist +1,205 m Recent Policy Changes in the EPG EPG 612, 616.6, 616.18, 616.19, 616.23, 617.1, 617.2, 1063, 1064
- 07:3707:37, 20 April 2022 diff hist +60 m Recent Policy Changes in the EPG EPG 403.1.19
- 07:3607:36, 20 April 2022 diff hist +21 m Category:403 Asphaltic Concrete Pavement No edit summary
19 April 2022
- 12:4312:43, 19 April 2022 diff hist −662 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.6.3 Erosion Control Measures: Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 12:3912:39, 19 April 2022 diff hist 0 m 806.2 Sediment Control Measures updated link
- 12:3812:38, 19 April 2022 diff hist −2 m 806.1 Erosion Control Measures updated link
- 12:3612:36, 19 April 2022 diff hist −6 m 750.6 Erosion Control and Energy Dissipation updated links
- 12:2712:27, 19 April 2022 diff hist −166 806.1 Erosion Control Measures Per Env'l, guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment, allowing for quicker project finalization. MoDOT is obligated to stabilize disturbed areas with permanent building materials or perennial vegetative cover to minimize erosion and sedimentation of disturbed areas.
- 11:4911:49, 19 April 2022 diff hist +2 m Category:805 Seeding No edit summary
- 11:4311:43, 19 April 2022 diff hist +9,214 Category:805 Seeding Guidance for seeding, mulching, and temporary seeding reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. New guidance for cool season and warm season grasses is available. A new seed species picture guide is available in EPG 805.2.4 Acceptance to assist with general inspection and acceptance of vegetative covers.
- 11:2711:27, 19 April 2022 diff hist +1,642 Category:802 Mulching Per Env'l, guidance for mulching reflects the new standard seed mixes, fertilizer, and lime rates (as shown in the new Standard Plan 805.00 Seeding) will promote a more effective vegetative establishment. Mulching will not be required for final seeded areas where temporary seeding is planned for temporary stabilization of areas to receive warm season grasses. current
- 10:2210:22, 19 April 2022 diff hist +424 Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per CM, the maximum number of contractor QC sublots that can be used for one lot of superpave asphalt pavement is 28. Regardless of lot size, QA testing will always be at a frequency of one per four sublots.
- 10:0910:09, 19 April 2022 diff hist −306 903.3 Ground-Mounted Sign Supports Per TS, in EPG 903.3.4.3 Perforated Square Steel Tube Posts (PSST), guidance for PSST anchor installations has been updated and clarified.
- 09:3709:37, 19 April 2022 diff hist −38 Category:1064 Temporary Concrete Traffic Barrier Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 09:3609:36, 19 April 2022 diff hist +13 Category:1063 Temporary Traffic Control Devices Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. current
- 09:3409:34, 19 April 2022 diff hist −1,503 617.2 Construction Inspection Guidelines for Sec 617 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant. The use of two-loop temporary Type F concrete traffic barrier shall not be allowed after January 1, 2023.
- 09:2909:29, 19 April 2022 diff hist +36 617.1 Temporary Traffic Barriers Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:1709:17, 19 April 2022 diff hist −217 616.23 Traffic Control for Field Operations →616.23.2.5 Temporary Traffic Control Devices: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:1509:15, 19 April 2022 diff hist −2 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.15 Traffic Management
- 09:1209:12, 19 April 2022 diff hist −208 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.7 Changeable Message Sign/Flashing Arrow Panels/Traffic Signals: Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:0909:09, 19 April 2022 diff hist −125 616.18 Construction Inspection Guidelines for Sec 616 Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 09:0409:04, 19 April 2022 diff hist −632 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
- 08:5608:56, 19 April 2022 diff hist −3 Category:612 Impact Attenuators Per DE and TS, guidance now reflects that the use of non-MASH 2016 temporary traffic control devices barriers is being discontinued. All temporary traffic control devices on a project must be NCHRP 350 or MASH 2016 Test Level 3 compliant.
18 April 2022
- 13:3113:31, 18 April 2022 diff hist +167 m Recent Policy Changes in the EPG EPG 236.7
- 13:2613:26, 18 April 2022 diff hist +1,138 m 236.7 Negotiation Per RW, additional guidance for greater clarity about what is needed from property owners to close on the properties either with MoDOT or a title company.
- 07:0107:01, 18 April 2022 diff hist 0 N File:236.16.2 2022 map.jpg No edit summary current
- 07:0007:00, 18 April 2022 diff hist −16 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel: Per ODA, updated contact info and map
14 April 2022
- 13:4213:42, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review →236.6.3.3 Waiver Valuation: Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.
- 13:3813:38, 14 April 2022 diff hist 0 m 236.6 Appraisal and Appraisal Review Per RW, increased the maximum threshold for waiver valuation reports from $10,000 to $25,000, per FHWA consent.