User contributions for Smithk
Jump to navigation
Jump to search
14 July 2021
- 11:2011:20, 14 July 2021 diff hist +73 m Category:1180 Bituminous Stockpile Patching Material No edit summary
- 10:3010:30, 14 July 2021 diff hist +1,280 m Main Page Per EPS and CCO, added disclaimer verbiage
13 July 2021
- 09:2509:25, 13 July 2021 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.3.24, TEAP Program Application
- 09:2209:22, 13 July 2021 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 09:2109:21, 13 July 2021 diff hist 0 N File:Fig.136.3.24 2021.docx No edit summary current
- 09:2109:21, 13 July 2021 diff hist 0 m LPA:136.3 Federal Aid Basics Per DE, updated TEAP application by increasing federal fund limit to $12K per project and adding clarification about person in responsible charge.
- 08:1608:16, 13 July 2021 diff hist −4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, minor clarification related to CUF Determination Form
7 July 2021
- 12:5212:52, 7 July 2021 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) updated links for RW Plans checklist
- 12:5012:50, 7 July 2021 diff hist 0 N File:124.2.4 Check List for RW Plans.docx No edit summary current
- 12:5012:50, 7 July 2021 diff hist −34 m Category:101 Standard Forms →Checklist: updated link to Right of Way Check List
- 12:4712:47, 7 July 2021 diff hist +4 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting: updated link to Project Reviewing Checklist
- 12:4612:46, 7 July 2021 diff hist −86 m Category:124 Quality Control / Quality Assurance (QC/QA) updated link to Project Reviewing Checklist
- 12:4512:45, 7 July 2021 diff hist 0 N File:124.2.4 Project Reviewing Checklist.docx No edit summary
- 12:4512:45, 7 July 2021 diff hist −43 m Category:101 Standard Forms →Checklist: updated link to Project Reviewing Checklist
- 12:4112:41, 7 July 2021 diff hist +11 m Category:124 Quality Control / Quality Assurance (QC/QA) No edit summary
- 12:3912:39, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link to Design Progress Checklist
- 12:3912:39, 7 July 2021 diff hist 0 N File:124.2.4 Design Progress Check list.docx No edit summary current
- 12:3812:38, 7 July 2021 diff hist −45 m Category:101 Standard Forms →Checklist: updated link to Design Progress Check List
- 12:3612:36, 7 July 2021 diff hist −1 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process
- 12:3512:35, 7 July 2021 diff hist +6 m Category:124 Quality Control / Quality Assurance (QC/QA) →124.2.4 Quality Control Process: updated link for Preliminary Plan Review Checklist
- 12:3412:34, 7 July 2021 diff hist 0 N File:124.2.4 Check List for Preliminary Plans.docx No edit summary current
- 12:3112:31, 7 July 2021 diff hist −40 m Category:101 Standard Forms →Checklist: updated link
- 12:2312:23, 7 July 2021 diff hist −49 m 643.2 Local Utility Adjustments - Public and Private updated D-12 link
- 12:1312:13, 7 July 2021 diff hist −99 m 237.9 Submission of Plans and Supporting Documents updated D-12 links
- 12:0912:09, 7 July 2021 diff hist −94 m Category:124 Quality Control / Quality Assurance (QC/QA) updated D-12 link
- 12:0412:04, 7 July 2021 diff hist 0 N File:D-12 2021.pdf No edit summary
- 12:0412:04, 7 July 2021 diff hist −49 m Category:101 Standard Forms →Checklist: updated D-12 link
2 July 2021
- 13:1413:14, 2 July 2021 diff hist +40 m Category:109 Measurement and Payment →109.12.3.1 Excusable Delays for Unusual Events: inclusive language
- 12:3912:39, 2 July 2021 diff hist −4 m 236.13 Designing Right of Way Plans inclusive language
- 12:3612:36, 2 July 2021 diff hist +11 m 236.13 Designing Right of Way Plans inclusive language
- 12:2312:23, 2 July 2021 diff hist −5 m 236.13 Designing Right of Way Plans No edit summary
- 12:0312:03, 2 July 2021 diff hist +1 m 238.4 Construction Surveying Inclusive language
- 11:3911:39, 2 July 2021 diff hist +18 m 236.3 Administration inclusive laguage
1 July 2021
- 12:0612:06, 1 July 2021 diff hist +130 m Recent Policy Changes in the EPG EPG 1040.4
- 11:5911:59, 1 July 2021 diff hist +94 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →1040.4 Crashworthy End Terminal and Qualified Plastic Guardrail Block
30 June 2021
- 13:5313:53, 30 June 2021 diff hist +233 m Recent Policy Changes in the EPG EPG 751.6 and EPG 751.50
- 12:1912:19, 30 June 2021 diff hist +849 m 751.6 General Quantities Per BR, clarified guidance about System I finish field coat
- 10:1610:16, 30 June 2021 diff hist +650 m 751.50 Standard Detailing Notes →A4a. Structural Steel Protective Coatings: Per BR, provided additional options for System I structural steel protective coatings.
- 06:5606:56, 30 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 30 2021.xlsx No edit summary
- 06:5506:55, 30 June 2021 diff hist 0 N File:751.1.2.18.2 Highway Grade Separation.docx No edit summary current
- 06:5506:55, 30 June 2021 diff hist +7 m 751.1 Preliminary Design Per BR, updated links to "Highway Grade Separation (Minor Route over Major Route)" and "Request for Final Soundings for Structures Form"
- 06:2406:24, 30 June 2021 diff hist +15 m 748.7 Bridge Deck and Bridge End Drainage →748.7.4 Bridges on a Minor or Low Volume Route: Per BR, minor clarification
29 June 2021
- 13:3613:36, 29 June 2021 diff hist 0 N File:751.1.2.19 Guidance Jun 2021.xlsx No edit summary
- 13:3513:35, 29 June 2021 diff hist 0 N File:751.1.2.19 Request Jun 2021.xlsx No edit summary
- 13:3413:34, 29 June 2021 diff hist 0 m 751.1 Preliminary Design Per BR, minor updates for "Guidance for Request for Final Soundings for Structures Form" and "Request for Final Soundings for Structures Form"
- 09:4609:46, 29 June 2021 diff hist −2 m 748.7 Bridge Deck and Bridge End Drainage →748.7.3 Bridges on a Major Route
- 09:4209:42, 29 June 2021 diff hist +14 m 751.1 Preliminary Design →751.1.2.18.2 Content
- 09:2309:23, 29 June 2021 diff hist +2 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, minor clarification
- 07:1007:10, 29 June 2021 diff hist −3 m 751.37 Drilled Shafts →Commentary on EPG 751.37.1 General
- 07:0907:09, 29 June 2021 diff hist −28 m 751.38 Spread Footings Per BR, minor clarifications current