User contributions for Smithk
Jump to navigation
Jump to search
3 June 2021
- 08:5208:52, 3 June 2021 diff hist +1 m Category:900 TRAFFIC CONTROL →900.1.13 Definitions of Headings, Words and Phrases in the EPG 900 articles (MUTCD Section 1A.13): Inclusive language
- 08:5008:50, 3 June 2021 diff hist +7 m 236.1 General Information Inclusive language current
- 08:4708:47, 3 June 2021 diff hist +4 m Category:239 Construction Inspection Guidelines for Final Plans Inclusive language
- 08:4308:43, 3 June 2021 diff hist +16 m 141.3 Local Funding Options Inclusive language
- 08:4008:40, 3 June 2021 diff hist +12 m 236.11 Mediation Inclusive language
- 08:3008:30, 3 June 2021 diff hist −1 m LPA:136.8 Local Public Agency Land Acquisition Inclusive language
- 08:2208:22, 3 June 2021 diff hist +6 m LPA:136.11 Local Public Agency Construction Inclusive language
- 08:1808:18, 3 June 2021 diff hist −5 m 236.6 Appraisal and Appraisal Review Inclusive language
- 08:1308:13, 3 June 2021 diff hist +11 m 236.7 Negotiation Inclusive language
- 08:0108:01, 3 June 2021 diff hist +14 m 236.4 Description Writing and Titles Inclusive language
- 07:5807:58, 3 June 2021 diff hist +8 m Category:105 Control of Work Inclusive language
- 07:5507:55, 3 June 2021 diff hist +12 m Category:703 Concrete Masonry Construction Inclusive language
- 07:5207:52, 3 June 2021 diff hist +31 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Inclusive language
- 07:4707:47, 3 June 2021 diff hist +2 m 236.3 Administration →236.3.8.2 Discussion
- 07:4607:46, 3 June 2021 diff hist +17 m 236.3 Administration Inclusive language
- 07:4207:42, 3 June 2021 diff hist +22 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction Inclusive language
2 June 2021
- 10:2910:29, 2 June 2021 diff hist +6 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) No edit summary
- 10:2610:26, 2 June 2021 diff hist −3 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Inclusive language
- 10:2010:20, 2 June 2021 diff hist +171 m 236.10 Right Of Way Condemnation Inclusive language.
- 08:5808:58, 2 June 2021 diff hist +17 m Category:1002 Aggregate for Asphaltic Concrete No edit summary
- 08:1808:18, 2 June 2021 diff hist +2 m 750.1 Open Channels →750.1.5.1 General Considerations
- 07:2607:26, 2 June 2021 diff hist +18 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.9.2 Flagging Operations
- 07:1707:17, 2 June 2021 diff hist 0 m Category:404 Bituminous Mixing Plants →404.1.4 Requirements for Drum Mix Plants (Sec 404.4)
- 07:1507:15, 2 June 2021 diff hist +19 m Category:808 Planting Trees, Shrubs, and Other Plants →Construction Requirements (Sec 808.3)
- 07:1307:13, 2 June 2021 diff hist +12 m Category:1002 Aggregate for Asphaltic Concrete →1002.2 Acceptance
28 May 2021
- 10:5210:52, 28 May 2021 diff hist +7 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 10:4910:49, 28 May 2021 diff hist 0 N File:236.16.2 May 2021 map.jpg No edit summary current
- 10:4910:49, 28 May 2021 diff hist +4 m 236.16 Outdoor Advertising Per OA, minor clarification for map
- 07:4607:46, 28 May 2021 diff hist −14 m 751.50 Standard Detailing Notes →H1. Steel: Per BR, updated haunch notes
27 May 2021
- 15:2815:28, 27 May 2021 diff hist +1 m Category:149 Project Delivery Determination and Initial Risk Assessment →149.5.2 Risk Assessment Process
- 08:5808:58, 27 May 2021 diff hist +39 m Category:139 Design - Build →139.10.7.2 Grammar and Punctuation
25 May 2021
- 15:1015:10, 25 May 2021 diff hist −196 m Recent Policy Changes in the EPG EPG 107.4
- 15:0215:02, 25 May 2021 diff hist −220 m Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions: Per CM, new clarification provided about hard hat safety policy.
- 13:5613:56, 25 May 2021 diff hist +291 m Recent Policy Changes in the EPG EPG 402 and EPG 409
- 13:3713:37, 25 May 2021 diff hist 0 N File:409 FY 2022 Seal Coat Plans.pdf No edit summary
- 13:3613:36, 25 May 2021 diff hist −7 m Category:409 Seal Coat Per EPS, updated contractor pdf files. Revisions involve flag assemblies for seal coat projects.
- 13:3413:34, 25 May 2021 diff hist 0 N File:402 CLC 2022 Plans.pdf No edit summary current
- 13:3413:34, 25 May 2021 diff hist −4 m Category:402 Bituminous Surface Leveling Per EPS, updated contractor pdf files. Several revisions involving safety edge, flag assemblies and rumble strip spacing for Contract Leveling Course projects
- 09:5609:56, 25 May 2021 diff hist +1,226 Category:107 Legal Relations and Responsibility to the Public →107.4 Safety and Sanitary Provisions
21 May 2021
- 08:3608:36, 21 May 2021 diff hist −19 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, corrected Fig. 136.4.3
- 08:3508:35, 21 May 2021 diff hist −34 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, corrected Fig. 134.3.2, Allowable Profit Curve as a % of Direct Salary Costs
- 08:3208:32, 21 May 2021 diff hist 0 N File:134.3.2 2021.pdf No edit summary current
- 08:3208:32, 21 May 2021 diff hist −72 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.3.2 MoDOT Allowable Profit Curve
19 May 2021
- 08:1408:14, 19 May 2021 diff hist −1 m Category:403 Asphaltic Concrete Pavement No edit summary
- 08:1108:11, 19 May 2021 diff hist 0 N File:403 Performance Testing Asphalt QRG.pdf No edit summary current
- 08:1008:10, 19 May 2021 diff hist +84 m Category:403 Asphaltic Concrete Pavement Per Mat'ls, provided Performance Testing Asphalt QRG as a reference
- 07:5707:57, 19 May 2021 diff hist +1 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
18 May 2021
- 15:2615:26, 18 May 2021 diff hist 0 m Recent Policy Changes in the EPG No edit summary
- 13:2513:25, 18 May 2021 diff hist −288 m Recent Policy Changes in the EPG EPG 153.6
- 13:1213:12, 18 May 2021 diff hist +882 m 153.6 Chief Counsel's Office Per CCO, addition of two contracts (CC11 and CC12)