User contributions for Smithk
Jump to navigation
Jump to search
2 April 2021
- 06:5506:55, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 3.jpg No edit summary current
- 06:5406:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent voided 4.jpg No edit summary current
- 06:5406:54, 2 April 2021 diff hist 0 N File:751.21.1.3 spread voided.jpg No edit summary current
- 06:5406:54, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 3.jpg No edit summary current
- 06:5306:53, 2 April 2021 diff hist 0 N File:751.21.1.3 adjacent box 4.jpg No edit summary current
- 06:5306:53, 2 April 2021 diff hist 0 N File:751.21.1.3 spread box.jpg No edit summary current
- 06:5206:52, 2 April 2021 diff hist +26,392 N 751.21 Prestressed Concrete Slab and Box Beams Per BR, new EPG 751.21 to provide guidance for beams we have been designing and using for over a decade
1 April 2021
- 10:0610:06, 1 April 2021 diff hist +345 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, revisions to apply to new guidance in EPG 751.21 Prestressed Concrete Slab and Box Beams
- 09:1909:19, 1 April 2021 diff hist +54 m 751.22 Prestressed Concrete I Girders Per BR, updated links
- 09:1609:16, 1 April 2021 diff hist +18 m 751.22 Prestressed Concrete I Girders Per Br, updated link
- 09:0409:04, 1 April 2021 diff hist +334 m 751.1 Preliminary Design Per BR, minor clarifications
31 March 2021
- 10:2210:22, 31 March 2021 diff hist 0 N File:903.2a Signpost Selection Guide 2021.xls No edit summary current
- 10:2110:21, 31 March 2021 diff hist 0 m Category:903 Highway Signing Per TS, minor clarifications and corrections for Signpost Selection Guide
- 10:2110:21, 31 March 2021 diff hist 0 m 903.3 Ground-Mounted Sign Supports Per TS, minor clarifications and corrections for Signpost Selection Guide
30 March 2021
- 08:5208:52, 30 March 2021 diff hist −122 m 127.25 Maintenance Environmental Policies Per Maintenance, deleted archaic Deer Death Report Form and Map
- 06:5306:53, 30 March 2021 diff hist +4 m 127.2 Historic Preservation and Cultural Resources No edit summary
- 06:4906:49, 30 March 2021 diff hist +474 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory links
29 March 2021
- 10:2110:21, 29 March 2021 diff hist +120 m 127.2 Historic Preservation and Cultural Resources Per Env'l, archaic link restored until further notice
- 10:1210:12, 29 March 2021 diff hist −120 m 127.2 Historic Preservation and Cultural Resources No edit summary
- 10:0910:09, 29 March 2021 diff hist 0 m 127.2 Historic Preservation and Cultural Resources Per Env'l, updated Mo Historic Bridge Inventory link
26 March 2021
- 12:4612:46, 26 March 2021 diff hist −791 m Recent Policy Changes in the EPG EPG 501.1.3.5
- 12:3312:33, 26 March 2021 diff hist +2,044 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: Per CM, clarification of curing and testing procedures for cores and cylinders in projects with paving and structures.
25 March 2021
- 07:1407:14, 25 March 2021 diff hist −89 m Recent Policy Changes in the EPG EPG 751.50
- 07:1007:10, 25 March 2021 diff hist +356 m 751.50 Standard Detailing Notes →H5a. Finger Plate: Per BR, updated note to clarify procedure for making holes for connection.
24 March 2021
- 13:5013:50, 24 March 2021 diff hist +201 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, clarifed guidance. The MoDOT Contractor report is no longer useful in checking contractor insurance and it is causing some confusion.
- 12:1712:17, 24 March 2021 diff hist 0 N File:129.3 temporary.docx No edit summary current
- 12:1712:17, 24 March 2021 diff hist −9 m Recent Policy Changes in the EPG EPG 129
- 12:1112:11, 24 March 2021 diff hist −20 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 12:1012:10, 24 March 2021 diff hist −75 m Category:129 Public Involvement →129.6.4 Presentation for Location and Design Approval to the Commission and Commission Actions Needed
- 12:0912:09, 24 March 2021 diff hist +1,485 m Category:129 Public Involvement Per Env'l, FHWA will temporarily allow all public involvement activities previously conducted in person to exclusively use virtual techniques.
- 07:2907:29, 24 March 2021 diff hist −603 m Recent Policy Changes in the EPG EPG 236.15
- 07:2507:25, 24 March 2021 diff hist +241 m 236.16 Outdoor Advertising →236.16.15 Vegetation Removal: Per ODA, updated Vegetation Process in EPG. The current practice has been in place for several years. Unfortunately, it was overlooked on ODA’s part in the EPG.
23 March 2021
- 09:5309:53, 23 March 2021 diff hist −26 m Recent Policy Changes in the EPG EPG 108.1.1
- 09:4509:45, 23 March 2021 diff hist +2,690 m Category:108 Prosecution and Progress →108.1.1 Review and Approval of a Subcontract Request: Per CM, new guidance about when subletting requirements can be adjusted
19 March 2021
- 14:1314:13, 19 March 2021 diff hist +4 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.9.1 Slope and Rise of Sidewalk Ramps: Per DE, correction: minimum curb height for sidewalk ramp edge protection is 4 inches, not 2 inches.
- 13:5613:56, 19 March 2021 diff hist −320 m Recent Policy Changes in the EPG EPG 109.12.3.2
- 13:5013:50, 19 March 2021 diff hist +2,569 m Category:109 Measurement and Payment →109.12.3 Time Adjustment Change Orders: Per CM, new useful guidance for addressing time adjustment change orders as well as the supporting documentation
- 11:1311:13, 19 March 2021 diff hist −134 m Category:108 Prosecution and Progress →108.7 Contract Time for Completion of the Work: Per CM, deleted sentence that is contrary to specifications
18 March 2021
- 06:1206:12, 18 March 2021 diff hist 0 File:235.2.3 Exhibit A.pdf Smithk reverted File:235.2.3 Exhibit A.pdf to an old version current
- 06:1006:10, 18 March 2021 diff hist −24 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): updated link
17 March 2021
- 11:2511:25, 17 March 2021 diff hist −44 m Recent Policy Changes in the EPG EPG 903.15.1
- 11:2211:22, 17 March 2021 diff hist +1,550 m 903.14 Memorial Signs →903.14.1 Memorial Designation Programs: Per TS, new Memorial Designation Programs guidance for statewide uniformity.
- 07:5507:55, 17 March 2021 diff hist +2 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 07:4807:48, 17 March 2021 diff hist +4 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
15 March 2021
- 13:4113:41, 15 March 2021 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2021.xlsx No edit summary
- 13:4013:40, 15 March 2021 diff hist +10 m 606.1 Guardrail Per Charles Schumann, updated Guardrail Length of Need Calculator to allow selection of a barrier w/ an extended curb so the add'l 12.5’ of guardrail is included if there is not sufficient LON to cover it. Also informational notes and warnings were updated and added
- 12:3612:36, 15 March 2021 diff hist +171 m Recent Policy Changes in the EPG EPG 751.2 and EPG 751.31
- 12:0212:02, 15 March 2021 diff hist +935 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.
- 10:1510:15, 15 March 2021 diff hist +262 m 751.1 Preliminary Design →751.1.2.6.1 Grade Separations: Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.
- 07:3307:33, 15 March 2021 diff hist +1,568 m 751.31 Open Concrete Intermediate Bents Per BR, updated pier protectin guidance to reflect latest AASHTO collision requirements with MoDOT policy exceptions.