User contributions for Smithk
Jump to navigation
Jump to search
23 September 2020
- 12:0112:01, 23 September 2020 diff hist +30 m Recent Policy Changes in the EPG EPG 751.50
- 11:5411:54, 23 September 2020 diff hist +396 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, added note H7.8.2 to require epoxy-mastic primer coating on galvanized drain support brackets which come in contact with weathering steel beams/girders.
- 09:3009:30, 23 September 2020 diff hist +41 m 903.5 Regulatory Signs No edit summary
- 09:2609:26, 23 September 2020 diff hist 0 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 09:2309:23, 23 September 2020 diff hist 0 m 903.5 Regulatory Signs →903.5.14 Optional Lane Control Sign (R3-6) (MUTCD Section 2B.21)
- 09:2309:23, 23 September 2020 diff hist +1 m 903.5 Regulatory Signs →903.5.13 Mandatory Movement Lane Control Signs (R3-5, R3-5a and R3-7)(MUTCD Section 2B.20)
- 09:2009:20, 23 September 2020 diff hist +9 m 903.5 Regulatory Signs →903.5.5.2 YIELD Sign Placement (MUTCD Section 2B.10)
- 09:1909:19, 23 September 2020 diff hist −2 m 903.5 Regulatory Signs →903.5.1 Application (MUTCD Section 2B.01)
- 09:1509:15, 23 September 2020 diff hist −995 m 903.5 Regulatory Signs Per TS, numerous minor updates and clarifications
22 September 2020
- 14:2814:28, 22 September 2020 diff hist −4 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3)
- 14:2714:27, 22 September 2020 diff hist −5 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): updated link
- 09:1709:17, 22 September 2020 diff hist −281 m 751.10 General Superstructure →751.10.1.13 Drip Groove: Per BR, further minor clarifications related to barrier pay items
- 07:3607:36, 22 September 2020 diff hist −114 m Recent Policy Changes in the EPG EPG 237.5
- 07:3407:34, 22 September 2020 diff hist −296 m 237.5 Special Provisions Per DE, clarified and updated guidance to current practice
21 September 2020
- 12:1312:13, 21 September 2020 diff hist −61,642 m Category:944 Radio Operation Per SM, info greatly truncated and moved to EPG 948 current Tag: Replaced
- 11:4811:48, 21 September 2020 diff hist +2,314 m Category:948 Incident Response Plan and Emergency Response Management Per SM, deleted archaic E 944 Radio Operation and merged its info into EPG 948. Other minor updates to E 948
- 07:4107:41, 21 September 2020 diff hist +22 m Category:139 Design - Build →139.10.6 Acceptance of SOQs and Proposals: Updated links
- 07:3707:37, 21 September 2020 diff hist −9 m Category:139 Design - Build No edit summary
- 07:3107:31, 21 September 2020 diff hist +12 m Category:139 Design - Build →139.8.2 Request for Proposals: minor corrections
17 September 2020
- 12:1412:14, 17 September 2020 diff hist −348 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:1312:13, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:1212:12, 17 September 2020 diff hist 0 N File:903.18.4.jpg No edit summary current
- 12:1212:12, 17 September 2020 diff hist 0 N File:903.18.2.jpg No edit summary current
- 12:1112:11, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:0312:03, 17 September 2020 diff hist 0 N File:903.18.4.pdf No edit summary current
- 12:0312:03, 17 September 2020 diff hist 0 N File:903.18.2.pdf No edit summary current
- 12:0212:02, 17 September 2020 diff hist +538 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65): Per TS, clarification
- 11:5011:50, 17 September 2020 diff hist −272 m 903.17 Delineation and Object Markers Per TS, several minor clarifications
- 11:4311:43, 17 September 2020 diff hist +51 N 903.18 Other Signing Items Smithk moved page 903.18 Other Signing Items to 903.18 Delineation and Object Markers: Renamed, per TS current Tag: New redirect
- 11:4311:43, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers Smithk moved page 903.18 Other Signing Items to 903.18 Delineation and Object Markers: Renamed, per TS
- 08:4308:43, 17 September 2020 diff hist +4 m 236.6 Appraisal and Appraisal Review No edit summary
- 08:2808:28, 17 September 2020 diff hist −1 m 236.6 Appraisal and Appraisal Review No edit summary
- 08:1708:17, 17 September 2020 diff hist +1 m 236.6 Appraisal and Appraisal Review Per RW, updated link
16 September 2020
- 14:1814:18, 16 September 2020 diff hist −140 m Recent Policy Changes in the EPG EPG 127.27
- 14:1514:15, 16 September 2020 diff hist +1,265 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities Per Env'l, updated process changes that FHWA has approved. Revision updates guidance to practice that has been established for a year. current
- 13:3213:32, 16 September 2020 diff hist −12 m Recent Policy Changes in the EPG EPG 751.36.5.8
- 12:2112:21, 16 September 2020 diff hist +2 m 751.36 Driven Piles →751.36.5.8 Additional Provisions for Pile Cap Footings
- 11:5511:55, 16 September 2020 diff hist +1,102 m 751.36 Driven Piles →751.36.5.8 Additional Provisions for Pile Cap Footings: Per BR, updated to clarify pile uplift design requirements for pile cap footing and implement DSB-16-02 requirements.
- 09:5009:50, 16 September 2020 diff hist +137 m Recent Policy Changes in the EPG EPG 203.2.3.1.2
- 09:4709:47, 16 September 2020 diff hist −1,547 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.2.3.1.2 Borrow or Excess Material: Per CM and DE, replaced outdated guidance for contractor-furnished borrow.
15 September 2020
- 09:0509:05, 15 September 2020 diff hist −71 m Category:614 Drainage Fittings (Grate Inlets) updated links current
14 September 2020
- 13:2413:24, 14 September 2020 diff hist +101 m Category:724 Pipe Culverts →724.1 Pipe Selection and Sizing: Per CM, minor clarification
11 September 2020
- 13:5913:59, 11 September 2020 diff hist 0 N File:101 Land Disturbance Storm Water Database Closeout Procedure QRG 2020.pdf No edit summary current
- 13:5913:59, 11 September 2020 diff hist 0 m Category:101 Standard Forms →Storm Water Database Quick Reference Guides (QRGs): Per Env'l, updated Stormwater Database Closeout Procedure QRG to remove references to SiteManager adjustments that are no longer done.
- 09:5409:54, 11 September 2020 diff hist −86 m Recent Policy Changes in the EPG EPG 127.2
- 09:3009:30, 11 September 2020 diff hist 0 m 127.2 Historic Preservation and Cultural Resources No edit summary
- 09:2909:29, 11 September 2020 diff hist +21,256 m 127.2 Historic Preservation and Cultural Resources Per Env'l, FHWA requested guiance be updated to reflect changes in the Section 106 processes that have incrementally changed over the last few years
10 September 2020
- 09:4509:45, 10 September 2020 diff hist −40 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 09:2209:22, 10 September 2020 diff hist −56 m 903.4 Overhead Sign Mounting Per TS, numerous minor clarifications
- 06:4306:43, 10 September 2020 diff hist 0 N File:R10-14b.jpg No edit summary current