User contributions for Smithk
Jump to navigation
Jump to search
28 May 2019
- 09:3709:37, 28 May 2019 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations: Per TS, the spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness in Fig. 616.6.87.1 and Fig. 616.6.87.2.
- 09:3409:34, 28 May 2019 diff hist 0 File:Fig 616.6.87.1 2017.pdf Smithk uploaded a new version of File:Fig 616.6.87.1 2017.pdf current
- 09:1109:11, 28 May 2019 diff hist +55 N 130.4 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 09:1109:11, 28 May 2019 diff hist 0 m 130.7 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 09:1009:10, 28 May 2019 diff hist +45 N 130.3 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 09:1009:10, 28 May 2019 diff hist 0 m 130.6 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 09:1009:10, 28 May 2019 diff hist 0 m Category:130 Value Engineering →130.3.2 PAVE Study Process
- 09:0809:08, 28 May 2019 diff hist +563 Category:130 Value Engineering Per EPS, new guidance for Post-Award Value Engineering (PAVE) workshops, processes and project selections and reorganization of guidance.
21 May 2019
- 14:1414:14, 21 May 2019 diff hist +1 m 237.6 Project Estimates No edit summary
- 12:5512:55, 21 May 2019 diff hist +24 m Category:702 Load-Bearing Piles minor clarification
- 12:5312:53, 21 May 2019 diff hist +297 m 751.36 Driven Piles minor clarifications
- 12:2612:26, 21 May 2019 diff hist +1 m 751.36 Driven Piles →751.36.1.2 Probe Pile
- 11:3611:36, 21 May 2019 diff hist −79 m Main Page EPG 237.6
- 11:2511:25, 21 May 2019 diff hist 0 N File:Fig 237.6.docx No edit summary current
- 11:2511:25, 21 May 2019 diff hist −13 m 237.6 Project Estimates Per Bidding, updated "Costs for Non-Contractual Items" and added an invisible (white font) link for "noncontractual" so misspellers can locate non-contractual info.
- 08:4408:44, 21 May 2019 diff hist +1 m Main Page No edit summary
- 08:2308:23, 21 May 2019 diff hist −31 m MediaWiki:Sidebar No edit summary
- 08:2208:22, 21 May 2019 diff hist +22 m MediaWiki:Sidebar No edit summary
- 08:2108:21, 21 May 2019 diff hist +12 m MediaWiki:Sidebar No edit summary
- 08:1808:18, 21 May 2019 diff hist +5 m Main Page No edit summary
- 08:1208:12, 21 May 2019 diff hist +275 m Main Page Per EPS, updated "welcome" and added mission banner
20 May 2019
- 08:2508:25, 20 May 2019 diff hist +5 m LPA:136.13 LPA Policy Changes No edit summary
- 08:2408:24, 20 May 2019 diff hist +752 m LPA:136.13 LPA Policy Changes EPG 136.6.4.5
- 08:2208:22, 20 May 2019 diff hist +186 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per Env'l, updated Fig. 136.6.18 Threatened and Endangered Species Federal Aid Transportation Submittal Checklist, and added Fig. 136.19 August 2018 MoDOT USFWS Threatened and Endangered Species Habitats
- 07:5807:58, 20 May 2019 diff hist +85 m 751.36 Driven Piles →751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8
- 07:5407:54, 20 May 2019 diff hist +74 m 751.36 Driven Piles →751.36.5.2 Structural Resistance Factor (ϕc and ϕf) for Strength Limit State, LRFD 6.5.4.2
- 07:5107:51, 20 May 2019 diff hist +76 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn), LRFD Table 10.5.5.2.3-1
- 07:4607:46, 20 May 2019 diff hist −16 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor ( \phi_{stat}) and Driving Resistance Factor ( \phi_{dyn}), LRFD Table 10.5.5.2.3-1
- 07:4507:45, 20 May 2019 diff hist −84 m 751.36 Driven Piles →751.36.5.2 Structural Resistance Factor (\phi_c and \phi_f) for Strength Limit State, LRFD 6.5.4.2
- 07:1007:10, 20 May 2019 diff hist 0 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.3 Migratory Birds
- 07:0507:05, 20 May 2019 diff hist 0 File:136.6.4.5.2.1.jpg Smithk uploaded a new version of File:136.6.4.5.2.1.jpg current
- 06:5906:59, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.1.jpg No edit summary current
- 06:5806:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.2.jpg No edit summary current
- 06:5806:58, 20 May 2019 diff hist 0 N File:136.6.4.5.3.jpg No edit summary current
- 06:5706:57, 20 May 2019 diff hist +5 LPA:136.6 Environmental and Cultural Requirements →136.6.4.5.2.1 Sponsor Responsibilities
- 06:5506:55, 20 May 2019 diff hist 0 N File:136.6.4.5.2.1.jpg No edit summary
- 06:5306:53, 20 May 2019 diff hist 0 File:Fig. 136.6.18.pdf Smithk uploaded a new version of File:Fig. 136.6.18.pdf current
- 06:4906:49, 20 May 2019 diff hist 0 N File:Fig. 136.6.19.pdf No edit summary current
- 06:3406:34, 20 May 2019 diff hist 0 N File:Fig. 136.6.18.pdf No edit summary
- 06:2906:29, 20 May 2019 diff hist +6,782 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, clarified T&E process and added new (but currently used) guidance about migratory birds
17 May 2019
- 11:2811:28, 17 May 2019 diff hist −1 m LPA:136.6 Environmental and Cultural Requirements No edit summary
- 11:0911:09, 17 May 2019 diff hist +166 m Main Page EPG 702, EPG 751.1.2, EPG 751.36
- 10:2510:25, 17 May 2019 diff hist +348 m 751.3 Structural Steel Design Properties Per BR, clarified pile design procedure.
- 10:1710:17, 17 May 2019 diff hist −183 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings): Per BR, clarified pile design procedure.
- 10:1210:12, 17 May 2019 diff hist −207 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified pile design procedure.
- 10:0810:08, 17 May 2019 diff hist +200 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, clarified pile design procedure.
- 09:4709:47, 17 May 2019 diff hist 0 N File:751.36.4.1.jpg No edit summary current
- 09:4509:45, 17 May 2019 diff hist +24,952 m 751.36 Driven Piles Per BR, clarified pile design procedure.
- 09:4209:42, 17 May 2019 diff hist +73 m 751.9 Bridge Seismic Design updated link
- 09:1309:13, 17 May 2019 diff hist +10 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, clarified pile design procedure.