User contributions for Smithk
Jump to navigation
Jump to search
15 March 2019
- 07:1307:13, 15 March 2019 diff hist +258 m Category:152 Contactor Bonding Responsibilities Per CM, added PowerPoint tutorial for contract bonds
14 March 2019
- 10:0110:01, 14 March 2019 diff hist −360 m Main Page EPG 910.3
- 09:5709:57, 14 March 2019 diff hist −11,611 m 910.3 Dynamic Message Signs (DMS) Per TS, updated guidance. References new types of DMSs.
13 March 2019
- 06:4806:48, 13 March 2019 diff hist −265 m 234.6 Diverging Diamond Interchanges →234.6.6 Public Involvement: removed archaic video
- 06:4506:45, 13 March 2019 diff hist +1 m 234.6 Diverging Diamond Interchanges →234.6.2.1.1 Modeling/Simulation
- 06:1606:16, 13 March 2019 diff hist −10 m 234.6 Diverging Diamond Interchanges No edit summary
12 March 2019
- 14:2014:20, 12 March 2019 diff hist +34 m Main Page No edit summary
- 12:1612:16, 12 March 2019 diff hist −7 m Main Page EPG 750.7
- 12:1312:13, 12 March 2019 diff hist +15 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 12:1112:11, 12 March 2019 diff hist +4 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 12:1112:11, 12 March 2019 diff hist +157 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements: Per Env'l, added minor note stating the COE must validate whether a stream is "ephemeral"
11 March 2019
- 09:0009:00, 11 March 2019 diff hist 0 File:751.22.3.10.7.jpg Smithk uploaded a new version of File:751.22.3.10.7.jpg current
- 07:4907:49, 11 March 2019 diff hist 0 N File:121.5.1.1.1 current.pdf No edit summary
- 07:4807:48, 11 March 2019 diff hist +306 m 121.5 Asset Management Per TP, uploaded the document, "Current Asset Management Plan Summary"
8 March 2019
- 14:4214:42, 8 March 2019 diff hist −3 m LPA:136.3 Federal Aid Basics →136.3.8.11.2 Purpose
- 13:0713:07, 8 March 2019 diff hist 0 File:Job Order Contracts Oct 2012.docx Smithk uploaded a new version of File:Job Order Contracts Oct 2012.docx current
- 13:0613:06, 8 March 2019 diff hist 0 File:Job Order Contracts July 2012.docx Smithk uploaded a new version of File:Job Order Contracts July 2012.docx current
- 13:0513:05, 8 March 2019 diff hist 0 File:Job Order Contracts Aug 2012.docx Smithk uploaded a new version of File:Job Order Contracts Aug 2012.docx current
- 13:0413:04, 8 March 2019 diff hist 0 File:Job Order Contracts.docx Smithk uploaded a new version of File:Job Order Contracts.docx current
- 13:0313:03, 8 March 2019 diff hist 0 File:How to Use Cognos Reports.docx Smithk uploaded a new version of File:How to Use Cognos Reports.docx current
- 10:4210:42, 8 March 2019 diff hist +47 m 646.3 Private Underpasses updated link current
7 March 2019
- 11:1611:16, 7 March 2019 diff hist −300 m Category:1015 Bituminous Material updated numerous approved products links
- 10:1710:17, 7 March 2019 diff hist +72 m 236.6 Appraisal and Appraisal Review →236.6.1.4 Employment of Retirees: updated link
- 10:1510:15, 7 March 2019 diff hist +70 m 236.6 Appraisal and Appraisal Review →236.6.1.3 Moonlighting: updated link
- 09:5209:52, 7 March 2019 diff hist +2 m Category:600 INCIDENTAL CONSTRUCTION No edit summary current
- 09:0309:03, 7 March 2019 diff hist +192 m Category:601 Field Laboratories →Equipment Verification Samples (Sec 601.2.2.1): Per CM, added a clarifying sentence with a link to the QRG for Equipment Verification Samples
6 March 2019
- 13:4413:44, 6 March 2019 diff hist +133 m Main Page EPG 236.7.2.3
- 13:3713:37, 6 March 2019 diff hist +230 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, clarified guidance to allow minimum offer to be reduced if approved by Asst. to State Design Engineer – RW
- 10:4010:40, 6 March 2019 diff hist −4 m Category:173 Erosion Control for Maintenance Operations →173.5.2 Project Name: Spring Creek Bridge Repair
- 09:0309:03, 6 March 2019 diff hist −3 m Category:1180 Bituminous Stockpile Patching Material No edit summary
- 09:0309:03, 6 March 2019 diff hist +3 m Category:1180 Bituminous Stockpile Patching Material No edit summary
5 March 2019
- 10:4810:48, 5 March 2019 diff hist +257 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches updated links to std plans
1 March 2019
- 15:1415:14, 1 March 2019 diff hist −21 m Main Page EPG 616.16.1
- 15:0915:09, 1 March 2019 diff hist −180 m 616.16 Law Enforcement Services Per TS, updated guidelines to reflect a more standardized process throughout the state.
- 13:1913:19, 1 March 2019 diff hist +47 m Main Page EPG 236.16
- 13:0113:01, 1 March 2019 diff hist −241 m 236.16 Outdoor Advertising Per RW, updated several ODA policies
- 12:0812:08, 1 March 2019 diff hist −31 m Category:109 Measurement and Payment Per CM, minor update to EPG guidance to reflect re-numbering of Sec 109.
27 February 2019
- 15:0115:01, 27 February 2019 diff hist −93 m Main Page EPG 121.5
- 14:5814:58, 27 February 2019 diff hist 0 N File:121.5.5 needs.pdf No edit summary current
- 14:5714:57, 27 February 2019 diff hist 0 N File:121.5.5.jpg No edit summary current
- 14:5714:57, 27 February 2019 diff hist 0 N File:121.5.4.pdf No edit summary current
- 14:5614:56, 27 February 2019 diff hist 0 N File:121.5.3 lifecycle.jpg No edit summary current
- 14:5614:56, 27 February 2019 diff hist 0 N File:121.5.3 satisfaction.jpg No edit summary current
- 14:5514:55, 27 February 2019 diff hist 0 N File:121.5.1.2.2.jpg No edit summary current
- 14:5514:55, 27 February 2019 diff hist 0 N File:121.5.1.2.1.jpg No edit summary current
- 14:5414:54, 27 February 2019 diff hist 0 N File:121.5.1.1.2 pavement.jpg No edit summary current
- 14:5314:53, 27 February 2019 diff hist 0 N File:121.5.1.1.2 aran.jpg No edit summary current
- 14:5314:53, 27 February 2019 diff hist 0 N File:121.5.1.1.1 low.jpg No edit summary current
- 14:5214:52, 27 February 2019 diff hist 0 N File:121.5.1.1.1 minor.jpg No edit summary current
- 14:5214:52, 27 February 2019 diff hist 0 N File:121.5.1.1.1 major.jpg No edit summary current