User contributions for EPGsysop
Jump to navigation
Jump to search
21 June 2018
- 08:4308:43, 21 June 2018 diff hist +12 m Category:101 Standard Forms →Construction and Materials: Per CM, retitled all of the On-Call spreadsheets to begin with JOC. Updated their links. Added new Microsurfacing JOC.
19 June 2018
- 12:4212:42, 19 June 2018 diff hist −6 m 606.1 Guardrail →606.1.3.5.1 Closures of Existing Streets and Roads: Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT.
- 12:4012:40, 19 June 2018 diff hist 0 N File:616.8.8a MT 2018.pdf No edit summary current
- 12:3912:39, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) No edit summary
- 12:3712:37, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT. A reference to EPG 606.1.3.5 was added to TA-8a.
15 June 2018
- 11:1411:14, 15 June 2018 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added On-Call Lighting Repair Job Order
- 09:1609:16, 15 June 2018 diff hist +22 m 236.7 Negotiation →236.7.6.3 Acquisition Procedure: updated link
- 09:1509:15, 15 June 2018 diff hist −54 m 236.4 Description Writing and Titles →236.4.4.8 Obtaining Title Insurance: Per RW, clarified EPG 236.4.4.8 Obtaining Title Insurance with guidance reflecting current title commitment business practices.
- 08:2108:21, 15 June 2018 diff hist −2 m Main Page No edit summary
14 June 2018
- 08:1308:13, 14 June 2018 diff hist +47 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added pay item
13 June 2018
- 15:1015:10, 13 June 2018 diff hist +98 m Category:751 LRFD Bridge Design Guidelines Per BR, guidance about specs for designing retaining walls to long-established current standards
- 09:1709:17, 13 June 2018 diff hist +81 m Category:751 LRFD Bridge Design Guidelines Per BR, updated link to report
11 June 2018
- 13:2213:22, 11 June 2018 diff hist +197 m Category:321 Geotechnical Engineering Per Geotech, updated some FHWA reference documents
- 09:5209:52, 11 June 2018 diff hist −62 m 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA) Per TP, updated Long-Range Plan link
- 09:4909:49, 11 June 2018 diff hist −14 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated Long-Range Plan links
7 June 2018
- 12:1312:13, 7 June 2018 diff hist 0 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.3 Quantity Sheet Procedure (Column Headings): corrected link
- 11:2711:27, 7 June 2018 diff hist +266 m 616.22 Advanced Work Zone Training Per WZQC, updated training link
- 11:2511:25, 7 June 2018 diff hist +107 m 616.21 Work Zone Technician Training Per WZQC, updated training link
6 June 2018
- 14:2714:27, 6 June 2018 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 14:2714:27, 6 June 2018 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 14:2614:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:2514:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf No edit summary current
- 14:2514:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:4707:47, 6 June 2018 diff hist 0 m Main Page No edit summary
5 June 2018
- 13:5713:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:5713:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:5613:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:5513:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf No edit summary current
- 13:5513:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:3113:31, 5 June 2018 diff hist −5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:3013:30, 5 June 2018 diff hist −10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:2813:28, 5 June 2018 diff hist −5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:2713:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf No edit summary current
- 13:2713:27, 5 June 2018 diff hist −2 m 237.9 Submission of Plans and Supporting Documents No edit summary
- 13:2613:26, 5 June 2018 diff hist −8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:4110:41, 5 June 2018 diff hist −239 m Main Page EPG 751.11.2.1
- 10:3310:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
1 June 2018
- 15:1715:17, 1 June 2018 diff hist +4 m Main Page No edit summary
- 11:2111:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:4710:47, 1 June 2018 diff hist +2 Main Page No edit summary
- 10:4610:46, 1 June 2018 diff hist −409 m Main Page EPG 751.50
- 10:4310:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
31 May 2018
- 12:2012:20, 31 May 2018 diff hist +7 m Main Page No edit summary
- 12:0612:06, 31 May 2018 diff hist −534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:4309:43, 31 May 2018 diff hist −145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
30 May 2018
- 12:1112:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:4710:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:2210:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg No edit summary current
- 10:2110:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training No edit summary current
- 10:1710:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals