User contributions for EPGsysop
Jump to navigation
Jump to search
13 November 2017
- 14:5114:51, 13 November 2017 diff hist +49 m Main Page No edit summary
- 14:2314:23, 13 November 2017 diff hist 0 N File:Main Page Nov 13, 2017.jpg No edit summary current
- 14:2314:23, 13 November 2017 diff hist +43 m Main Page No edit summary
- 13:4413:44, 13 November 2017 diff hist +306 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 13:4013:40, 13 November 2017 diff hist +1,383 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, expanded guidance since FAST Act extended eligibility for some programs. KC, SL & S'fld MPOs asked us allow eligibility to nonprofits in their areas
- 10:0510:05, 13 November 2017 diff hist −48 m Main Page No edit summary
- 09:2509:25, 13 November 2017 diff hist −2 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 09:2209:22, 13 November 2017 diff hist +221 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2
- 09:2109:21, 13 November 2017 diff hist +153 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 09:1909:19, 13 November 2017 diff hist +170 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1
- 09:1509:15, 13 November 2017 diff hist −15 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing
- 09:1309:13, 13 November 2017 diff hist −1 m 751.24 Retaining Walls →751.24.2.2 Excavation
- 08:2608:26, 13 November 2017 diff hist −5 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, minor revision to Note A1.2 of E 751.50.
- 08:1708:17, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization 2017.jpg No edit summary current
- 08:1508:15, 13 November 2017 diff hist +5 m 751.5 Structural Detailing Guidelines →751.5.1.3.3 Capitalization
- 08:1408:14, 13 November 2017 diff hist 0 N File:751.5.1.3.3 capitalization.jpg No edit summary current
- 08:1308:13, 13 November 2017 diff hist +374 m 751.5 Structural Detailing Guidelines →751.5.1.3 Grammar and Punctuation: Per BR, updated capitalization rules and made minor additions to nomenclature
- 07:0807:08, 13 November 2017 diff hist −13 m 642.10 Curb Ramp Applications No edit summary
- 07:0807:08, 13 November 2017 diff hist −13 m 642.10 Curb Ramp Applications No edit summary
9 November 2017
- 14:5414:54, 9 November 2017 diff hist +108 m 236.7 Negotiation updated link
8 November 2017
- 15:1715:17, 8 November 2017 diff hist 0 N File:Main Page Nov 8, 2017.jpg No edit summary current
- 15:1615:16, 8 November 2017 diff hist −59 m Main Page No edit summary
- 13:1613:16, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Joint System - Details
- 13:1513:15, 8 November 2017 diff hist +5 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details
- 13:1413:14, 8 November 2017 diff hist +15 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 13:1113:11, 8 November 2017 diff hist +22 m 751.13 Expansion Joint Systems →751.13.4.4 Design Example, Strip Seal at End Bent
- 13:0613:06, 8 November 2017 diff hist +8 m 751.13 Expansion Joint Systems →751.13.4.3 Strip Seal Expansion Joint System – Details
- 13:0513:05, 8 November 2017 diff hist +71 m 751.13 Expansion Joint Systems →751.13.3.6 Drainage Details
- 13:0413:04, 8 November 2017 diff hist −1 m 751.13 Expansion Joint Systems →751.13.2.4.2 Design Example 2: minor correction
- 13:0413:04, 8 November 2017 diff hist −2 m 751.13 Expansion Joint Systems →751.13.2.4.1 Design Example 1: minor corrections
- 12:5912:59, 8 November 2017 diff hist −25 m 236.1 General Information →236.1.3.3 Contract Procedures: Per RW, removed unecessary subtitle
7 November 2017
- 15:0815:08, 7 November 2017 diff hist 0 N File:236.7.3.3.1.docx No edit summary current
- 15:0815:08, 7 November 2017 diff hist −107 m 236.7 Negotiation Per RW, updated Form 236.7.3.3.1
- 14:2514:25, 7 November 2017 diff hist +230 m 902.11 Traffic Control for Schools →902.11.3 School Signal at Driveway: Per TS, clarified where school signals will be allowed and how they should operate when schools or special events are not in session.
- 14:1514:15, 7 November 2017 diff hist 0 153.21 Traffic updated link
- 10:4510:45, 7 November 2017 diff hist −1 m 751.6 General Quantities Per BR, Tack Coat plan reporting accuracy revised from 10 gal. to 1 gal. to be in accord with standard specs and official bid item listing
- 08:2608:26, 7 November 2017 diff hist +41 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per DE, added "and please advise when we can give a NTP", per FS's request
6 November 2017
- 14:4314:43, 6 November 2017 diff hist +1 Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 12:5012:50, 6 November 2017 diff hist +145 m Main Page EPG 131.1
- 12:3712:37, 6 November 2017 diff hist +48 m 131.1 Design Exception Process No edit summary
- 11:2211:22, 6 November 2017 diff hist −434 m 131.1 Design Exception Process Per DE, revised EPG 131.1.4 about where design exceptions should be stored/filed. Deleted EPG 131.5.2, removing the requirement of a transmittal letter for design exceptions.
- 08:2308:23, 6 November 2017 diff hist −28 m 236.13 Designing Right of Way Plans Per RW, clarify guidance by replacing "ratification" with "approval" to better explane how plans are certified and approved by Commission
3 November 2017
- 09:2209:22, 3 November 2017 diff hist +676 m Main Page EPG 751, EPG 127.13
- 08:2008:20, 3 November 2017 diff hist +137 770.8 Maintenance of Bridge Substructure →770.8.4 Steel Piling and Cast In Place (C.I.P.) Piling: Per BR, added link
- 08:1508:15, 3 November 2017 diff hist +4,079 751.40 LFD Widening and Repair →751.40.1.1 Widening and Repair of Existing Structures: Per BR, new EPG 751.40.1.2 is to be used by Bridge maintenance or district maintenance to maintain or repair existing steel HP piles
- 08:0708:07, 3 November 2017 diff hist +332 751.50 Standard Detailing Notes →J1. General: Per BR, revised and added notes pertaining to MSE wall plans
- 07:5907:59, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Nonintegral.jpg No edit summary current
- 07:5807:58, 3 November 2017 diff hist 0 N File:751.10.3.3 Part Elev of Integral.jpg No edit summary current
- 07:5707:57, 3 November 2017 diff hist +1,338 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, revised guidance for bridge deck drain, approach drainage, roadway drainage or collected drain water discharging into a MSE wall backfill area
- 07:5107:51, 3 November 2017 diff hist 0 N File:751.24.2.1 section AA.jpg No edit summary current