User contributions for EPGsysop
Jump to navigation
Jump to search
28 September 2017
- 14:0214:02, 28 September 2017 diff hist +1,541 m 751.10 General Superstructure →751.10.1 Slab on Girder: Per BR, Clarified how to show and identify the end of slab in a plan of slab detail when expansion joint systems are located at the end bents
- 14:0014:00, 28 September 2017 diff hist −1 m 751.6 General Quantities →751.6.2.10 Bridge Slabs
- 13:4413:44, 28 September 2017 diff hist +306 m 751.6 General Quantities →751.6.2.10 Bridge Slabs: Per BR, clarified how to estimate slab quantities when expansion joint systems are present
- 13:4213:42, 28 September 2017 diff hist +23 m 751.50 Standard Detailing Notes →B. Estimated Quantities Notes: inserted link
- 08:1908:19, 28 September 2017 diff hist 0 N File:751.5.1.4 file names.pdf No edit summary current
- 08:1808:18, 28 September 2017 diff hist +177 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 08:1308:13, 28 September 2017 diff hist −415 m Main Page EPG 751.5.1.4
- 08:1008:10, 28 September 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes
- 08:0908:09, 28 September 2017 diff hist 0 N File:751.5.1.4 file names 2017.jpg No edit summary current
- 08:0908:09, 28 September 2017 diff hist +631 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per BR, clarified guidance for change orders to bridge plans
- 06:5306:53, 28 September 2017 diff hist +572 620.12 Construction Inspection for Sec 620 →620.12.2.4 Acceptance (Sec 620.2.4)
- 06:4906:49, 28 September 2017 diff hist −11 620.1 General (MUTCD Chapter 3A) →620.1.4 Materials (MUTCD Section 3A.04)
27 September 2017
- 09:0409:04, 27 September 2017 diff hist +6 m Category:101 Standard Forms →Construction and Materials
- 08:5808:58, 27 September 2017 diff hist +9 m Category:101 Standard Forms →Construction and Materials: Per CM, updated link
- 08:0008:00, 27 September 2017 diff hist −413 m Main Page No edit summary
- 07:5407:54, 27 September 2017 diff hist +421 m Main Page EPG 616.14
- 07:3707:37, 27 September 2017 diff hist +124 m 616.14 Work Zone Safety and Mobility Policy Per DE, updates regarding Work Zone Transportation Management Plan. Revised definition of "significant project" in E 616.14.8. Requirements for TCP revised in E 616.14.10.
- 06:1606:16, 27 September 2017 diff hist −35 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per BR, minor removal of unnecessary instruction. Minor correction of terminology.
26 September 2017
- 07:5507:55, 26 September 2017 diff hist −156 m 238.3 Route Surveying No edit summary
22 September 2017
- 08:2908:29, 22 September 2017 diff hist +2 m Main Page No edit summary
20 September 2017
- 10:2210:22, 20 September 2017 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 10:2110:21, 20 September 2017 diff hist +21 m LPA:136.9 Plans, Specs and Estimates (PSE) No edit summary
- 10:2010:20, 20 September 2017 diff hist 0 N File:136.9.3 Sept 20 2017.docx No edit summary
- 10:2010:20, 20 September 2017 diff hist +3 m LPA:136.13 LPA Policy Changes No edit summary
- 10:1710:17, 20 September 2017 diff hist +42 m LPA:136.13 LPA Policy Changes No edit summary
- 10:1710:17, 20 September 2017 diff hist +192 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 10:1510:15, 20 September 2017 diff hist −4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 10:1510:15, 20 September 2017 diff hist 0 N File:136.9.3 Sept 2017.docx No edit summary
- 10:1510:15, 20 September 2017 diff hist −28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per DE, updated the Subcontractor Disclosure in Fig. 136.9.3 to reflect the current section of the Missouri Standard Specification for Highway Construction.
- 09:5409:54, 20 September 2017 diff hist +15 m 821.18 Noxious Weeds →Table 821.18.2 Musk, Canada and Scotch Thistle: Per MT, added "and Marijuana" to table title
19 September 2017
- 12:5512:55, 19 September 2017 diff hist 0 N File:Main Page Sep 19, 2017.jpg No edit summary current
- 12:5512:55, 19 September 2017 diff hist −68 Main Page EPG 236.5.19
- 12:3112:31, 19 September 2017 diff hist +305 m 236.5 Property Management →236.5.19 Survey Requirements: Per RW, clarified who may prepare legal descriptions since SB828 enabled Title Companies and Legal Counsel to prepare legal descriptions
- 11:3111:31, 19 September 2017 diff hist +26 m 751.50 Standard Detailing Notes →J1. General: added link
18 September 2017
- 13:2813:28, 18 September 2017 diff hist +158 m LPA:136.13 LPA Policy Changes No edit summary
- 13:2513:25, 18 September 2017 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 13:2513:25, 18 September 2017 diff hist 0 N File:136.3.1 Sept 2017.doc No edit summary current
- 13:2413:24, 18 September 2017 diff hist +30 m LPA:136.3 Federal Aid Basics Per LPA, clarified Fig. 136.3.1
- 10:1610:16, 18 September 2017 diff hist −2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: minor correction, per BR
- 07:0407:04, 18 September 2017 diff hist +118 m Main Page EPG 616.8
- 07:0007:00, 18 September 2017 diff hist 0 N File:616.8.46 MT 2017.pdf No edit summary current
- 07:0007:00, 18 September 2017 diff hist 0 N File:616.8.10g MT 2017.pdf No edit summary current
- 07:0007:00, 18 September 2017 diff hist 0 N File:616.8.10a MT 2017.pdf No edit summary current
- 07:0007:00, 18 September 2017 diff hist 0 N File:616.8.10 MT 2017.pdf No edit summary current
- 06:5906:59, 18 September 2017 diff hist +19 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Maintenance: Per TS, implementing Nat'l Safety Council’s 3-2-1 Cone Procedure for internal operations. TA-10, TA-10a & TA-10g updated to show new cone procedure
15 September 2017
- 11:2311:23, 15 September 2017 diff hist +17 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:2211:22, 15 September 2017 diff hist −82 m 751.36 Driven Piles →751.36.3 Design Procedure
- 10:1310:13, 15 September 2017 diff hist +854 m 751.50 Standard Detailing Notes Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified. E2 table revised as well as note E2.22. Note G7.4 added.
- 10:1110:11, 15 September 2017 diff hist +135 m 751.36 Driven Piles →751.36.3 Design Procedure: inserted links
- 09:5509:55, 15 September 2017 diff hist +297 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, clarifications related to 3/7/2017 revision. Min. hammer is not required when DT is specified.