User contributions for EPGsysop
Jump to navigation
Jump to search
30 August 2017
- 10:1710:17, 30 August 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.2.1.2.9 Slope Protection: updated links
- 10:1510:15, 30 August 2017 diff hist −58 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations: updated link
- 10:0710:07, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Retaining Wall.pdf No edit summary current
- 10:0610:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Culvert.pdf No edit summary current
- 10:0610:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Stream Crossing Bridge.pdf No edit summary current
- 10:0610:06, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Railroad Grade Separation.pdf No edit summary current
- 10:0610:06, 30 August 2017 diff hist −4 m 751.1 Preliminary Design →751.1.2.19.2 Content
- 10:0510:05, 30 August 2017 diff hist 0 N File:751.1.2.19.2 Highway Grade Separation.pdf No edit summary current
- 10:0310:03, 30 August 2017 diff hist +2,052 m 751.1 Preliminary Design Per BR, clarified guidance for bridge clearances.
29 August 2017
- 10:0910:09, 29 August 2017 diff hist −9 m Main Page EPG 643.4
- 09:3609:36, 29 August 2017 diff hist +5 Main Page No edit summary
- 08:0308:03, 29 August 2017 diff hist 0 N File:643.4.1.14.pdf No edit summary current
- 08:0208:02, 29 August 2017 diff hist 0 N File:643.4.1.14.jpg No edit summary current
- 08:0108:01, 29 August 2017 diff hist +691 643.4 Railroads →643.4.1.14 Railroad Crossing Median Islands: Per DE, policy for raised islands at railroad crossings now consistent w/ fed regulations by reducing the speed limit threshold from 45 to 40 mph
- 07:4907:49, 29 August 2017 diff hist −1,404 616.23 Traffic Control for Field Operations →616.23.2.4 Flagger Control: Per TS, info moved to EPG 616.5
- 07:4507:45, 29 August 2017 diff hist −22,546 616.20 Flagger Training Per TS, info moved to EPG 616.5 current
- 07:3607:36, 29 August 2017 diff hist +115 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.81 Lighting Devices (MUTCD 6F.81): Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
- 07:3207:32, 29 August 2017 diff hist 0 N File:616.5.8 nighttime.jpg No edit summary current
- 07:3007:30, 29 August 2017 diff hist 0 N File:616.5.7.1.jpg No edit summary current
- 07:2907:29, 29 August 2017 diff hist +1,433 616.5 Flagger Control (MUTCD Chapter 6E) Per TS, Nat'l Safety Council’s 3-2-1 Cone Procedure implemented for internal ops. Flagger lighting requirements for contract and MoDOT operations increased to 5.0 ft-candles to meet OSHA requirements
- 07:2307:23, 29 August 2017 diff hist +118 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) Per TS, due to flagger fatalities, MoDOT has implemented the National Safety Council’s 3-2-1 Cone Procedure into the MoDOT Maintenance operations.
25 August 2017
- 11:3111:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.6 Aug 2017.jpg No edit summary current
- 11:3111:31, 25 August 2017 diff hist 0 N File:751.9.3.1.7.4 Aug 2017.jpg No edit summary current
- 11:3011:30, 25 August 2017 diff hist +8 m 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections: Per BR, revised two figures about the splice stagger requirement for seismic column detail
24 August 2017
- 09:4409:44, 24 August 2017 diff hist +4 m Main Page No edit summary
- 09:4309:43, 24 August 2017 diff hist 0 N File:Main Page Aug 24, 2017.jpg No edit summary current
- 09:4309:43, 24 August 2017 diff hist −557 m Main Page EPG 751.20.3.1
- 06:1606:16, 24 August 2017 diff hist +18 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs
- 06:1506:15, 24 August 2017 diff hist 0 N File:751.20.3.1 end span.jpg No edit summary current
- 06:1406:14, 24 August 2017 diff hist −38 m 751.17 Concrete Slab Bridges →751.20.3.1 Solid Slabs: Per BR, revised the intermediate bent beam cap height for solid slab end span to accommodate commercially available forming systems
23 August 2017
- 12:0712:07, 23 August 2017 diff hist +364 m Category:641 Bicycle Facilities added link to FHWA resources
- 12:0512:05, 23 August 2017 diff hist +366 m LPA:136.7 Design added link to FHWA sources
- 11:5911:59, 23 August 2017 diff hist −21 m Category:641 Bicycle Facilities →641.1 Types of Facilities: updated link
22 August 2017
- 12:3212:32, 22 August 2017 diff hist 0 N File:902.5.23 Left 2017.xls No edit summary
- 12:3212:32, 22 August 2017 diff hist +10 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) Per TS, corrected a formula in Left Turn Phasing Warrants spreadsheet
18 August 2017
- 14:0114:01, 18 August 2017 diff hist 0 m Main Page No edit summary
- 12:0512:05, 18 August 2017 diff hist −24 m 236.7 Negotiation Per RW, updated form link
- 12:0212:02, 18 August 2017 diff hist −354 m 236.6 Appraisal and Appraisal Review Per RW, updated form link
- 11:5811:58, 18 August 2017 diff hist −898 m 236.5 Property Management Per RW, updated form links
17 August 2017
- 06:1306:13, 17 August 2017 diff hist +184 m Category:903 Highway Signing updated several links
16 August 2017
- 12:5512:55, 16 August 2017 diff hist 0 m Main Page No edit summary
15 August 2017
- 13:5313:53, 15 August 2017 diff hist 0 m Main Page No edit summary
14 August 2017
- 11:2011:20, 14 August 2017 diff hist +2 m 751.36 Driven Piles →751.36.2 Steel Pile
- 10:1210:12, 14 August 2017 diff hist −2 m Category:Safe and Sound →General: Per TS, updated "Type III" barricade to "Type 3"
- 10:1010:10, 14 August 2017 diff hist −6 m 616.18 Construction Inspection Guidelines for Sec 616 →For Sec. 616.3.2: Per TS, updated "Type III" barricade to "Type 3"
- 10:0910:09, 14 August 2017 diff hist −6 m 616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation Per TS, updated "Type III" barricade to "Type 3"
- 10:0810:08, 14 August 2017 diff hist +34 m Where to Find PDM Information in the EPG →Chapter VIII, Traffic Control Devices
- 10:0110:01, 14 August 2017 diff hist −6 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) Per TS, updated "Type III" barricade to "Type 3"
- 09:3709:37, 14 August 2017 diff hist +153 m Main Page EPG 751.36.2
- 09:2009:20, 14 August 2017 diff hist +2 751.50 Standard Detailing Notes →G7. HP Pile