User contributions for EPGsysop
Jump to navigation
Jump to search
16 June 2017
- 11:0311:03, 16 June 2017 diff hist +125 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, clarified and corrected foundation data
- 09:4209:42, 16 June 2017 diff hist −33 m Main Page EPG 751.22.3.15
- 09:3809:38, 16 June 2017 diff hist +222 m 751.9 Bridge Seismic Design Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 09:3209:32, 16 June 2017 diff hist 0 m 751.9 Bridge Seismic Design No edit summary
- 09:2809:28, 16 June 2017 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods)
- 09:2309:23, 16 June 2017 diff hist 0 N File:751.22.3.15.jpg No edit summary current
- 09:2209:22, 16 June 2017 diff hist −33 m 751.22 Prestressed Concrete I Girders →751.22.3.15 Dowel Bars (Rods): Per BR, clarified length requirements for dowel bars for prestressed girder bridges. Re-named "dowel rods" as "dowel bars".
- 07:5807:58, 16 June 2017 diff hist −9 m Main Page EPG 606.1
- 07:5807:58, 16 June 2017 diff hist +32 m 606.1 Guardrail No edit summary
- 07:5007:50, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xlsx No edit summary
- 07:4907:49, 16 June 2017 diff hist +2 m 606.1 Guardrail No edit summary
- 07:4607:46, 16 June 2017 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator.xls No edit summary
- 07:4607:46, 16 June 2017 diff hist +547 m 606.1 Guardrail Per CADD, added Guardrail Length of Need Calculator
15 June 2017
- 13:4013:40, 15 June 2017 diff hist +65 m 153.9 Design Per LPA, updated some contract titles and a few other items
- 13:0213:02, 15 June 2017 diff hist 0 N File:902.5.29 Flashing Yellow Arrow brochure.pdf No edit summary current
- 13:0213:02, 15 June 2017 diff hist −11 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.29 Guidelines for Use of the Flashing Yellow Left Arrow: Updated link
- 12:4412:44, 15 June 2017 diff hist +210 m Main Page EPG 751.6.2.17, EPG 747.1.6.2
- 12:3812:38, 15 June 2017 diff hist +425 751.50 Standard Detailing Notes →J. MSE Wall Notes (Notes for Bridge Standard Drawings): Per BR, new J1.30 notes the revision of Bridge standard drawings for MSE wall for excavation
- 12:3412:34, 15 June 2017 diff hist +427 751.24 Retaining Walls →751.24.2.2 Details: Per BR, Cross-reference added for excavation and division responsibilities for preparing MSE wall plans, computing excavation class and quantities.
- 12:2012:20, 15 June 2017 diff hist 0 m 751.6 General Quantities No edit summary
- 12:1912:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7b.jpg No edit summary current
- 12:1912:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 7a.jpg No edit summary current
- 12:1912:19, 15 June 2017 diff hist 0 N File:751.6.2.17 case 6.jpg No edit summary current
- 12:1812:18, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5b.jpg No edit summary current
- 12:1812:18, 15 June 2017 diff hist 0 m 751.6 General Quantities No edit summary
- 12:1712:17, 15 June 2017 diff hist 0 N File:751.6.2.17 case 5a.jpg No edit summary current
- 12:1612:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 4.jpg No edit summary current
- 12:1612:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 3.jpg No edit summary current
- 12:1612:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 2.jpg No edit summary current
- 12:1612:16, 15 June 2017 diff hist 0 N File:751.6.2.17 case 1.jpg No edit summary current
- 12:1512:15, 15 June 2017 diff hist 0 m 751.6 General Quantities No edit summary
- 12:1412:14, 15 June 2017 diff hist 0 N File:751.6.2.17.jpg No edit summary current
- 12:1312:13, 15 June 2017 diff hist 0 m 751.6 General Quantities →751.6.2.17 Excavation
- 12:1212:12, 15 June 2017 diff hist 0 N File:751.6.2.17 earth work.jpg No edit summary current
- 12:1112:11, 15 June 2017 diff hist 0 N File:751.6.2.17 Semi Deep Case 1 Section AA.jpg No edit summary current
- 12:1112:11, 15 June 2017 diff hist +6,439 751.6 General Quantities →751.6.2.17 Excavation: Per BR, different possible cases for MSE wall excavation added
- 09:4909:49, 15 June 2017 diff hist +175 m Main Page EPG 620, EPG 1048
- 09:4009:40, 15 June 2017 diff hist −1,423 620.12 Construction Inspection for Sec 620 Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 09:3109:31, 15 June 2017 diff hist −310 620.1 General (MUTCD Chapter 3A) Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 09:2009:20, 15 June 2017 diff hist +97 Category:1048 Pavement Marking Material →1048.2.1 Type 1 and Type 2 Preformed Marking Tape: Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance
- 09:1109:11, 15 June 2017 diff hist 0 m Category:620 Pavement Marking No edit summary current
- 09:1009:10, 15 June 2017 diff hist 0 N File:620 decision 2017.jpg No edit summary current
- 09:1009:10, 15 June 2017 diff hist 0 N File:620 Durable.doc No edit summary current
- 09:1009:10, 15 June 2017 diff hist +321 Category:620 Pavement Marking Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 07:3407:34, 15 June 2017 diff hist +3,710 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, division responsibilities for preparing MSE wall plans, computing excavation quantities and locations added
14 June 2017
- 14:2214:22, 14 June 2017 diff hist −2 m Main Page No edit summary
9 June 2017
- 12:5612:56, 9 June 2017 diff hist −58 m Main Page EPG 402, EPG 450, EPG 751.24, EPG 760
- 11:4811:48, 9 June 2017 diff hist 0 N File:760.4.2 FAQ 2017.docx No edit summary current
- 11:4811:48, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures No edit summary
- 11:4711:47, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures Per TP, also updated FAQ document