User contributions for EPGsysop
Jump to navigation
Jump to search
31 May 2017
- 08:5308:53, 31 May 2017 diff hist −466 m Category:108 Prosecution and Progress No edit summary
- 08:5108:51, 31 May 2017 diff hist +466 m Category:108 Prosecution and Progress Per CM, updated link to Final Acceptance Report (C-239)
- 08:4508:45, 31 May 2017 diff hist +498 m Category:101 Standard Forms →Construction and Materials: Per CM, updated several links
30 May 2017
- 14:0914:09, 30 May 2017 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added link to Final Acceptance Report (C-239)
- 14:0814:08, 30 May 2017 diff hist +62 m Category:108 Prosecution and Progress Per CM, added link to Final Acceptance Report (C-239)
- 12:2812:28, 30 May 2017 diff hist 0 N File:108.16.2 Sample Final Inspection Letter 2017.pdf No edit summary current
- 12:2812:28, 30 May 2017 diff hist +5 m Category:108 Prosecution and Progress Per CM, updated Fig. 108.16.2, Sample Final Inspection letter, by adding a statement to remind contractors to upload any remaining QC documents.
- 11:5511:55, 30 May 2017 diff hist +49 m Main Page EPG 101
- 11:3011:30, 30 May 2017 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px
- 10:3110:31, 30 May 2017 diff hist +7 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Envir'l, clarified Consent Decree Initial Set-Up QRG per no. of disturbed acres when adding a project to database as well as prerequisite dates for Insp.
26 May 2017
- 13:2913:29, 26 May 2017 diff hist −526 m Category:240 Maintenance and Emergency Crossovers No edit summary
25 May 2017
- 13:5213:52, 25 May 2017 diff hist 0 m Main Page No edit summary
- 12:3312:33, 25 May 2017 diff hist +10 m Main Page No edit summary
24 May 2017
- 07:2907:29, 24 May 2017 diff hist +29 m LPA:136.13 LPA Policy Changes No edit summary
- 07:2807:28, 24 May 2017 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.3.20
- 07:2707:27, 24 May 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.20
- 07:2707:27, 24 May 2017 diff hist 0 N File:Fig.136.3.20 2017.docx No edit summary
- 07:2607:26, 24 May 2017 diff hist 0 m LPA:136.3 Federal Aid Basics Per BR, updated Fig. 136.3.20, BEAP Project Tracking Form
22 May 2017
- 13:3113:31, 22 May 2017 diff hist 0 N File:Main Page 3 May 22, 2017.jpg No edit summary current
- 13:3113:31, 22 May 2017 diff hist 0 N File:Main Page 2 May 22, 2017.jpg No edit summary current
- 13:3113:31, 22 May 2017 diff hist 0 N File:Main Page May 22, 2017.jpg No edit summary current
- 13:3013:30, 22 May 2017 diff hist +45 m Main Page No edit summary
- 09:1409:14, 22 May 2017 diff hist +307 m 153.9 Design Per DE, revised who need to review several agreements
19 May 2017
- 13:5913:59, 19 May 2017 diff hist 0 N File:Main Page May 19, 2017.jpg No edit summary current
- 13:5913:59, 19 May 2017 diff hist −424 m Main Page EPG 751
- 12:4512:45, 19 May 2017 diff hist +126 m 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:3512:35, 19 May 2017 diff hist 0 N File:751.39 2017.jpg No edit summary current
- 12:3412:34, 19 May 2017 diff hist −144 m 751.39 Pile Footings Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:2812:28, 19 May 2017 diff hist +3 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.5 Wing & Detached Wing Walls
- 12:2712:27, 19 May 2017 diff hist 0 N File:751.35.3.5 detached wing 2017.jpg No edit summary current
- 12:2612:26, 19 May 2017 diff hist 0 N File:751.35.3.5 2017.jpg No edit summary current
- 12:2612:26, 19 May 2017 diff hist 0 N File:751.35.3.4 May 2017.jpg No edit summary current
- 12:2612:26, 19 May 2017 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent
- 12:2512:25, 19 May 2017 diff hist 0 N File:751.35.3.3 May 2017.jpg No edit summary current
- 12:2512:25, 19 May 2017 diff hist +136 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3 Dimensions: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 12:0912:09, 19 May 2017 diff hist +2 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders
- 12:0612:06, 19 May 2017 diff hist 0 N File:751.34.3.2 safety barrier.jpg No edit summary current
- 12:0612:06, 19 May 2017 diff hist 0 N File:751.34.3.2 part section.jpg No edit summary current
- 12:0512:05, 19 May 2017 diff hist 0 N File:751.34.3.2.jpg No edit summary current
- 12:0512:05, 19 May 2017 diff hist +10 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.2.2 Loads
- 12:0312:03, 19 May 2017 diff hist 0 N File:751.34.2.2 detached wing.jpg No edit summary current
- 12:0212:02, 19 May 2017 diff hist 0 N File:751.34.2.2 elevation.jpg No edit summary current
- 12:0212:02, 19 May 2017 diff hist +55 m 751.34 Concrete Pile Cap Non-Integral End Bents Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
- 11:4211:42, 19 May 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent
- 11:3411:34, 19 May 2017 diff hist 0 N File:751.32.3.3 part elev 2017.jpg No edit summary current
- 11:3411:34, 19 May 2017 diff hist 0 N File:751.32.3.2 2017.jpg No edit summary current
- 11:3311:33, 19 May 2017 diff hist +10 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3 Details: Per BR, revised pile cap bent, end bent and seal course guidance to show 18” embedment in concrete for all piles.
17 May 2017
- 14:0414:04, 17 May 2017 diff hist +8 m Main Page No edit summary
- 14:0314:03, 17 May 2017 diff hist 0 N File:Main Page May 17, 2017.jpg No edit summary current
- 14:0314:03, 17 May 2017 diff hist −350 m Main Page No edit summary