User contributions for EPGsysop
Jump to navigation
Jump to search
17 May 2017
- 09:4909:49, 17 May 2017 diff hist +77 m 751.35 Concrete Pile Cap Integral End Bents →751.35.3.3 Prestressed Girder End Bent: Per BR, further clarified girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17
- 09:4309:43, 17 May 2017 diff hist 0 N File:751.22.3.10 part plan skewed 2017.jpg No edit summary current
- 09:4309:43, 17 May 2017 diff hist +255 m 751.22 Prestressed Concrete I Girders →751.22.3.10 Closed Intermediate Bent Diaphragms: Per BR, girder chair detail & end distance from center line of bearing to end of steel & prestressed girders w/ info left out from 4/11/17 revision
- 09:0409:04, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 17 2017.jpg No edit summary current
- 09:0209:02, 17 May 2017 diff hist +3 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 09:0009:00, 17 May 2017 diff hist 0 N File:751.11.3.6 side May 2017.jpg No edit summary current
- 09:0009:00, 17 May 2017 diff hist +4 m 751.11 Bearings →751.11.3 Details: Per BR, further clarified girder chair detail and end distance from center line of bearing to end of steel and prestressed girders w/ info inadvertently left out by division
16 May 2017
- 12:3712:37, 16 May 2017 diff hist 0 N File:134.2.2.2 May 16 2017.docx No edit summary current
- 12:3612:36, 16 May 2017 diff hist +12 m Category:134 Engineering Professional Services further, minor update of Form 134.2.2.2
- 12:3512:35, 16 May 2017 diff hist +3 m Category:101 Standard Forms minor update of Form 134.2.2.2
- 12:2612:26, 16 May 2017 diff hist +10 m 751.22 Prestressed Concrete I Girders →751.22.3.6.2 Shear Reinforcement: Per BR, added a common, available wire size that was inadvertently excluded in the original Nov 22, '17 revision.
- 11:1211:12, 16 May 2017 diff hist +3 m 238.3 Route Surveying updated GPS reference station network link
- 11:0911:09, 16 May 2017 diff hist 0 m Category:134 Engineering Professional Services updated GPS Reference Station network link
12 May 2017
- 14:2214:22, 12 May 2017 diff hist −2 m Main Page No edit summary
- 14:0114:01, 12 May 2017 diff hist −7 m Category:101 Standard Forms Per LPA, updated two forms: Submittal to Professioanl Services Committee and the Consultant Rating Form
- 13:5913:59, 12 May 2017 diff hist 0 N File:134.2.2.5.1 May 2017.doc No edit summary current
- 13:5913:59, 12 May 2017 diff hist 0 N File:134.2.2.2 May 2017.docx No edit summary current
- 13:5913:59, 12 May 2017 diff hist −28 m Category:134 Engineering Professional Services Per LPA, updated two forms, Figs. 134.2.2.2 and 134.2.2.5.1, with minor updates
- 11:5611:56, 12 May 2017 diff hist −137 m Main Page EPG 236.7.2.3
- 11:3711:37, 12 May 2017 diff hist 0 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, increased the minimum offer of prompt offer of just compensation from $300 to $500
- 07:5307:53, 12 May 2017 diff hist −1 m Main Page No edit summary
- 07:1907:19, 12 May 2017 diff hist 0 N File:616.13.7.1 2017.xlsx No edit summary current
- 07:1907:19, 12 May 2017 diff hist +10 m 616.13 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Pacing Worksheet
11 May 2017
- 08:4608:46, 11 May 2017 diff hist −14 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): updated jsp link
10 May 2017
- 07:4707:47, 10 May 2017 diff hist −13 m Main Page EPG 402 and EPG 409
- 07:3007:30, 10 May 2017 diff hist 0 N File:402 CLC MoDOT 2017.pdf No edit summary current
- 07:3007:30, 10 May 2017 diff hist 0 N File:402 CLC Contractor 2017.pdf No edit summary current
- 07:2907:29, 10 May 2017 diff hist +10 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the MoDOT/Contractor files were further updated
- 06:3306:33, 10 May 2017 diff hist 0 N File:409 Seal Coat MoDOT.pdf No edit summary current
- 06:3306:33, 10 May 2017 diff hist 0 N File:409 Seal Coat Contractor.pdf No edit summary
- 06:3206:32, 10 May 2017 diff hist 0 File:409 FY2018 Contract Seal Coat Guidelines.docx uploaded a new version of "Image:409 FY2018 Contract Seal Coat Guidelines.docx" current
- 06:3006:30, 10 May 2017 diff hist 0 N File:409 FY2018 Contract Seal Coat Guidelines.docx No edit summary
- 06:3006:30, 10 May 2017 diff hist −1,223 m Category:409 Seal Coat Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
- 06:1906:19, 10 May 2017 diff hist 0 N File:402 CLC MoDOT.pdf No edit summary current
- 06:1906:19, 10 May 2017 diff hist 0 N File:402 CLC Contractor.pdf No edit summary current
- 06:1906:19, 10 May 2017 diff hist 0 N File:402 FY2018 Contract Leveling Coat Guidelines.docx No edit summary current
- 06:1906:19, 10 May 2017 diff hist −1,085 m Category:402 Bituminous Surface Leveling Per Bidding and Contract, the CLC guidelines and MoDOT/Contractor files were updated
5 May 2017
- 13:4913:49, 5 May 2017 diff hist 0 m Main Page No edit summary
4 May 2017
- 13:3313:33, 4 May 2017 diff hist +265 m 171.5 Drainage Added link to Culvert Pipe Replacement video
3 May 2017
- 11:3811:38, 3 May 2017 diff hist 0 m Main Page No edit summary
- 08:0208:02, 3 May 2017 diff hist −107 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.2 No-Passing Zone Pavement Markings and Warrants (MUTCD Section 3B.02): Per TR, removed an MUTCD clause since we do not use the NO PASSING ZONE sign on a statewide basis
- 07:1207:12, 3 May 2017 diff hist +1,440 m 153.19 Multimodal Per MO, updated tables to relfect current contract listings
2 May 2017
- 11:1211:12, 2 May 2017 diff hist +302 m Category:101 Standard Forms →Construction and Materials: Per CM, added to links: 2017 Statewide Rail Cable Fence Spreadsheets (Grading and No Grading)
- 10:1910:19, 2 May 2017 diff hist +8 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, dashes allowed
1 May 2017
- 10:0410:04, 1 May 2017 diff hist +61 m Main Page EPG 137
- 09:1209:12, 1 May 2017 diff hist −1 m Category:137 Construction Inspection Guidance for Records to be Maintained No edit summary
- 09:1009:10, 1 May 2017 diff hist −18 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 09:0909:09, 1 May 2017 diff hist 0 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention
- 09:0809:08, 1 May 2017 diff hist 0 N File:137.3 good 2017.jpg No edit summary current
- 09:0709:07, 1 May 2017 diff hist −4,885 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, updated terminology for storing project documents, which are now stored in eProjects rather than the CIA (V drive)