User contributions for Smithk
Jump to navigation
Jump to search
5 December 2016
- 08:1208:12, 5 December 2016 diff hist −50 751.24 Retaining Walls →751.24.2 Mechanically Stabilized Earth (MSE) Walls: Per BR, clarified form liner requirements for large block wall.
- 07:5207:52, 5 December 2016 diff hist +774 751.1 Preliminary Design Per BR, clarified form liner requirements for large block wall.
- 07:3907:39, 5 December 2016 diff hist +1,400 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, clarified form liner requirements for large block wall.
23 November 2016
- 14:4814:48, 23 November 2016 diff hist 0 N File:123.1.1 Podi list 2016.xlsm No edit summary
- 14:4814:48, 23 November 2016 diff hist −437 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated PODI list
- 14:4614:46, 23 November 2016 diff hist −428 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding, updated PODI list
- 14:4314:43, 23 November 2016 diff hist −414 m Category:101 Standard Forms Per Bidding, updated D-12 link
- 14:4214:42, 23 November 2016 diff hist −414 m 643.2 Local Utility Adjustments - Public and Private Per Bidding, updated D-12 link
- 14:4114:41, 23 November 2016 diff hist 0 N File:237.9 D-12.docx No edit summary
- 14:4114:41, 23 November 2016 diff hist −828 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding, updated D-12 link
- 14:3914:39, 23 November 2016 diff hist −828 m 237.9 Submission of Plans and Supporting Documents Per Bidding, updated D-12 link
- 09:5309:53, 23 November 2016 diff hist −39 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement: Per BR, corrected (6) to remove a reference to avoiding angled hairpins for CIP decks
- 09:4909:49, 23 November 2016 diff hist +29 m Main Page No edit summary
- 08:0908:09, 23 November 2016 diff hist −1 m 236.4 Description Writing and Titles →236.4.4.5 Agreements Between Commission and Abstractor or Title Companies: Per RW, provided clarification for Title Services Agreements
- 08:0008:00, 23 November 2016 diff hist +1,009 m Category:142 Missouri One Call System Per Geotechnical, updated to fit current dig-rite rules, regulations and procedures
- 07:0807:08, 23 November 2016 diff hist +35 m 127.1 Request for Environmental Services updated link
22 November 2016
- 13:3213:32, 22 November 2016 diff hist +2 m Main Page No edit summary
- 13:3113:31, 22 November 2016 diff hist −149 m Main Page EPG 751.50
- 13:2813:28, 22 November 2016 diff hist +279 m 751.50 Standard Detailing Notes →J1. General: Per BR, clarified responsibility of MSE wall designer/manufacturer to show range of acceptable ɵ angle for slope excavation line on drawings to be consistent w/ design computations
- 12:5812:58, 22 November 2016 diff hist −77 m Main Page EPG 751.10, EPG 751.22
- 12:2912:29, 22 November 2016 diff hist −19 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): updated link
- 10:2110:21, 22 November 2016 diff hist +2,566 m 751.22 Prestressed Concrete I Girders Per BR, updated guidance for shear reinforcement to current practice and preferences of manufacturers and reinforcement suppliers. A1 reinforcement will not use WWR located in the flange of NU girders
- 09:0509:05, 22 November 2016 diff hist −2 m Category:700 STRUCTURES AND HYDRAULICS No edit summary
- 09:0509:05, 22 November 2016 diff hist +2,215 Nm Category:771 Bridge Preventive Maintenance Guidelines Per BR, EPG 771's "Preventative" updated to "Preventive". EPG 771 was originally set up Dec 21, 2007. There were absolutely no changes to this page since 2007. current
- 08:5808:58, 22 November 2016 diff hist −2 m 771.1 Concrete Bridge Approach Slab Repair: Slab Stabilization (Jacking) No edit summary
- 08:5808:58, 22 November 2016 diff hist −2 m 771.2 Bridge Cleaning and Flushing No edit summary
- 08:5808:58, 22 November 2016 diff hist −2 m 771.3 Shaving Shoulder and Around Guardrail No edit summary current
- 08:5708:57, 22 November 2016 diff hist −2 m 771.4 Drain Basin Maintenance No edit summary current
- 08:5708:57, 22 November 2016 diff hist −2 m 771.5 Mat Gutter Maintenance No edit summary current
- 08:5708:57, 22 November 2016 diff hist −2 m 771.6 Channel Work - Gabion Installation No edit summary current
- 08:5608:56, 22 November 2016 diff hist −2 m 771.7 Channel Work - Rock Blanket No edit summary current
- 08:5608:56, 22 November 2016 diff hist −2 m 771.8 Remove Drift No edit summary current
- 08:5608:56, 22 November 2016 diff hist −2 m 771.9 Temporary Bridge Deck Repair No edit summary
- 08:5508:55, 22 November 2016 diff hist −2 m 771.10 Bridge Joint Sealing - Hot Pour No edit summary current
- 08:5508:55, 22 November 2016 diff hist −2 m 771.11 Bridge Joint Sealing - Silicone No edit summary
- 08:5408:54, 22 November 2016 diff hist −2 m 771.12 Bridge Joint Sealing - Polytite No edit summary current
- 08:5408:54, 22 November 2016 diff hist −2 m 771.13 Sealing Abutment and Pier Caps No edit summary current
- 08:5408:54, 22 November 2016 diff hist −2 m 771.14 Spot Painting of Bearings and Piling No edit summary
- 08:5308:53, 22 November 2016 diff hist −2 m 771.15 Concrete Bridge Deck Sealer Selection Matrix No edit summary current
- 08:5308:53, 22 November 2016 diff hist −2 m 771.16 Penetrating Concrete Sealer - Silane No edit summary current
- 08:5208:52, 22 November 2016 diff hist −2 m 771.17 Concrete Crack Filler - Low Viscosity Polymer (LVP) No edit summary current
- 08:5208:52, 22 November 2016 diff hist −2 m 771.18 In-Deck Bridge Deck Crack Filler No edit summary current
- 08:5108:51, 22 November 2016 diff hist −2 m 771.19 Chip Seal to Entire Deck No edit summary
- 08:5008:50, 22 November 2016 diff hist −2 m 771.20 Cut and Spray Brush and Vines No edit summary current
- 08:5008:50, 22 November 2016 diff hist −2 m 771.21 Rainy Day Bridge Activities No edit summary current
- 08:2408:24, 22 November 2016 diff hist −290 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per BR, clarified hairpin guidance
- 08:1708:17, 22 November 2016 diff hist 0 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details
- 08:1608:16, 22 November 2016 diff hist +177 m 751.14 Steel Superstructure →751.14.4.5 Shear Connector Details: Per BR, hairpin guidance clarified
- 08:1108:11, 22 November 2016 diff hist 0 N File:751.14.4.5.jpg No edit summary current
- 08:0908:09, 22 November 2016 diff hist −34 m 751.5 Structural Detailing Guidelines updated link