User contributions for Smithk
Jump to navigation
Jump to search
22 November 2016
- 08:0708:07, 22 November 2016 diff hist +12 m 751.10 General Superstructure →751.10.1.14 Girder Haunch Reinforcement
- 08:0508:05, 22 November 2016 diff hist 0 N File:751.10.1.14 shape 10.jpg No edit summary current
- 08:0408:04, 22 November 2016 diff hist 0 N File:751.10.1.14 example.jpg No edit summary current
- 08:0408:04, 22 November 2016 diff hist 0 N File:751.10.1.14 part section.jpg No edit summary current
- 08:0408:04, 22 November 2016 diff hist +2,248 m 751.10 General Superstructure Per BR, expanded and clarified hairpin guidance especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
- 07:3107:31, 22 November 2016 diff hist +28 m 751.5 Structural Detailing Guidelines updated link
21 November 2016
- 15:1415:14, 21 November 2016 diff hist +1 m Main Page No edit summary
- 12:4312:43, 21 November 2016 diff hist −94 m 751.5 Structural Detailing Guidelines →751.5.9.2.8.4 Notes: Per BR, further clarified revision from 7/10/14 about mechanical bar splices
- 12:4212:42, 21 November 2016 diff hist +118 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per BR, further clarified revision from 7/10/14 about mechanical bar splices by updating MBS example figure
18 November 2016
- 15:0515:05, 18 November 2016 diff hist 0 m Main Page No edit summary
- 13:1713:17, 18 November 2016 diff hist 0 N File:751.5.9.2.8 example.pdf No edit summary
- 13:1713:17, 18 November 2016 diff hist −22 m 751.5 Structural Detailing Guidelines →751.5.9.2.8 Mechanical Bar Splices: Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Updated Mechanical Bar Splice Ex. figure
- 13:1213:12, 18 November 2016 diff hist +147 m 751.6 General Quantities Per Bridge, clarified revision from 7/10/14 about mechanical bar splices.
- 13:1013:10, 18 November 2016 diff hist −660 m 751.50 Standard Detailing Notes Per Bridge, clarified revision from 7/10/14 about mechanical bar splices. Note B1.9.7 removed.
- 10:2310:23, 18 November 2016 diff hist 0 m 103.1 Bid Opening and Award Process Per DE, updated due dates chart link
- 10:2110:21, 18 November 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per DE, updated due dates chart link
- 07:5407:54, 18 November 2016 diff hist 0 m Category:703 Concrete Masonry Construction →703.2.10 Cold Weather Placement: Per CM, revised to conform with the specs.
- 07:1407:14, 18 November 2016 diff hist −172 m 236.4 Description Writing and Titles Per RW, removed archaic RW43, Request for Proposals - Title Company Services (Form 4-4.5b)
17 November 2016
- 14:2914:29, 17 November 2016 diff hist +178 LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 14:2814:28, 17 November 2016 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 14:2714:27, 17 November 2016 diff hist 0 N File:136.9.3 2016.docx No edit summary
- 14:2714:27, 17 November 2016 diff hist +7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, updated Fig. 136.9.3 to reflect the current versions of specs and standard plans
- 08:2208:22, 17 November 2016 diff hist 0 N File:134.2.4 Nov 17 2016.docx No edit summary
- 08:2108:21, 17 November 2016 diff hist +9 m Category:134 Engineering Professional Services Fig. 134.2.4, minor update
- 07:4907:49, 17 November 2016 diff hist 0 N File:134.2.4 Nov 2016.docx No edit summary
- 07:4807:48, 17 November 2016 diff hist +3 m Category:134 Engineering Professional Services Per LPA, revised Fig 134.2.4. Added #5 in the fig that was accidentally deleted during the last revision.
16 November 2016
- 10:3510:35, 16 November 2016 diff hist +254 m Category:153 Agreements and Contracts Per RW, updated links and minor changes to wording
15 November 2016
- 12:4912:49, 15 November 2016 diff hist 0 m Main Page No edit summary
- 11:0911:09, 15 November 2016 diff hist +3 m Help Article No edit summary
- 11:0511:05, 15 November 2016 diff hist +1 m Help Article →EPG Approval Process
- 09:2509:25, 15 November 2016 diff hist −143 m 771.16 Penetrating Concrete Sealer - Silane →Materials: Per EPG, removed reference to archaic Penetrating Concrete Sealer JSP (which was a BSP)
- 08:5508:55, 15 November 2016 diff hist +41 m 153.21 Traffic Per TR, updated link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement
- 08:5308:53, 15 November 2016 diff hist −1 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 08:5208:52, 15 November 2016 diff hist −9 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others
- 08:5108:51, 15 November 2016 diff hist −322 m 903.15 Signing Agreements →903.16.3 TR-15 Sign Program Participation Paid by Others: Per TR, replaced TR-15A link with link to CCO’s sharepoint site for TR-32, Supplemental Signing Agreement.
- 08:4708:47, 15 November 2016 diff hist +178 m Category:903 Highway Signing Per TR, replaced TR 15A with a link from TR’s sharepoint site for TR-32, Process for Renewal – Supplemental Signing Agreement.
- 07:3707:37, 15 November 2016 diff hist −576 m 153.21 Traffic Per Commissioner's Secr. deleted TR08-A since it is now TR3
14 November 2016
- 15:0215:02, 14 November 2016 diff hist −46 m 153.21 Traffic Per Commissioneer's Secr, removed two archaic agreements and added two new ones
- 13:5513:55, 14 November 2016 diff hist 0 N File:Fig. 806.8.1 2016.docx No edit summary current
- 13:5413:54, 14 November 2016 diff hist 0 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Storm Water Compliance Coord'r, minor updated for Fig. 806.8.1 MoDOT/Contractor Responsibility
- 08:4808:48, 14 November 2016 diff hist +34 m 236.3 Administration Per Env'l, updated RES link
- 08:4608:46, 14 November 2016 diff hist +34 Category:101 Standard Forms →Environmental and Cultural: Per Env
- 08:4408:44, 14 November 2016 diff hist +34 m Category:128 Conceptual Studies Per Env'l, updated RES link
- 08:3508:35, 14 November 2016 diff hist +68 m 127.1 Request for Environmental Services Per Env'l, updated RES link
10 November 2016
- 13:4113:41, 10 November 2016 diff hist +209 m Main Page EPG 127
- 13:0913:09, 10 November 2016 diff hist −788 127.9 Floodplain Management Per Env'l, updated to reflect new processes and forms
- 12:4712:47, 10 November 2016 diff hist −14 m 127.14 National Environmental Policy Act (NEPA) Classification and Documents updated links
- 12:4512:45, 10 November 2016 diff hist 0 N File:127.11 SCS CPA.pdf No edit summary
- 12:4512:45, 10 November 2016 diff hist 0 N File:127.11 AD 1006.pdf No edit summary
- 12:4512:45, 10 November 2016 diff hist −30 m 127.11 Farmland Conversion updated links