User contributions for Smithk
Jump to navigation
Jump to search
22 September 2016
- 13:3013:30, 22 September 2016 diff hist 0 N File:616.14.10 Rte 50.pdf No edit summary current
- 13:2913:29, 22 September 2016 diff hist +255 m 616.14 Work Zone Safety and Mobility Policy →616.14.10 Transportation Management Plan: Per CM, added two TMP examples
- 13:1413:14, 22 September 2016 diff hist +68 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, clarification by boxing the guidance
- 11:3611:36, 22 September 2016 diff hist −3 m Category:617 Traffic Barrier Per BR, minor correction
- 11:3511:35, 22 September 2016 diff hist −3 m 611.3 Concrete Slope Protection →611.3.2 Construction Inspection (Sec 611.60.3): Per BR, minor correction
- 11:3411:34, 22 September 2016 diff hist −3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.6 Barrier Wall Delineation: Per BR, minor correction
- 11:3311:33, 22 September 2016 diff hist −3 m 620.5 Delineators (MUTCD Chapter 3F) →620.5.5 Guardrail Delineation: Per BR, minor correction
- 11:3211:32, 22 September 2016 diff hist −3 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Per BR, minor correction
- 11:3111:31, 22 September 2016 diff hist −24 m 751.50 Standard Detailing Notes Per BR, minor correction
- 09:5309:53, 22 September 2016 diff hist −13 m Main Page EPG 109.1
- 09:3209:32, 22 September 2016 diff hist +264 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, guidance about measuring quantities was clarified. Current guidance no longer exceeds the degree of accuracy requried by the specs or JSPs
- 08:3508:35, 22 September 2016 diff hist −38,199 m 751.5 Structural Detailing Guidelines Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:3107:31, 22 September 2016 diff hist −3,765 m 751.40 LFD Widening and Repair Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:2207:22, 22 September 2016 diff hist 0 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 07:2107:21, 22 September 2016 diff hist −560 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:1907:19, 22 September 2016 diff hist −468 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.2 Vertical Drains: Per BR, replaced outdated details with links to the internet
- 07:1407:14, 22 September 2016 diff hist +431 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.4 Exploded View of the End Bent: New EPG 751.34.3.5 (links to the internet in lieu of adding duplicate table)
- 07:1207:12, 22 September 2016 diff hist −1,488 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:0807:08, 22 September 2016 diff hist −4,294 m 751.13 Expansion Joint Systems →751.13.5.4 Flat Plate Expansion Devices - Details: Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:0607:06, 22 September 2016 diff hist −782 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (Top Mounted) TL-4 (NCHRP 350): Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 07:0107:01, 22 September 2016 diff hist −3,379 m 751.10 General Superstructure Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
- 06:5206:52, 22 September 2016 diff hist −1,483 m Category:503 Bridge Approach Slabs Per BR, replaced bridge standard drawing tables with links to MoDOT’s website.
15 September 2016
- 12:0212:02, 15 September 2016 diff hist 0 N File:Main Page September 15, 2016.jpg No edit summary current
- 12:0212:02, 15 September 2016 diff hist −184 m Main Page EPG 903
- 09:2209:22, 15 September 2016 diff hist −40 m 153.9 Design CCO renumbered the contracts. New links needed.
- 08:2708:27, 15 September 2016 diff hist +181 m 153.7 Construction and Materials CCO renumbered the contracts. New links needed.
- 08:0808:08, 15 September 2016 diff hist −46 m 153.5 Bridge CCO renumbered the contracts. New links needed.
- 07:3607:36, 15 September 2016 diff hist −1,027 m 903.3 Ground-Mounted Sign Supports Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
- 07:2107:21, 15 September 2016 diff hist +741 m 903.2 Extent of Signing →903.2.12 Quantity Computations: Per TS, revisions bring guidance into conformance with recent standard plan and policy changes.
14 September 2016
- 12:5212:52, 14 September 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements No edit summary
- 09:3409:34, 14 September 2016 diff hist −199 m Main Page EPG 110.3
- 07:0407:04, 14 September 2016 diff hist +397 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, guidance updated to comply with the e-Construction JSP.
- 06:2006:20, 14 September 2016 diff hist +26 m 903.6 Warning Signs →903.6.33 LANE END Signs (W4-2, W9-1, W9-2) (MUTCD Section 2C.42): Per TS, clarification of the use of Lane Ends sign
13 September 2016
- 10:2910:29, 13 September 2016 diff hist +87 m Category:101 Standard Forms No edit summary
- 10:2810:28, 13 September 2016 diff hist +87 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
- 10:2710:27, 13 September 2016 diff hist +87 m Category:101 Standard Forms →Construction and Materials: Per TS, updated WZ Inspection Form link
- 10:0010:00, 13 September 2016 diff hist −2 m Main Page No edit summary
- 09:2409:24, 13 September 2016 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing
- 09:1109:11, 13 September 2016 diff hist +54 m Category:101 Standard Forms Per TS, updated WZ Inspection Form links
- 09:1009:10, 13 September 2016 diff hist +27 m 616.26 Work Zone User Training Per TS, updated WZ Inspection Form link
9 September 2016
- 13:3613:36, 9 September 2016 diff hist 0 m Main Page No edit summary
8 September 2016
- 13:4413:44, 8 September 2016 diff hist 0 m Main Page No edit summary
7 September 2016
- 14:1014:10, 7 September 2016 diff hist −211 m Category:747 Bridge Reports and Layouts →747.1.3.5 Valley/Channel Section Sheets: Per BR, rvision brings guidance into line with related changes previously completed in EPG 238.3.36.3.6.
- 14:0714:07, 7 September 2016 diff hist −247 m 750.3 Bridges →750.3.2.5.2 Contraction Scour: Per BR, irrelevant paragraph removed
- 12:1912:19, 7 September 2016 diff hist +42 m 236.8 Relocation Assistance Program Per RW, updated link to Form 236.8.9.4.8, Replacement Housing Claim (Form 236.8.9.4(b))
- 11:5711:57, 7 September 2016 diff hist 0 N File:Main Page September 7, 2016.jpg No edit summary current
- 11:5711:57, 7 September 2016 diff hist +65 m Main Page No edit summary
- 06:2406:24, 7 September 2016 diff hist +35 m LPA:136.12 Figures, Glossary and Other Useful Links updated link to Form 136.8.7.1.11
- 06:1906:19, 7 September 2016 diff hist +35 m LPA:136.13 LPA Policy Changes No edit summary
- 06:1806:18, 7 September 2016 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition No edit summary