User contributions for Smithk
Jump to navigation
Jump to search
7 September 2016
- 06:1806:18, 7 September 2016 diff hist +35 m LPA:136.8 Local Public Agency Land Acquisition updated link
6 September 2016
- 10:2510:25, 6 September 2016 diff hist +214 m LPA:136.13 LPA Policy Changes Form 136.8.7.1.11
- 10:2210:22, 6 September 2016 diff hist −157 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 10:2110:21, 6 September 2016 diff hist +111 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.7.1.11
- 10:1810:18, 6 September 2016 diff hist 0 N File:136.8.7.1.11.docx No edit summary
- 10:1710:17, 6 September 2016 diff hist +20 m LPA:136.8 Local Public Agency Land Acquisition No edit summary
- 10:1710:17, 6 September 2016 diff hist −197 m LPA:136.8 Local Public Agency Land Acquisition Per RW, the prorata tax form (7-22.2C) was updated to be only for the LPAs. It was also relabeled as Form 136.8.7.1.11.
- 09:5609:56, 6 September 2016 diff hist +146 m Main Page EPG 131.1
- 09:0809:08, 6 September 2016 diff hist −754 m 751.5 Structural Detailing Guidelines →751.5.8.1 Bridge Approach Slab: Per BR, deleted links to archaic drawings of Approach slabs.
- 07:2107:21, 6 September 2016 diff hist +2,410 m 131.1 Design Exception Process Per EPG, federal rule has reduced controlling criteria to 10, reducing instances where fed approval is required for controlling criteria on federal involvement projects.
2 September 2016
- 14:1714:17, 2 September 2016 diff hist +1 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award
- 14:0314:03, 2 September 2016 diff hist +4 m Main Page No edit summary
- 13:2313:23, 2 September 2016 diff hist 0 m LPA:136.13 LPA Policy Changes No edit summary
- 13:2213:22, 2 September 2016 diff hist +210 m LPA:136.13 LPA Policy Changes EPG 136.10.8
- 13:2013:20, 2 September 2016 diff hist +5 m LPA:136.10 Advertisement for Bid and Project Award →136.10.8 Award: Per LPA, clarified the need for a performance/contract bond in the executed construction contract for LPA projects.
31 August 2016
- 13:2413:24, 31 August 2016 diff hist 0 N File:Main Page 2 August 31, 2016.jpg No edit summary current
- 13:2413:24, 31 August 2016 diff hist 0 N File:Main Page August 31, 2016.jpg No edit summary current
- 13:2413:24, 31 August 2016 diff hist +550 m Main Page No edit summary
- 06:1306:13, 31 August 2016 diff hist 0 m Category:407 Tack Coat →407.1.5 Method of Measurement (Sec 407.5): Per CM, minor correction. To round gallons to nearest gallon, not nearest 10 gallons
30 August 2016
- 06:4806:48, 30 August 2016 diff hist 0 m Main Page No edit summary
29 August 2016
- 09:4309:43, 29 August 2016 diff hist +10 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 09:4109:41, 29 August 2016 diff hist 0 N File:751.13.6.3 squared 2016.jpg No edit summary current
- 09:4109:41, 29 August 2016 diff hist +204 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
- 09:2309:23, 29 August 2016 diff hist 0 N File:751.13.6.3 skewed 2016.jpg No edit summary current
- 09:2309:23, 29 August 2016 diff hist +4 m 751.13 Expansion Joint Systems →751.13.6.3 Typical Plan of Plate
26 August 2016
- 13:4813:48, 26 August 2016 diff hist −13 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor correction
- 13:2113:21, 26 August 2016 diff hist +30 m 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints: Per BR, updated links
- 12:4112:41, 26 August 2016 diff hist +88 751.40 LFD Widening and Repair →751.40.2.4 Deck Repair and Filled Joints
- 11:1811:18, 26 August 2016 diff hist −21 m Main Page EPG 907.1
- 11:1711:17, 26 August 2016 diff hist −146 m 907.7 Highway Safety Manual →907.7.2 When is the Highway Safety Manual Used?: Per TS, removed archaic link
- 11:1611:16, 26 August 2016 diff hist +691 907.1 Safety Program Guidelines Per TS, restructured and clarified existing content; new content for safety funds that was previously issued by TP in the most recent STIP Programming Guidance.
- 08:2208:22, 26 August 2016 diff hist +123 m 127.7 Threatened and Endangered Species →127.7.6.4 District Responsibilities: link to JSP
- 08:0208:02, 26 August 2016 diff hist 0 N File:127.7 Tumbling Creek Outflight.wmv No edit summary current
- 08:0208:02, 26 August 2016 diff hist +42 m 127.7 Threatened and Endangered Species →127.7.2 Process: video upload
- 07:5607:56, 26 August 2016 diff hist +35 m 127.7 Threatened and Endangered Species →127.7.6.3 Process: minor clarification
25 August 2016
- 10:1910:19, 25 August 2016 diff hist −468 m Main Page EPG 127.7, EPG 703.2.7
- 10:0210:02, 25 August 2016 diff hist +765 m Category:703 Concrete Masonry Construction →703.2.7 Machine Finishing: Per CM and BR, expanded and clarified guidance for the use of a vibratory screed
- 08:2008:20, 25 August 2016 diff hist 0 N File:127.7.6.1.jpg No edit summary current
- 08:2008:20, 25 August 2016 diff hist 0 N File:127.7.2.jpg No edit summary current
- 08:1908:19, 25 August 2016 diff hist +10,965 127.7 Threatened and Endangered Species Per Env'l, updated text to match LPA EPG, clarified several practices, added info on migratory birds
24 August 2016
- 13:5813:58, 24 August 2016 diff hist −10 Main Page EPG 401, EPG 460, EPG 606.1, EPG 616.18, EPG 643.2, EPG 231.8, EPG 751.1,
- 13:5413:54, 24 August 2016 diff hist +862 460.3 Plant Inspection →460.3.13 Asphalt Binder Sampling: Per CM, collection of a 3rd pt. can of binder as retained sample is appropriate procedure. If a 3rd party test is needed, it can be performed on retained sample
- 13:4213:42, 24 August 2016 diff hist 0 m 236.7 Negotiation Per RW, updated Form 7.2.12
- 12:5712:57, 24 August 2016 diff hist −139 Category:401 Bituminous Base and Pavement →401.2.3 Job Mix Formula (Sec 401.4): Per CM, guidance brought in line w/ current practice. Contractors allowed flexibility in the field to make bin adjustments provided the specs are satisfied
- 12:4612:46, 24 August 2016 diff hist +326 Category:401 Bituminous Base and Pavement →401.2.8 Quality Assurance (Sec 401.9): Per CM, reflects updates to Sec 401. Includes revision to TSR verbiage, plant setting adjustments by contractor without prior approval, average core results
- 12:3412:34, 24 August 2016 diff hist +344 606.1 Guardrail →606.1.3 Guardrail Systems: Per EPG, removed incidental grading for Type A end terminals so that a separate pay item could be included for prime contractors to bid on projects.
- 12:2612:26, 24 August 2016 diff hist +107 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, Hydro Demolition updates
- 11:4911:49, 24 August 2016 diff hist −2,024 m 643.2 Local Utility Adjustments - Public and Private Per DE, generally updated the article to reflect current practice
- 11:4711:47, 24 August 2016 diff hist +16 m Category:747 Bridge Reports and Layouts →747.1.3.4.1 General Information for All Profile Sheets
- 11:4611:46, 24 August 2016 diff hist +2 m Category:747 Bridge Reports and Layouts →747.1.3.2.3 Additional Information for Grade Separations