User contributions for Smithk
Jump to navigation
Jump to search
8 August 2016
- 12:0112:01, 8 August 2016 diff hist 0 N File:616.8.10d DECM 2016.pdf No edit summary current
- 12:0112:01, 8 August 2016 diff hist 0 N File:616.8.10 DECM 2016.pdf No edit summary current
- 11:5911:59, 8 August 2016 diff hist +40 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 11:3011:30, 8 August 2016 diff hist 0 N File:616.8 legend 2016.pdf No edit summary current
- 11:3011:30, 8 August 2016 diff hist +5 m Category:616 Temporary Traffic Control Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 11:2611:26, 8 August 2016 diff hist −2 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: Per TS, replaced references to WO20-7a with WO20-7, per updated MUTCD edition.
- 06:2306:23, 8 August 2016 diff hist −58 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS, updated Unit Pricing for Logo Work on MoDOT Constr Projects
- 06:2206:22, 8 August 2016 diff hist 0 N File:616.18 Unit Price.pdf No edit summary current
- 06:2106:21, 8 August 2016 diff hist −2 m 903.11 Specific Service Signs - Logos Per TS, again updated Unit Pricing for Logo Work on MoDOT Constr Projects
5 August 2016
- 07:3607:36, 5 August 2016 diff hist 0 m Main Page No edit summary
- 06:4006:40, 5 August 2016 diff hist −1 m Help Article →EPG Approval Process
4 August 2016
- 12:0212:02, 4 August 2016 diff hist +10 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 12:0112:01, 4 August 2016 diff hist −2 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills
- 11:5711:57, 4 August 2016 diff hist −241 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, reference to archaic Hazardous Matertials Reporting Procedures Training was removed
3 August 2016
- 13:3813:38, 3 August 2016 diff hist 0 m Main Page No edit summary
- 09:3909:39, 3 August 2016 diff hist +5 m 106.3.2.76 TM-76, Acid Insoluble Residue →106.3.2.76.7 Volumetric Determination of Percent Non-Carbonate Using Individual Fractions current
- 09:1209:12, 3 August 2016 diff hist −13 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
- 09:0809:08, 3 August 2016 diff hist +13 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties
2 August 2016
- 13:4113:41, 2 August 2016 diff hist +3 m Main Page No edit summary
- 12:3712:37, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 09:0809:08, 2 August 2016 diff hist −1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 09:0709:07, 2 August 2016 diff hist −1 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing
- 09:0709:07, 2 August 2016 diff hist +1 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 08:5708:57, 2 August 2016 diff hist −2 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 08:5608:56, 2 August 2016 diff hist −5 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 08:5408:54, 2 August 2016 diff hist +64 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.4.2 File Naming Conventions
- 08:5108:51, 2 August 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 08:5008:50, 2 August 2016 diff hist −2 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 08:4708:47, 2 August 2016 diff hist −87 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal
- 08:4508:45, 2 August 2016 diff hist +338 m 237.9 Submission of Plans and Supporting Documents updated links, per Bids
- 08:3408:34, 2 August 2016 diff hist −6 751.7 General Design Data No edit summary current
29 July 2016
- 13:0413:04, 29 July 2016 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.6 Consultant Designed Projects
- 12:5012:50, 29 July 2016 diff hist +65 m 237.9 Submission of Plans and Supporting Documents →237.9.1 PS&E Submittal for Letting
- 12:4112:41, 29 July 2016 diff hist −3 m Main Page EPG 237.9
- 11:5911:59, 29 July 2016 diff hist +1 m Main Page No edit summary
- 10:0510:05, 29 July 2016 diff hist 0 N File:616.8.39a.pdf No edit summary current
- 10:0510:05, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 2 DECM 2016.pdf No edit summary
- 10:0410:04, 29 July 2016 diff hist 0 N File:616.8.39 Sheet 1 DECM 2016.pdf No edit summary
- 10:0410:04, 29 July 2016 diff hist 0 N File:616.8.34 DECM 2016.pdf No edit summary current
- 10:0410:04, 29 July 2016 diff hist 0 N File:616.8.32 DECM 2016.pdf No edit summary current
- 10:0410:04, 29 July 2016 diff hist 0 N File:616.8.7b DECM 2016.pdf No edit summary current
- 10:0310:03, 29 July 2016 diff hist +133 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per Traffic, several minor updates to TAs. New TA 39A is a slightly updated Fig. 616.7 Standard Temporary Connection...
- 09:4409:44, 29 July 2016 diff hist 0 N File:237.9.3.3.4.1.jpg No edit summary current
- 09:4309:43, 29 July 2016 diff hist 0 N File:237.9.6.jpg No edit summary current
- 09:4209:42, 29 July 2016 diff hist −4 m 237.14 Electronic Design Data Delivery (BIM Deliverables) updated links
- 09:4109:41, 29 July 2016 diff hist −5 m Category:138 Project Development Chronology updated links
- 09:4009:40, 29 July 2016 diff hist −34 m 103.1 Bid Opening and Award Process updated links
- 09:3909:39, 29 July 2016 diff hist +6,185 m 237.9 Submission of Plans and Supporting Documents Per Est. and Review, generally revised the article to reflect current guidance for the submission of plans and supporting documents for eProjects
- 07:1607:16, 29 July 2016 diff hist −2 237.9 Submission of Plans and Supporting Documents No edit summary
26 July 2016
- 11:2211:22, 26 July 2016 diff hist 0 N File:Main Page July 26, 2016.jpg No edit summary current