User contributions for Smithk
Jump to navigation
Jump to search
23 May 2016
- 13:3813:38, 23 May 2016 diff hist +436 m 153.12 General Services Per CCO and Brandi Baldwin, added CCO footnote
- 13:3613:36, 23 May 2016 diff hist 0 m 153.5 Bridge No edit summary
- 13:3613:36, 23 May 2016 diff hist 0 m 153.7 Construction and Materials No edit summary
- 13:3613:36, 23 May 2016 diff hist 0 m 153.8 Customer Relations No edit summary
- 13:3513:35, 23 May 2016 diff hist 0 m 153.9 Design No edit summary
- 13:3513:35, 23 May 2016 diff hist 0 m 153.10 Design – Escrow No edit summary
- 13:3513:35, 23 May 2016 diff hist 0 153.11 Financial Services No edit summary
- 13:3413:34, 23 May 2016 diff hist +436 m 153.11 Financial Services Per CCO and Brandi Baldwin, added CCO footnote
- 13:3213:32, 23 May 2016 diff hist +436 m 153.10 Design – Escrow Per CCO and Brandi Baldwin, added CCO footnote
- 13:3113:31, 23 May 2016 diff hist +436 m 153.9 Design Per CCO and Brandi Baldwin, added CCO footnote
- 13:3013:30, 23 May 2016 diff hist +436 m 153.8 Customer Relations Per CCO and Brandi Baldwin, added CCO footnote
- 13:2813:28, 23 May 2016 diff hist +435 m 153.7 Construction and Materials Per CCO and Brandi Baldwin, added CCO footnote
- 13:2513:25, 23 May 2016 diff hist +420 m 153.5 Bridge Per CCO and Brandi Baldwin, added footnote
- 12:4712:47, 23 May 2016 diff hist −199 m Main Page EPG 616.13
- 12:3312:33, 23 May 2016 diff hist +112 m 616.13 Work Zone Capacity, Queue and Travel Delay →Dynamic Late Merge/Zipper Merge: added JSP link
- 11:2711:27, 23 May 2016 diff hist 0 N File:616.13.6.3 Zipper.pdf No edit summary
- 11:2711:27, 23 May 2016 diff hist +1,487 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.6.3 Work Zone Intelligent Transportation Systems (WZITS): Per DE, added Zipper Merge info
20 May 2016
- 11:5411:54, 20 May 2016 diff hist 0 N File:Main Page May 20, 2016.jpg No edit summary current
- 11:5411:54, 20 May 2016 diff hist 0 N File:Main Page 2 May 20, 2016.jpg No edit summary current
- 11:5311:53, 20 May 2016 diff hist −34 m Main Page No edit summary
- 09:1909:19, 20 May 2016 diff hist −32 m Main Page EPG 501.1.3.5
- 09:1509:15, 20 May 2016 diff hist +38 m Category:501 Concrete →501.1.3.5 Compressive Strength: Per Phys Lab, clarified ref to sets of concrete cylinders to concur w/ std cure requirm'ts; added "for every 100 cu. yds." to align w/ Fed-Aid Acceptance Sampling
19 May 2016
- 13:4313:43, 19 May 2016 diff hist +104 m LPA:136.13 LPA Policy Changes No edit summary
- 13:4013:40, 19 May 2016 diff hist +286 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 13:3713:37, 19 May 2016 diff hist +129 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.4
- 13:3413:34, 19 May 2016 diff hist 0 N File:136.6.4 instructions.doc No edit summary
- 13:3413:34, 19 May 2016 diff hist +10 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated instructions for Request for Env'l Review (RER) and named it the new Fig. 136.6.4. Replaced Fig. 136.6.4 RER with link.
- 13:0013:00, 19 May 2016 diff hist +2 LPA:136.6 Environmental and Cultural Requirements →136.6.1 Introduction
- 09:0309:03, 19 May 2016 diff hist −82 m Main Page EPG 101, QRG Milestones
- 08:5808:58, 19 May 2016 diff hist 0 N File:Milestones 2016.docx No edit summary current
- 08:5808:58, 19 May 2016 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, info was added to QRG Milestones about setting up administrative and road user costs Liquidated Damages.
- 08:5708:57, 19 May 2016 diff hist +10 m Category:109 Measurement and Payment Per CM, info was added to QRG Milestones about setting up administrative and road user costs Liquidated Damages.
- 08:5708:57, 19 May 2016 diff hist +5 m Category:108 Prosecution and Progress Per CM, info was added to QRG Milestones about setting up administrative and road user costs Liquidated Damages.
18 May 2016
- 12:1012:10, 18 May 2016 diff hist 0 m Main Page No edit summary
17 May 2016
- 06:2406:24, 17 May 2016 diff hist −1 m Category:503 Bridge Approach Slabs →503.3 Other than New and Replacement Bridges: Per BR, minor correction
16 May 2016
- 12:2512:25, 16 May 2016 diff hist 0 m Main Page No edit summary
- 08:4508:45, 16 May 2016 diff hist 0 m 751.50 Standard Detailing Notes Per BR, minor clarifications
- 07:2407:24, 16 May 2016 diff hist −9 m Category:146 Disadvantaged Business Enterprise (DBE) No edit summary
- 07:0707:07, 16 May 2016 diff hist −150 m Category:101 Standard Forms →Construction and Materials: Per CM, replaced link to EPG 146 with link to CUF
13 May 2016
- 14:3114:31, 13 May 2016 diff hist −199 m 237.9 Submission of Plans and Supporting Documents →237.9.6.1 Schedule for Submittal: updated PS&E due date chart
- 14:2714:27, 13 May 2016 diff hist −789 m 103.1 Bid Opening and Award Process re-updated link
- 14:0414:04, 13 May 2016 diff hist +777 m 103.1 Bid Opening and Award Process Updated link to PS&E Chart
- 13:4613:46, 13 May 2016 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 13:4613:46, 13 May 2016 diff hist −9 m LPA:136.12 Figures, Glossary and Other Useful Links CUF form slightly modified
- 13:4513:45, 13 May 2016 diff hist −18 m LPA:136.11 Local Public Agency Construction Per ECR and CM, the CUF was slightly modified
- 13:4313:43, 13 May 2016 diff hist 0 N File:146 ECR CUF.pdf No edit summary
- 13:4313:43, 13 May 2016 diff hist −9 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.1 DBE Subcontract – Performing Work Onsite: Per ECR and CM, the CUF was slightly modified
- 13:3213:32, 13 May 2016 diff hist −16 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.2.3 Detectable Warnings: updated link
- 13:2513:25, 13 May 2016 diff hist 0 m 127.2 Historic Preservation and Cultural Resources →127.2.1.13 Uneconomic Remnants
- 12:3112:31, 13 May 2016 diff hist +1 m Main Page No edit summary