User contributions for Smithk
Jump to navigation
Jump to search
19 June 2015
- 11:1711:17, 19 June 2015 diff hist +29 m Main Page EPG 152
- 09:4509:45, 19 June 2015 diff hist +53 m Category:105 Control of Work →105.15 Acceptance (Sec 105.15): added link to new EPG 152
- 09:4209:42, 19 June 2015 diff hist +53 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: added link to new EPG 152
- 09:3809:38, 19 June 2015 diff hist +99 m 103.2 Contract Bond for Sec 103.4 added link to new EPG 152
- 09:3509:35, 19 June 2015 diff hist +98 m Category:108 Prosecution and Progress →108.12 Notice to Contractor and Surety
- 09:3309:33, 19 June 2015 diff hist +53 m Category:108 Prosecution and Progress →108.16.1 Critical Dates: added link to EPG 152
- 09:3109:31, 19 June 2015 diff hist +77 m Category:100 GENERAL New article, EPG 152
- 09:3009:30, 19 June 2015 diff hist +5,817 Nm Category:152 Contactor Bonding Responsibilities Per CM, new article provides info previously missing in the EPG. New guidance is about bid, performance & payment bonds & how surety companies are involved with these bonds on road & bridge contracts.
- 09:0109:01, 19 June 2015 diff hist 0 m LPA:136.13 LPA Policy Changes No edit summary
- 09:0009:00, 19 June 2015 diff hist +245 m LPA:136.13 LPA Policy Changes EPG 136.3 links
- 08:5608:56, 19 June 2015 diff hist +181 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Updated EPG 136.3 links to contracts
- 08:4908:49, 19 June 2015 diff hist 0 N File:136.3.28 2015.docx No edit summary
- 08:4808:48, 19 June 2015 diff hist 0 N File:136.3.15 2015.docx No edit summary
- 08:4808:48, 19 June 2015 diff hist 0 N File:136.3.14 2015.docx No edit summary
- 08:4808:48, 19 June 2015 diff hist 0 N File:136.3.13 2015.docx No edit summary
- 08:4808:48, 19 June 2015 diff hist 0 N File:136.3.12 2015.docx No edit summary
- 08:4808:48, 19 June 2015 diff hist 0 N File:136.3.11 2015.docx No edit summary
- 08:4708:47, 19 June 2015 diff hist 0 N File:136.3.10 2015.docx No edit summary
- 08:4708:47, 19 June 2015 diff hist 0 N File:136.3.9 2015.docx No edit summary
- 08:4708:47, 19 June 2015 diff hist 0 N File:136.3.8 2015.docx No edit summary
- 08:4708:47, 19 June 2015 diff hist 0 N File:136.3.7 2015.docx No edit summary
- 08:4708:47, 19 June 2015 diff hist 0 N File:136.3.6 2015.docx No edit summary
- 08:4608:46, 19 June 2015 diff hist +168 m LPA:136.3 Federal Aid Basics Per LPA, updated numerous links to contracts
- 07:5707:57, 19 June 2015 diff hist −150 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2 Required Submittals: Updated links
- 06:4106:41, 19 June 2015 diff hist −52 m Category:200 GEOMETRICS →200.1 Construction Inspection Guidance for Grading and Removals: removed archaic link
18 June 2015
- 13:1813:18, 18 June 2015 diff hist 0 m Main Page No edit summary
- 07:1307:13, 18 June 2015 diff hist +121 m 770.10 Linseed Oil Treatment Per BR, added guidance current
- 06:5806:58, 18 June 2015 diff hist +31 m 171.12 Maintenance Policy History →BRG(B2) Bridge Maintenance (District): replaced reference to mineral spirits
- 06:5706:57, 18 June 2015 diff hist −173 m Category:1113 Double Boiled Linseed Oil and Mineral Spirits Per BR and MT, removed reference to linseed oil which is no longer used
- 06:5406:54, 18 June 2015 diff hist −104 m Category:1053 Concrete Sealer →1053.2 Procedure: Per BR and MT, removed reference to linseed oil which is no longer used
- 06:5206:52, 18 June 2015 diff hist −225 m Category:703 Concrete Masonry Construction →703.5.2 Procedure: Per BR and MT, removed reference to linseed oil which is no longer used
- 06:5106:51, 18 June 2015 diff hist −30 m Category:703 Concrete Masonry Construction →703.5.1 Scope: Per BR and MT, removed reference to linseed oil which is no longer used
- 06:4906:49, 18 June 2015 diff hist −24 m 771.18 In-Deck Bridge Deck Crack Filler →Materials: updated link
- 06:4606:46, 18 June 2015 diff hist −23 m 770.9 Miscellaneous Bridge Maintenance Per BR and MT, removed reference to linseed oil which is no longer used
- 06:4506:45, 18 June 2015 diff hist −14 m 770.9 Miscellaneous Bridge Maintenance Per BR and MT, removed reference to linseed oil which is no longer used
- 06:4306:43, 18 June 2015 diff hist −44 m 171.12 Maintenance Policy History →BRG(B2) Bridge Maintenance (District): Per BR and MT, removed reference to linseed oil which is no longer used
17 June 2015
- 12:3612:36, 17 June 2015 diff hist −10 m Main Page No edit summary
- 12:2612:26, 17 June 2015 diff hist 0 N File:Main Page June 17, 2015.jpg No edit summary current
- 12:2612:26, 17 June 2015 diff hist −264 m Main Page EPG 751.50 J
- 12:0212:02, 17 June 2015 diff hist +2,851 m 751.50 Standard Detailing Notes →J. MSE Wall Notes: Per BR, MSE wall general notes revised to clarify wedge requirements for area behind soil reinforced zone; design options given to designer for more economical results.
- 07:4707:47, 17 June 2015 diff hist +39 m Category:749 Hydrologic Analysis →749.6.2.1 Equations: correction
- 07:4307:43, 17 June 2015 diff hist −1 m Category:749 Hydrologic Analysis No edit summary
- 07:4007:40, 17 June 2015 diff hist +32 m Category:749 Hydrologic Analysis minor corrections
16 June 2015
- 14:2014:20, 16 June 2015 diff hist 0 N File:Main Page June 16, 2015.jpg No edit summary current
- 14:1914:19, 16 June 2015 diff hist −128 m Main Page No edit summary
- 13:4513:45, 16 June 2015 diff hist +137 m 751.5 Structural Detailing Guidelines →751.5.2.1.5.3.1 Data Tables: Per BR, inserted link
- 13:3413:34, 16 June 2015 diff hist +91 m Main Page EPG 749 and EPG 606.1
- 13:0413:04, 16 June 2015 diff hist 0 N File:606 Adjusting Low Guradrail.pdf No edit summary
- 12:5012:50, 16 June 2015 diff hist +436 m 606.1 Guardrail →606.1.3.1 3R/4R Projects
- 12:3812:38, 16 June 2015 diff hist −64 m 236.1 General Information →236.1.1.14 Personal Conduct: updated link