User contributions for Smithk
Jump to navigation
Jump to search
13 May 2015
- 10:0610:06, 13 May 2015 diff hist −2,280 m 236.6 Appraisal and Appraisal Review →236.6.3.6 Access Rights Valuation: Per RW, removed info conflicting w/ EPG 236.5.28.3. Revision allows situation to dictate the appraisal format to be used, rather than pre-determined crieria
- 09:5409:54, 13 May 2015 diff hist +694 m Main Page EPG 750, EPG 751
- 09:3009:30, 13 May 2015 diff hist +25 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: added link
- 09:2909:29, 13 May 2015 diff hist +40 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: added linkn
- 09:1209:12, 13 May 2015 diff hist +47 m 751.50 Standard Detailing Notes →A. General Notes: Per Bridge, Notes A1.2 and A2.10 - Minor revisions to wording and format to update box culverts to LRFD design.
- 09:0009:00, 13 May 2015 diff hist +1 m 751.8 Concrete Box Culverts →751.8.3.2 Steel Reinforcement
- 08:5908:59, 13 May 2015 diff hist 0 N File:751.8.3.2.3b 2015.jpg No edit summary current
- 08:5908:59, 13 May 2015 diff hist 0 N File:751.8.3.2.3a 2015.jpg No edit summary current
- 08:5808:58, 13 May 2015 diff hist 0 N File:751.8.3.2.3 2015.jpg No edit summary current
- 08:5808:58, 13 May 2015 diff hist −8 m 751.8 Concrete Box Culverts →751.8.3.2 Steel Reinforcement
- 08:5708:57, 13 May 2015 diff hist 0 N File:751.8.3.2.2 2015.jpg No edit summary current
- 08:5608:56, 13 May 2015 diff hist 0 N File:751.8.3.2.1 over 2015.jpg No edit summary current
- 08:5608:56, 13 May 2015 diff hist 0 N File:751.8.3.2.1 less 2015.jpg No edit summary current
- 08:5608:56, 13 May 2015 diff hist −2,091 m 751.8 Concrete Box Culverts →751.8.3 Details: Per Bridge, clarified E1 bar marks are used in toe walls both up & down stream; that J6 bars are used in flared wings in lieu of J1 bars; added bending diagrams for R1 and R2 bars
- 08:5308:53, 13 May 2015 diff hist 0 N File:751.8 Reference Guide SBC.pdf No edit summary
- 08:1908:19, 13 May 2015 diff hist +857 m 171.6 Roadsides Per Maintenance, updated links
- 07:4907:49, 13 May 2015 diff hist −13 m 751.8 Concrete Box Culverts Per Bridge, updated Reference Guide SBC
- 07:4707:47, 13 May 2015 diff hist −9 m 750.7 Non-Hydraulic Considerations Per Bridge, updated Reference Guide SBC
- 07:1607:16, 13 May 2015 diff hist +189 m 750.2 Culverts →750.2.11 Data Required on Plans: Per Bridge, added that flow line elevations may be below natural stream bottom.
- 06:3306:33, 13 May 2015 diff hist 0 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way →140.1 Right of Way Encroachments, Maintenance Policy RDS(D1)
- 06:3206:32, 13 May 2015 diff hist 0 N File:140.1 Keep Unauthorized.pdf No edit summary current
- 06:3206:32, 13 May 2015 diff hist +1,301 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way Per Maintenance, updated links
12 May 2015
- 11:1411:14, 12 May 2015 diff hist 0 N File:Main Page May 12, 2015.jpg No edit summary current
- 11:1411:14, 12 May 2015 diff hist −485 m Main Page EPG 643
- 10:2110:21, 12 May 2015 diff hist +183 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.3 Proposed Utility Adjustment Plans: updated JSP link
- 10:1410:14, 12 May 2015 diff hist −7,607 m 643.3 Policy, Standards and Regulations Per Brandi Baldwin, DUE, and Christina Teter, Constr Contract Admin, article reorganized to better reflect CSR. Added online permitting info. Updated some of the bridge attachment info.
- 10:1010:10, 12 May 2015 diff hist 0 N File:643.2.1.13 preaudit checklist.pdf No edit summary current
- 10:0810:08, 12 May 2015 diff hist −12,377 m 643.2 Local Utility Adjustments - Public and Private Per Brandi Baldwin, DUE, and Christina Teter, Constr Contract Admin, article generally updated and rearranged to current practice, and especially guidance for Change Orders updated.
- 10:0710:07, 12 May 2015 diff hist −2,965 m 643.1 Utilities - Status Letter Per Brandi Baldwin, DUE, updating info on "no utility impact" projects and removed detail of liability acceptance, as requested by CCO. Directing to CCO policy instead.
- 08:0108:01, 12 May 2015 diff hist −13 m Category:Safe and Sound →Roadway Job Special Provisions (JSPs): updated JSP link
- 07:5707:57, 12 May 2015 diff hist +183 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.3 Proposed Utility Adjustment Plans: updated JSP link
- 07:5407:54, 12 May 2015 diff hist +183 m Category:704 Concrete Masonry Repair →704.2 Materials Inspection for Sec 704: updated JSP link
- 07:5307:53, 12 May 2015 diff hist −14 m Category:910 Intelligent Transportation Systems updated JSP link
- 07:5107:51, 12 May 2015 diff hist +184 m 320.2 Release of Subsurface Information →320.2.1.1 General: updated JSP link current
- 07:4907:49, 12 May 2015 diff hist +138 m LPA:136.7 Design →136.7.5.1 Additive Alternates: updated JSP link
- 07:4507:45, 12 May 2015 diff hist +183 m Category:1066 Mortars and Grout →1066.1 Procedure: updated link
- 07:4307:43, 12 May 2015 diff hist +183 m Category:822 Roadside Vegetation Management →Design Aspects of Mowing: Updated link
- 07:4207:42, 12 May 2015 diff hist +366 m Category:625 Slab Stabilization Updated JSP links
- 07:4007:40, 12 May 2015 diff hist +368 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Updated JSP links
- 07:3507:35, 12 May 2015 diff hist −16 m 237.9 Submission of Plans and Supporting Documents →237.9.6.4 Electronic JSP Review and Submittal Process, Roadway: updated JSP link
- 07:3307:33, 12 May 2015 diff hist −11 m 237.9 Submission of Plans and Supporting Documents →237.9.6.2 PS&E Submittal: updated JSP link
- 07:2707:27, 12 May 2015 diff hist +175 m Category:405 Processing Reclaimed Asphalt →405.3 Two Inch HIR (Use JSP-08-05): Updated JSP link
- 07:2307:23, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.1 Coldmilling Existing Ashaltic Concrete Pavement: Updated JSP link
- 07:2107:21, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2 Diamond Grinding Existing Portland Cement Concrete Pavement: Updated JSP link
- 07:1307:13, 12 May 2015 diff hist −11 m 237.8 Contract Time Updated JSP link
- 06:5906:59, 12 May 2015 diff hist −18 Category:Safe and Sound →Roadway Job Special Provisions (JSP’s)
- 06:5806:58, 12 May 2015 diff hist −1 Category:Safe and Sound →Contracting Issues
- 06:5506:55, 12 May 2015 diff hist −6 m 147.2 Add Alternate Bidding No edit summary
- 06:4906:49, 12 May 2015 diff hist +329 m LPA:136.13 LPA Policy Changes EPG 136.7.3.1.2
- 06:4406:44, 12 May 2015 diff hist −185 m LPA:136.7 Design →136.7.3.1.2 Job Special Provisions: Several links updated to the new SharePoint link for JSPs