User contributions for Smithk
Jump to navigation
Jump to search
27 February 2015
- 07:5307:53, 27 February 2015 diff hist −73 m 751.50 Standard Detailing Notes Per Bridge, removed references to neoprene in B1b notes
- 07:2207:22, 27 February 2015 diff hist 0 N File:751.1 Prelim Design Acceptable Rail No. 4.jpg No edit summary current
- 07:2207:22, 27 February 2015 diff hist +6 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations): Per Bridge, slight clarification to a figure
26 February 2015
- 15:1815:18, 26 February 2015 diff hist +351 m 751.50 Standard Detailing Notes Per Bridge, updated various notes to better match current practice or improve the notes' function
- 14:4214:42, 26 February 2015 diff hist +43 m 751.31 Open Concrete Intermediate Bents →751.31.2.4 Column Analysis: Per Bridge, corrected an outdated reference to a figure
- 14:3714:37, 26 February 2015 diff hist 0 N File:751.10.1.13 double.jpg No edit summary current
- 14:3614:36, 26 February 2015 diff hist 0 N File:751.10.1.13 single.jpg No edit summary current
- 14:3514:35, 26 February 2015 diff hist +31 m 751.10 General Superstructure →751.10.1.13 Drip Bevel: Per Bridge, clarified terminology
- 12:5012:50, 26 February 2015 diff hist +194 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: new figures in EPG 136.8 (Forms 136.2.2 and 136.2.2.A) and revised Form 136.8.1
- 12:4612:46, 26 February 2015 diff hist +639 m LPA:136.13 LPA Policy Changes EPG 136.8
- 12:4112:41, 26 February 2015 diff hist +2 m LPA:136.8 Local Public Agency Land Acquisition →136.8.8.1 General
- 12:4012:40, 26 February 2015 diff hist +6 m LPA:136.8 Local Public Agency Land Acquisition →136.8.2.2 Acquisition Authority
- 12:4012:40, 26 February 2015 diff hist 0 N File:136.8.2.2.A.docx No edit summary
- 12:3912:39, 26 February 2015 diff hist 0 N File:136.8.2.2.docx No edit summary
- 12:3812:38, 26 February 2015 diff hist 0 N File:136.8.1 2015.doc No edit summary current
- 12:3712:37, 26 February 2015 diff hist +177 m LPA:136.8 Local Public Agency Land Acquisition No edit summary
- 12:3612:36, 26 February 2015 diff hist +247 m LPA:136.8 Local Public Agency Land Acquisition Per RW, guidance has been expanded for the streamlined documentation process for the acquisitions of LPA projects
- 10:0310:03, 26 February 2015 diff hist +36 m 236.8 Relocation Assistance Program Updated 2 MO Rev Statutes links
25 February 2015
- 13:4713:47, 25 February 2015 diff hist 0 N File:Main Page Feb 25, 2015.jpg No edit summary current
- 13:4713:47, 25 February 2015 diff hist +1,329 m Main Page EPG 620, EPG 628, EPG 910.5
- 12:5212:52, 25 February 2015 diff hist 0 N File:910.5.2.jpg No edit summary current
- 12:5212:52, 25 February 2015 diff hist +12,156 N 910.5 ITS Improvements Procurement Per DE, this new article provides guidance on federalizing ITS purchases whether they are standalone or a part of a construction project.
- 12:4912:49, 25 February 2015 diff hist 0 N File:HFST.jpg No edit summary current
- 12:4812:48, 25 February 2015 diff hist +74 m Category:600 INCIDENTAL CONSTRUCTION EPG 628, new article
- 12:4712:47, 25 February 2015 diff hist 0 N File:628 HFST demonstration.docx No edit summary current
- 12:4712:47, 25 February 2015 diff hist +6,139 N Category:628 High Friction Surface Treatment HFST cost-effectively increases the safety of road segments where vehicles frequently depart the traveled way due to polishing of the existing pavem't aggregate or by slightly substandard geometry
- 12:4012:40, 25 February 2015 diff hist +22 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3812:38, 25 February 2015 diff hist −2,236 620.12 Construction Inspection for Sec 620 Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3712:37, 25 February 2015 diff hist −67 620.11 Guidelines for Using Water-Borne Traffic Paint Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3612:36, 25 February 2015 diff hist −1,749 620.10 Operational Procedures and Safety Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3512:35, 25 February 2015 diff hist −630 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3412:34, 25 February 2015 diff hist −1,632 m 620.1 General (MUTCD Chapter 3A) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 12:3212:32, 25 February 2015 diff hist −764 m Category:620 Pavement Marking Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 09:2109:21, 25 February 2015 diff hist +208 m Main Page EPG 450, EPG 402
- 08:3008:30, 25 February 2015 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, updated BP-2/SP95 mix thickness info to be in conformation with specs.
- 08:2908:29, 25 February 2015 diff hist +1,487 m Category:450 Bituminous Pavement Design Per CM, updated BP-2/SP95 mix thickness info to be in conformation with specs. Also added guidance emphasizing the importance of following the minimum thickness criteria.
- 07:5007:50, 25 February 2015 diff hist −214 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated PoDi link
24 February 2015
- 13:5713:57, 24 February 2015 diff hist −3 m Main Page No edit summary
- 13:4313:43, 24 February 2015 diff hist −96 m Main Page EPG 101
- 13:2813:28, 24 February 2015 diff hist 0 m Category:150 Quality Management Per CM, updated QRG
- 13:2613:26, 24 February 2015 diff hist 0 N File:Sample Record General Feb 2015.docx No edit summary
- 13:2613:26, 24 February 2015 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2015.docx No edit summary
- 13:2513:25, 24 February 2015 diff hist −1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, upated two QRGs
- 08:2608:26, 24 February 2015 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.2.4 Side Streets and Driveway Crossings: Per EPG, corrected min. width of walkway is 4 ft.
- 08:0408:04, 24 February 2015 diff hist −431 m 236.5 Property Management Per RW, deleted three archaic forms
- 07:5407:54, 24 February 2015 diff hist +1,218 m 236.13 Designing Right of Way Plans Per RW, updated several links
23 February 2015
- 15:2715:27, 23 February 2015 diff hist 0 N File:Main Page Feb 23, 2015.jpg No edit summary current
- 15:2715:27, 23 February 2015 diff hist +107 m Main Page No edit summary
- 15:1515:15, 23 February 2015 diff hist +92 m Category:700 STRUCTURES AND HYDRAULICS added EPG 734
- 15:1415:14, 23 February 2015 diff hist +113 Nm Category:734 Installation of Pipe by Horizontal Boring Methods New page: Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec0734.pdf Sec 734] for MoDOT’s specifications.