User contributions for Smithk
Jump to navigation
Jump to search
22 October 2014
- 08:5508:55, 22 October 2014 diff hist −176 m Main Page EPG 620.13 and EPG 606
- 08:1908:19, 22 October 2014 diff hist −26 m 238.1 Aerial Mapping and LiDAR Surveys updated link
- 08:1608:16, 22 October 2014 diff hist −16 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts: Per LPA, minor corrections
- 07:3807:38, 22 October 2014 diff hist +1,598 m Category:606 Guardrail and Guard Cable Added charts of available roadside hardward from FHWA website
- 06:2506:25, 22 October 2014 diff hist +177 m 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers →620.13.5 Acceptance: Per Traffic, Pavement Marking Acceptance Table clarified
- 06:1606:16, 22 October 2014 diff hist +13 m 750.6 Erosion Control and Energy Dissipation →750.6.3 Types of Ditch Protection: Per Bridge, minor corrections
20 October 2014
- 12:5012:50, 20 October 2014 diff hist +1 m Main Page No edit summary
17 October 2014
- 14:1714:17, 17 October 2014 diff hist +6 m Main Page No edit summary
- 14:1214:12, 17 October 2014 diff hist 0 N File:Main Page Oct 17, 2014.jpg No edit summary current
- 14:1114:11, 17 October 2014 diff hist +252 m Main Page new photo
- 13:4613:46, 17 October 2014 diff hist 0 m Main Page No edit summary
- 06:5706:57, 17 October 2014 diff hist −218 m Category:134 Engineering Professional Services Per LPA, removed Figs. 134.5.1.3 and 134.5.1.4 (hourly rate contracts)
- 06:2806:28, 17 October 2014 diff hist −256 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per LPA, removed references to the figures which pertain to “Hourly Rate” contracts and are no longer applicable
- 06:1706:17, 17 October 2014 diff hist +171 m Main Page EPG 903.6.11
- 06:1506:15, 17 October 2014 diff hist −655 903.6 Warning Signs →903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.09): Per Traffic, chevrons to be installed on curves with AADTs > 1000 & have advisory speed 15 mph or more below road's posted speed
16 October 2014
- 12:2012:20, 16 October 2014 diff hist −31 m 640.2 Median Drainage →640.2.5 Median Inlet Capacities: Per Bridge, removed references to archaic Type EE inlets
- 10:1710:17, 16 October 2014 diff hist 0 N File:Main Page Oct 16, 2014.jpg No edit summary current
- 10:1710:17, 16 October 2014 diff hist −230 m Main Page EPG 134.2.4
- 09:4309:43, 16 October 2014 diff hist 0 m 771.12 Bridge Joint Sealing - Polytite Per Maintc, updated activity code number
- 09:4209:42, 16 October 2014 diff hist 0 m 771.11 Bridge Joint Sealing - Silicone Per Maintc, updated activity code number
- 09:4109:41, 16 October 2014 diff hist 0 m 771.2 Bridge Cleaning and Flushing Per Maintc, updated activity code number
- 09:2909:29, 16 October 2014 diff hist 0 N File:134.2.2 2014.docx No edit summary
- 09:2809:28, 16 October 2014 diff hist +3 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2
- 09:2309:23, 16 October 2014 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC: minor edit, per LPA
- 09:1209:12, 16 October 2014 diff hist −370 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Per LPA, Hrly Rts verbiage removed since no longer apply to on-call contract
- 08:0408:04, 16 October 2014 diff hist +279 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per LPA, added a note about federally funded projects and contacting/waiting for concurrence from ECR
- 06:5706:57, 16 October 2014 diff hist +235 m Main Page EPG 110.3
- 06:5406:54, 16 October 2014 diff hist +965 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, added guidance about subcontractors signing the prevailing wage affidavit
- 06:3806:38, 16 October 2014 diff hist +254 m LPA:136.13 LPA Policy Changes EPG 136.8.11.5.2
- 06:3406:34, 16 October 2014 diff hist −90 m LPA:136.8 Local Public Agency Land Acquisition →136.8.11.5.2 Approval of Contract: Per RW, removed reference that a current real est agent is required in MO
- 06:0806:08, 16 October 2014 diff hist −105 m Main Page No edit summary
15 October 2014
- 13:5613:56, 15 October 2014 diff hist +30 m Category:134 Engineering Professional Services →134.2.2.2 Solicitation and Selection Step 2 – PM/CA to Submit Solicitation & Request Letter to PSC: Per LPA, added an email address for DBEConsult Goal
- 13:1913:19, 15 October 2014 diff hist −2 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, updated name and title
- 12:5312:53, 15 October 2014 diff hist 0 N File:Main Page 3 Oct 15, 2014.jpg No edit summary current
- 12:5212:52, 15 October 2014 diff hist 0 N File:Main Page 2 Oct 15, 2014.jpg No edit summary current
- 12:5212:52, 15 October 2014 diff hist 0 N File:Main Page Oct 15, 2014.jpg No edit summary current
- 12:5212:52, 15 October 2014 diff hist +90 m Main Page EPG 110.3, EPG 139
- 12:2712:27, 15 October 2014 diff hist +34,011 m Category:139 Design - Build Per Design (led by SL District), additional guidance for existing practices, especially a Procurement Document Writing Guide
- 06:2306:23, 15 October 2014 diff hist −249 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, since the Mo Dept of Labor certified payroll form is no longer used by MoDOT, a sentence referencing it was removed.
2 October 2014
- 07:3207:32, 2 October 2014 diff hist 0 N File:902.15 Signal Design.xlsm No edit summary current
- 07:3207:32, 2 October 2014 diff hist +78 m 902.15 Designing a Traffic Signal Per Innovations, added blank worksheet
1 October 2014
- 13:2613:26, 1 October 2014 diff hist 0 N File:Main Page Oct 1, 2014.jpg No edit summary current
- 13:2513:25, 1 October 2014 diff hist −803 m Main Page EPG 751.50
- 12:4312:43, 1 October 2014 diff hist +162 m 751.50 Standard Detailing Notes →H3c. Type N PTFE: Per Bridge, added two new notes so that they are not inadvertently omitted from the plan sheets.
- 12:1712:17, 1 October 2014 diff hist −1 m LPA:136.7 Design updated checklist
- 06:2906:29, 1 October 2014 diff hist −18 m Category:Minor Routes Shouldering Project Guidelines →Conceptual Plans: updated link
- 06:2206:22, 1 October 2014 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: Per Bridge, minor correction
30 September 2014
- 06:4306:43, 30 September 2014 diff hist 0 N File:806.8 Land Disturbance Sep 2014.pdf No edit summary current
- 06:4306:43, 30 September 2014 diff hist −122 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Envir'l, updated Land Disturbance Training
29 September 2014
- 12:1112:11, 29 September 2014 diff hist +2 m Main Page No edit summary