User contributions for Smithk
Jump to navigation
Jump to search
14 July 2014
- 09:5809:58, 14 July 2014 diff hist −113 m Category:756 Seismic Design Per Bridge, updated Bridge seismic design process flowchart
- 09:1609:16, 14 July 2014 diff hist +418 m Main Page EPG 402 and EPG 409
- 07:1807:18, 14 July 2014 diff hist −220 m Category:173 Erosion Control for Maintenance Operations →173.8.2 Regulatory Conditions for Working in Streams/Wetlands: Per Bridge, update to reflect 2012 Corps of Engineer Regional Condition 1
10 July 2014
- 13:3013:30, 10 July 2014 diff hist +101 m Main Page EPG 751.5.11.1 and EPG 751.50
- 13:2813:28, 10 July 2014 diff hist +29 m 751.50 Standard Detailing Notes added link
- 13:2113:21, 10 July 2014 diff hist +311 m 751.50 Standard Detailing Notes Per Bridge, revision at AGC's request. New guidance to specify the need for additional mechanical bar splices when required in the approach slabs because of stage construction.
- 12:5012:50, 10 July 2014 diff hist +47 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: added link
- 12:4612:46, 10 July 2014 diff hist 0 N File:751.5.11.1 splice No 2.jpg No edit summary current
- 12:4612:46, 10 July 2014 diff hist 0 N File:751.5.11.1 splice No 1.jpg No edit summary current
- 12:4512:45, 10 July 2014 diff hist 0 N File:751.5.11.1 Example.pdf No edit summary
- 12:4512:45, 10 July 2014 diff hist +2,321 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: Per Bridge, revision at AGC's request. New guidance to specify the need for additional mechanical bar splices when required in the approach slabs because of stage construction.
- 10:2310:23, 10 July 2014 diff hist +29 m Main Page No edit summary
- 09:5209:52, 10 July 2014 diff hist −4 m Main Page No edit summary
- 09:4609:46, 10 July 2014 diff hist 0 N File:Main Page 4 July 10, 2014.jpg No edit summary current
- 09:4509:45, 10 July 2014 diff hist 0 N File:Main Page 2 July 10, 2014.jpg No edit summary current
- 09:4509:45, 10 July 2014 diff hist 0 N File:Main Page 3 July 10, 2014.jpg No edit summary current
- 09:4309:43, 10 July 2014 diff hist 0 N File:Main Page July 10, 2014.jpg No edit summary current
- 09:4309:43, 10 July 2014 diff hist −252 m Main Page No edit summary
9 July 2014
- 11:1611:16, 9 July 2014 diff hist −127 m Main Page No edit summary
- 06:1406:14, 9 July 2014 diff hist −1 m Category:409 Seal Coat UPdated with Danica's name
8 July 2014
- 11:2711:27, 8 July 2014 diff hist 0 N File:Main Page July 8, 2014.jpg No edit summary current
- 11:2711:27, 8 July 2014 diff hist +142 m Main Page EPG 101 and EPG 236.5.25.6
- 08:3708:37, 8 July 2014 diff hist −294 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection: Per Traffic, removed archaic language
- 08:1908:19, 8 July 2014 diff hist +387 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection
- 07:5207:52, 8 July 2014 diff hist 0 N File:233.2.6 J-turn.pdf No edit summary current
- 07:5107:51, 8 July 2014 diff hist +281 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns: Per Traffic, added MU's evaluation of the J-turn
- 07:4107:41, 8 July 2014 diff hist +33 m 236.5 Property Management updated link
- 07:3807:38, 8 July 2014 diff hist 0 N File:236.5.25.6 Hwy Structure Security Assessment.xls No edit summary current
- 07:3807:38, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Auto.pdf No edit summary
- 07:3707:37, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Truck.pdf No edit summary
- 07:3707:37, 8 July 2014 diff hist −649 m 236.5 Property Management Per RW, clarified security assessment for leased areas guidance, and an associated form and two figures
- 06:2006:20, 8 July 2014 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx uploaded a new version of "Image:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx"
- 06:2006:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx No edit summary
- 06:2006:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) July 2014.docx No edit summary
- 06:1906:19, 8 July 2014 diff hist +15 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated 2 QRGs (Digital Signature for Adobe Pro 10) for contractors and MoDOT
7 July 2014
- 07:2907:29, 7 July 2014 diff hist 0 N File:Main Page July 7, 2014.jpg No edit summary current
- 07:2907:29, 7 July 2014 diff hist +71 m Main Page new photo
2 July 2014
- 11:3111:31, 2 July 2014 diff hist +3 m Main Page No edit summary
- 11:2911:29, 2 July 2014 diff hist 0 N File:Main Page July 2, 2014.jpg No edit summary current
- 11:2911:29, 2 July 2014 diff hist −397 m Main Page EPG 102.2
- 10:1210:12, 2 July 2014 diff hist +144 m Talk:102.2 Contractor Performance Rating System No edit summary current
- 10:0910:09, 2 July 2014 diff hist 0 N File:102.2 CPQ.pdf No edit summary
- 10:0910:09, 2 July 2014 diff hist −64 m 102.2 Contractor Performance Rating System Per CM, updated Contractor Performance Evaluation Example Form
- 06:4106:41, 2 July 2014 diff hist +204 m Main Page EPG 132
- 06:2306:23, 2 July 2014 diff hist +717 m Category:132 Safety Added PPE posters
1 July 2014
- 14:0814:08, 1 July 2014 diff hist −121 m Main Page EPG 104.13.2
- 14:0514:05, 1 July 2014 diff hist +1,090 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal: Per EPG, guidance expanded to clarify/remind the resident engineers and any contractors of the minimum expectations for VECP and PDVECP submittal information
- 13:3813:38, 1 July 2014 diff hist +11 m Category:130 Value Engineering →130.2 Contractor initiated VECPs: Per EPG, removal of "contractor initiated" verbiage to more properly reflect Construction Division's view
- 12:5112:51, 1 July 2014 diff hist 0 N File:Main Page 2 July 1, 2014.jpg No edit summary current
- 12:5012:50, 1 July 2014 diff hist 0 N File:Main Page July 1, 2014.jpg No edit summary current