User contributions for Smithk
Jump to navigation
Jump to search
29 May 2014
- 06:0706:07, 29 May 2014 diff hist −10 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.25, Sample Donation Letter and Waiver of Appraisal
28 May 2014
- 13:2513:25, 28 May 2014 diff hist 0 m Main Page No edit summary
- 08:2308:23, 28 May 2014 diff hist 0 N File:231.3.jpg No edit summary current
- 08:2308:23, 28 May 2014 diff hist +3 m 231.3 Lane Width added photo current
27 May 2014
- 11:2911:29, 27 May 2014 diff hist +288 m Main Page EPG 616.13.7
- 11:1211:12, 27 May 2014 diff hist 0 N File:616.13.7.3.pdf No edit summary current
- 11:1211:12, 27 May 2014 diff hist 0 N File:616.13.7.2.pdf No edit summary current
- 11:1111:11, 27 May 2014 diff hist −2 m 616.13 Work Zone Capacity, Queue and Travel Delay →616.13.7 Traffic Pacing
- 11:1111:11, 27 May 2014 diff hist 0 N File:616.13.7.1.xlsx No edit summary current
- 11:1111:11, 27 May 2014 diff hist +2,479 m 616.13 Work Zone Capacity, Queue and Travel Delay Per Bridge, traffic pacing facilitates short duration overhead work operations by pacing traffic at a slow speed for predetermined distance upstream of work area rather than being completely stopped
23 May 2014
- 12:2512:25, 23 May 2014 diff hist 0 m Main Page No edit summary
- 11:1411:14, 23 May 2014 diff hist +89 m Category:239 Construction Inspection Guidelines for Final Plans →239.5 2A Sheets: Per CADD, updated a MicroStation procedure
- 07:0707:07, 23 May 2014 diff hist +32 m 903.1 Highway Signing General Information added photo
- 07:0607:06, 23 May 2014 diff hist 0 N File:903.1.jpg No edit summary current
22 May 2014
- 10:1010:10, 22 May 2014 diff hist 0 m 751.2 Loads →751.2.4.3 Live Load Shear Distribution: minor clarification
- 10:0810:08, 22 May 2014 diff hist +4 m Category:751 LRFD Bridge Design Guidelines updated link
- 09:1309:13, 22 May 2014 diff hist 0 N File:Main Page May 22, 2014.jpg No edit summary current
- 09:1309:13, 22 May 2014 diff hist −61 m Main Page new photo
- 07:4407:44, 22 May 2014 diff hist +133 m LPA:136.13 LPA Policy Changes Roster of Approved Contract Negotiators
- 07:4307:43, 22 May 2014 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Roster of Approved Contract Negotiators
- 07:4007:40, 22 May 2014 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators May 2014.pdf No edit summary
- 07:3907:39, 22 May 2014 diff hist +8 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
21 May 2014
- 14:0514:05, 21 May 2014 diff hist −103 m 751.6 General Quantities →751.6.2.11 Structural Steel Protective Coatings (Nonweathering Steel): Per Bridge, clarification since primer is rarely used
- 11:5511:55, 21 May 2014 diff hist −21 m Main Page Form D-12
- 11:3711:37, 21 May 2014 diff hist −35 m 643.2 Local Utility Adjustments - Public and Private Per Design, updated Form D-12
- 11:3711:37, 21 May 2014 diff hist −35 m Category:101 Standard Forms Per Design, updated Form D-12
- 11:3611:36, 21 May 2014 diff hist −70 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Design, updated Form D-12
- 11:3511:35, 21 May 2014 diff hist 0 N File:D-12.docx No edit summary
- 11:3411:34, 21 May 2014 diff hist −70 m 237.9 Submission of Plans and Supporting Documents →237.9.1 Final Design Plans Submittal: Per Design, updated Form D-12
- 07:5107:51, 21 May 2014 diff hist +192 m 236.17 Junkyards updated links
- 07:4607:46, 21 May 2014 diff hist +336 m 236.16 Outdoor Advertising updated links
- 07:4107:41, 21 May 2014 diff hist +6 m 236.16 Outdoor Advertising updated link
- 07:3607:36, 21 May 2014 diff hist +18 m 236.11 Mediation updated links
- 07:3007:30, 21 May 2014 diff hist +54 m 236.8 Relocation Assistance Program updated links
- 07:2607:26, 21 May 2014 diff hist +42 m 236.7 Negotiation updated links
- 07:2307:23, 21 May 2014 diff hist +12 m 236.6 Appraisal and Appraisal Review updated links
- 07:2207:22, 21 May 2014 diff hist +24 m 236.5 Property Management updated links
20 May 2014
- 11:1211:12, 20 May 2014 diff hist +9 m Main Page No edit summary
- 09:0909:09, 20 May 2014 diff hist 0 N File:751.50 Copying Detailing Notes 2014.docx No edit summary
- 09:0909:09, 20 May 2014 diff hist +5 m 751.50 Standard Detailing Notes Per Bridge, updated Copying Detailing Notes
- 08:5308:53, 20 May 2014 diff hist +2 m 751.10 General Superstructure →751.10.1.15 Deck Concrete Finishing: Per Bridge, minor clarifications
- 08:2908:29, 20 May 2014 diff hist +1 m Main Page No edit summary
- 08:2808:28, 20 May 2014 diff hist +3 m Main Page No edit summary
- 08:2808:28, 20 May 2014 diff hist 0 N File:Main Page May 20, 2014.jpg No edit summary current
- 08:2708:27, 20 May 2014 diff hist −436 m Main Page EPG 106.3.2.85
- 07:5707:57, 20 May 2014 diff hist +359 m Category:1015 Bituminous Material →1015.5 Laboratory Testing for Sec 1015: Per CM, reference to new article added
19 May 2014
- 14:3014:30, 19 May 2014 diff hist +4,202 Nm 106.3.2.85 TM-85 Determination of Polyphosphoric Acid (PPA) in Performance Graded (PG) Asphalt Binders Per Chem Lab, new method created to quantitate the amount of PPA added to asphalt binders by the producer.
- 12:4712:47, 19 May 2014 diff hist 0 m Main Page No edit summary
- 12:4312:43, 19 May 2014 diff hist 0 m Main Page No edit summary
16 May 2014
- 14:1214:12, 16 May 2014 diff hist 0 m Main Page No edit summary