User contributions for Smithk
Jump to navigation
Jump to search
16 May 2014
- 13:3313:33, 16 May 2014 diff hist +135 m Talk:233.2 At-Grade Intersections with Stop and Yield Control →Link Correction
- 13:3213:32, 16 May 2014 diff hist +26 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.5 Type 3: Offset Left Turn Lanes: updated link
- 08:5708:57, 16 May 2014 diff hist +12 m Main Page No edit summary
- 06:2106:21, 16 May 2014 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private →643.2.1.3 Proposed Utility Adjustment Plans: Per Design, updated D-12
- 06:2106:21, 16 May 2014 diff hist +15 m 237.9 Submission of Plans and Supporting Documents Per Design, updated D-12
- 06:1806:18, 16 May 2014 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Design, updated D-12
- 06:1706:17, 16 May 2014 diff hist 0 N File:District Final Plans Checklist D12 2014.docx No edit summary
- 06:1706:17, 16 May 2014 diff hist −42 m Category:101 Standard Forms →Checklist: Per Design, updated D-12
15 May 2014
- 08:5808:58, 15 May 2014 diff hist 0 N File:Main Page May 15, 2014.jpg No edit summary current
- 08:5808:58, 15 May 2014 diff hist +226 m Main Page new photo
- 07:2107:21, 15 May 2014 diff hist 0 N File:236.3.3.3B May 2014.docx No edit summary
- 07:2007:20, 15 May 2014 diff hist +12 m 236.3 Administration Per RW, updated Form 3.3.3B, RW Cost Estimate
14 May 2014
- 12:3612:36, 14 May 2014 diff hist +16 m Main Page No edit summary
- 12:3212:32, 14 May 2014 diff hist +282 m LPA:136.13 LPA Policy Changes EPG 136.8.4
- 12:3012:30, 14 May 2014 diff hist +67 m LPA:136.8 Local Public Agency Land Acquisition No edit summary
- 12:2812:28, 14 May 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.8.17
- 12:2712:27, 14 May 2014 diff hist 0 N File:136.8.17 2014.doc No edit summary current
- 12:2712:27, 14 May 2014 diff hist −385 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.17 to be an optional form.
- 11:5511:55, 14 May 2014 diff hist −1 m Category:139 Design - Build →139.8.2.4 Authorization to Release RFP
- 11:5411:54, 14 May 2014 diff hist 0 N File:139.8.2.6(b).docx No edit summary current
- 11:5311:53, 14 May 2014 diff hist 0 N File:139 Project Certification Example.pdf No edit summary current
- 11:5311:53, 14 May 2014 diff hist 0 N File:139 Commission Award Example.pdf No edit summary current
- 11:5311:53, 14 May 2014 diff hist 0 N File:139 Financial Services Coding 2014.pdf No edit summary current
- 11:5311:53, 14 May 2014 diff hist +838 m Category:139 Design - Build Per Statewide Design-Build Coordinator, several minor clarifications
- 09:3909:39, 14 May 2014 diff hist 0 N File:Main Page May 14a, 2014.jpg No edit summary current
- 09:3909:39, 14 May 2014 diff hist −11 m Main Page new photo
- 08:2708:27, 14 May 2014 diff hist 0 N File:Main Page May 14, 2014.jpg No edit summary current
- 08:2708:27, 14 May 2014 diff hist +13 m Main Page EPG 617.1
- 07:5007:50, 14 May 2014 diff hist +292 m 617.1 Temporary Traffic Barriers Per Design, clarification to provide consistency in payment for relocating barrier wall and impact attenuators
- 06:0906:09, 14 May 2014 diff hist −4 m Category:756 Seismic Design Per Bridge, updated Seismic Design Process Flowchart link
13 May 2014
- 13:3413:34, 13 May 2014 diff hist +145 m LPA:136.13 LPA Policy Changes Fig. 136.8.20
- 13:3213:32, 13 May 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.8.20
- 13:3213:32, 13 May 2014 diff hist 0 N File:136.8.20.docx No edit summary
- 13:3113:31, 13 May 2014 diff hist +2 m LPA:136.8 Local Public Agency Land Acquisition Per RW, Fig. 136.8.20 verbiage tweaked to include more uniform act check items
- 10:1210:12, 13 May 2014 diff hist +89 m Category:756 Seismic Design Per Bridge, updated link to the Bridge Seismic Design Process Flowchart
- 08:4908:49, 13 May 2014 diff hist +97 m LPA:136.13 LPA Policy Changes Fig. 136.3.18
- 08:4808:48, 13 May 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig. 136.3.18
- 08:4808:48, 13 May 2014 diff hist 0 N File:136.3.18 2014.xls No edit summary current
- 08:4708:47, 13 May 2014 diff hist +10 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.18
- 08:1608:16, 13 May 2014 diff hist −8 m Main Page EPG 903.3.8
- 08:1108:11, 13 May 2014 diff hist +97 m 903.3 Ground-Mounted Sign Supports →903.3.8 Perforated Square Steel Tube Posts: Per Traffic, updated a PSST post link to provide improved guidance.
- 07:4407:44, 13 May 2014 diff hist 0 N File:Main Page May 13, 2014.jpg No edit summary current
- 07:4407:44, 13 May 2014 diff hist −136 m Main Page EPG 105.23
- 06:4106:41, 13 May 2014 diff hist +79 m Category:105 Control of Work →105.23 Quality Management: added link
- 06:3606:36, 13 May 2014 diff hist +676 m Category:105 Control of Work →105.23 Quality Management: Per CM, new QM SiteManager guidance for only MoDOT staff
12 May 2014
- 12:4512:45, 12 May 2014 diff hist −1 m Main Page No edit summary
- 09:3609:36, 12 May 2014 diff hist +289 m LPA:136.13 LPA Policy Changes EPG 136.11.17.1
- 09:3209:32, 12 May 2014 diff hist +58 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: inserted link
- 09:3009:30, 12 May 2014 diff hist 0 m LPA:136.11 Local Public Agency Construction →136.11.17.1 Material Acceptance: Per LPA, minor correction
- 07:4707:47, 12 May 2014 diff hist −2 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (TL-4 [NCHRP 350]): minor clarification, per Bridge