User contributions for Smithk
Jump to navigation
Jump to search
24 February 2014
- 13:4813:48, 24 February 2014 diff hist 0 N File:136.4.19.docx No edit summary current
- 13:4713:47, 24 February 2014 diff hist +7,265 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, added guidance for the new on-call consultant list
21 February 2014
- 14:1714:17, 21 February 2014 diff hist 0 N File:Main Page Feb 21, 2014.jpg No edit summary current
- 14:1614:16, 21 February 2014 diff hist −586 m Main Page EPG 751.12.5
- 13:4013:40, 21 February 2014 diff hist +40 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (TL-4 [NCHRP 350]): inserted link
- 13:3513:35, 21 February 2014 diff hist +1,663 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail: Per Bridge, new two-tube bridge rail guidance. This type of bridge rail was used on Safe and Sound bridge program and is now available for regular use.
- 13:1813:18, 21 February 2014 diff hist +35 m Category:606 Guardrail and Guard Cable inserted link
20 February 2014
- 15:0915:09, 20 February 2014 diff hist +1 m Main Page No edit summary
- 10:0710:07, 20 February 2014 diff hist 0 m Main Page No edit summary
19 February 2014
- 15:0615:06, 19 February 2014 diff hist +97 m Main Page EPG 131.1 and EPG 626.1
- 14:5814:58, 19 February 2014 diff hist 0 N File:131.1.4.1.2.jpg No edit summary current
- 14:5714:57, 19 February 2014 diff hist 0 N File:131.1.4.1.1.jpg No edit summary current
- 14:5714:57, 19 February 2014 diff hist +2,578 131.1 Design Exception Process Per Design, generally rewritten to improve the review and approval process and clarify roles and responsibilities by obtaining concurrence during the early stage of the process.
- 14:5314:53, 19 February 2014 diff hist 0 m 748.7 Bridge Reports and Layouts updated a link
- 14:4414:44, 19 February 2014 diff hist +120 Category:626 Rumble Strips →626.1 Edgeline Rumble Strips: Per Design, EPG 626.1 was revised to offer the option for offsetting the rumble strips or their limited use in urban areas.
- 14:1014:10, 19 February 2014 diff hist +103 m Main Page EPG 127.13.9
- 13:5613:56, 19 February 2014 diff hist +174 127.13 Noise →127.13.9 Reasonableness: Per Design, the warrant for the inclusion of sound walls on a project will now use an area (sq. ft.) threshold that remains static regardless of market conditions.
18 February 2014
- 14:1614:16, 18 February 2014 diff hist +29 m Where to Find PDM Information in the EPG →Chapter IV, Detail Design
- 13:3713:37, 18 February 2014 diff hist 0 N File:Main Page Feb 18, 2014.jpg No edit summary current
- 13:3713:37, 18 February 2014 diff hist +948 m Main Page EPG 134
- 12:4612:46, 18 February 2014 diff hist +184 m Category:134 Engineering Professional Services No edit summary
- 12:4312:43, 18 February 2014 diff hist 0 N File:134.2.4.doc No edit summary current
- 12:4312:43, 18 February 2014 diff hist 0 N File:134.2.2.doc No edit summary current
- 12:4212:42, 18 February 2014 diff hist +434 m Category:134 Engineering Professional Services →134.2 Solicitation and Selection Process: Per Design, added two new checklists: Fig 134.2.2 Processing Std. Consultant Contracts Checklist and Fig 134.2.4 Processing On-Call/MOU Consultant Contr.
- 12:1612:16, 18 February 2014 diff hist +94 m LPA:136.13 LPA Policy Changes Fig. 136.8.1
- 12:1512:15, 18 February 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Form 136.8.1
- 12:1412:14, 18 February 2014 diff hist 0 N File:136.8.1 2014.doc No edit summary current
- 12:1312:13, 18 February 2014 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Form 136.8.1
14 February 2014
- 13:1313:13, 14 February 2014 diff hist 0 m Main Page No edit summary
13 February 2014
- 10:0510:05, 13 February 2014 diff hist 0 N File:Main Page Feb 13, 2014.jpg No edit summary current
- 10:0510:05, 13 February 2014 diff hist −317 m Main Page new photo
11 February 2014
- 12:5912:59, 11 February 2014 diff hist −29 m Main Page EPG 751.12
- 12:2712:27, 11 February 2014 diff hist −6 m 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Per Bridge, note updated to reflect welder certification requirements changed last yea
- 11:1911:19, 11 February 2014 diff hist 0 N File:901 2014.jpg No edit summary current
- 11:1811:18, 11 February 2014 diff hist 0 m Category:901 Lighting new photo
10 February 2014
- 15:2715:27, 10 February 2014 diff hist +40 N 751.12 Protective Barricades 751.12 Protective Barricades moved to 751.12 Protective Barriers: Per Bridge, revised title from Protective Barricades current
- 15:2715:27, 10 February 2014 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences 751.12 Protective Barricades moved to 751.12 Protective Barriers: Per Bridge, revised title from Protective Barricades
- 09:2209:22, 10 February 2014 diff hist 0 m Main Page No edit summary
- 09:2009:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10d, 2014.jpg No edit summary current
- 09:2009:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10c, 2014.jpg No edit summary current
- 09:2009:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10b, 2014.jpg No edit summary current
- 09:2009:20, 10 February 2014 diff hist 0 N File:Main Page Feb 10a, 2014.jpg No edit summary current
- 09:1909:19, 10 February 2014 diff hist 0 N File:Main Page Feb 10, 2014.jpg No edit summary current
- 09:1909:19, 10 February 2014 diff hist −336 m Main Page No edit summary
7 February 2014
- 12:0712:07, 7 February 2014 diff hist +64 m 751.40 LFD Widening and Repair No edit summary
- 12:0512:05, 7 February 2014 diff hist +64 m 751.37 Drilled Shafts No edit summary
- 12:0312:03, 7 February 2014 diff hist +64 m 751.10 General Superstructure No edit summary
- 12:0012:00, 7 February 2014 diff hist +63 m 751.13 Expansion Joint Systems No edit summary
- 10:0210:02, 7 February 2014 diff hist +26 m 751.37 Drilled Shafts No edit summary
- 09:5909:59, 7 February 2014 diff hist +26 m 751.40 LFD Widening and Repair No edit summary