User contributions for Smithk
Jump to navigation
Jump to search
8 August 2013
- 13:1613:16, 8 August 2013 diff hist +2 m Category:130 Value Engineering →130.1.5 Study Types
- 12:0912:09, 8 August 2013 diff hist +1 m Category:130 Value Engineering →130.1.5.1 Traditional VE Studies
- 11:5711:57, 8 August 2013 diff hist −24 m Category:130 Value Engineering →130.1.5 VE Study Types: Per EPG, minor clarifications
- 08:5708:57, 8 August 2013 diff hist 0 N File:Main Page 4b Aug 8, 2013.jpg No edit summary current
- 08:5608:56, 8 August 2013 diff hist 0 N File:Main Page 4a Aug 8, 2013.jpg No edit summary current
- 08:5608:56, 8 August 2013 diff hist −31 m Main Page No edit summary
- 07:2407:24, 8 August 2013 diff hist 0 N File:Main Page Aug 8, 2013.jpg No edit summary current
- 07:2307:23, 8 August 2013 diff hist +52 m Main Page new photo
- 06:4406:44, 8 August 2013 diff hist −31 m 901.7 Light Source and Intensity Per Traffic, minor clarification
7 August 2013
- 13:0213:02, 7 August 2013 diff hist 0 N File:Main Page Aug 7, 2013.jpg No edit summary current
- 13:0113:01, 7 August 2013 diff hist +103 m Main Page photo
- 08:4508:45, 7 August 2013 diff hist 0 m 770.7 Maintenance of Bridge Superstructure No edit summary
- 08:1608:16, 7 August 2013 diff hist +1,086 m 770.7 Maintenance of Bridge Superstructure ground-penetrating radar genral info added
- 08:1308:13, 7 August 2013 diff hist 0 N File:770.7.1.jpg No edit summary current
- 07:3407:34, 7 August 2013 diff hist +33 m 751.14 Steel Superstructure photo added
- 07:3107:31, 7 August 2013 diff hist 0 N File:751.14.jpg No edit summary current
6 August 2013
- 14:2214:22, 6 August 2013 diff hist −239 m Main Page EPG 109.14
- 14:2014:20, 6 August 2013 diff hist +74 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, concrete approach pavement added to the list of eligible fuel adjustment items.
- 14:0214:02, 6 August 2013 diff hist +2 m Main Page EPG 134.2.4
- 13:5713:57, 6 August 2013 diff hist +52 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: added link
- 13:5613:56, 6 August 2013 diff hist −599 m Category:134 Engineering Professional Services /* 134.2.4 Conslt't Solt'n and Selct'n Process – Std Solt'n Method /Per Design, reminded PMs to wait on FHWA obligation before issuing NTP to consultants when contractract uses fed funds
- 07:4807:48, 6 August 2013 diff hist +2 m Main Page No edit summary
- 07:4707:47, 6 August 2013 diff hist 0 N File:Main Page Aug 6, 2013.jpg No edit summary current
- 07:4607:46, 6 August 2013 diff hist +257 m Main Page new photo
- 06:2506:25, 6 August 2013 diff hist +151 m LPA:136.13 LPA Policy Changes Fig/ 136.4.14
- 06:2306:23, 6 August 2013 diff hist −1 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, subconsultant requirements were updated for Fig. 136.4.14
- 06:2206:22, 6 August 2013 diff hist 0 N File:Fig. 136.4.14 Aug 2013.doc No edit summary current
- 06:2206:22, 6 August 2013 diff hist −3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, subconsultant requirements were updated in Fig. 136.4.14
- 06:1206:12, 6 August 2013 diff hist −11 m 751.22 Prestressed Concrete I Girders Per Bridge, minor clarifications
5 August 2013
- 12:3012:30, 5 August 2013 diff hist 0 N File:Main Page Aug 5, 2013.jpg No edit summary current
- 12:3012:30, 5 August 2013 diff hist +289 m Main Page new photo
- 11:1111:11, 5 August 2013 diff hist +35 m Category:712 Structural Steel Construction →712.1.5 High Strength Bolts And Washers (Sec 712.7): new photo
- 11:1011:10, 5 August 2013 diff hist 0 N File:712.1.5.jpg No edit summary current
2 August 2013
- 14:2114:21, 2 August 2013 diff hist +4 m Main Page No edit summary
- 09:3109:31, 2 August 2013 diff hist −48 m Main Page No edit summary
- 09:2709:27, 2 August 2013 diff hist 0 N File:Main Page 2 Aug 2, 2013.jpg No edit summary current
- 09:2709:27, 2 August 2013 diff hist 0 N File:Main Page Aug 2, 2013.jpg No edit summary current
- 09:2709:27, 2 August 2013 diff hist +50 m Main Page new photos
1 August 2013
- 09:2509:25, 1 August 2013 diff hist 0 N File:Main Page Aug 1, 2013.jpg No edit summary current
- 09:2509:25, 1 August 2013 diff hist −527 m Main Page EPG 134
- 08:5508:55, 1 August 2013 diff hist −66 m Category:134 Engineering Professional Services Per Design, in EPG 134.4 AI review no longer required; in EPG 134.5.1, removed an obsolete email group
29 July 2013
- 12:1912:19, 29 July 2013 diff hist 0 N File:Main Page 2 July 29, 2013.jpg No edit summary current
- 12:1912:19, 29 July 2013 diff hist 0 N File:Main Page July 29, 2013.jpg No edit summary current
- 12:1812:18, 29 July 2013 diff hist −225 m Main Page new photos
26 July 2013
- 11:3111:31, 26 July 2013 diff hist 0 N File:Main Page July 26, 2013.jpg No edit summary current
- 11:3111:31, 26 July 2013 diff hist −309 m Main Page EPG 127.29
- 09:4709:47, 26 July 2013 diff hist +3,685 Nm 127.29 Stormwater Per Environmental, this new article provides guidance for the MDNR's MS4 permit, which pertains to illicit discharges.
25 July 2013
- 12:1512:15, 25 July 2013 diff hist −63 m Category:139 Design - Build No edit summary
- 09:0009:00, 25 July 2013 diff hist 0 N File:Main Page July 25, 2013.jpg No edit summary current
- 08:5908:59, 25 July 2013 diff hist +3 m Main Page new photo