User contributions for Smithk
Jump to navigation
Jump to search
25 July 2013
- 07:5407:54, 25 July 2013 diff hist −1 m Category:Minor Routes Shouldering Project Guidelines →Constructability
- 06:5206:52, 25 July 2013 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12)
- 06:0906:09, 25 July 2013 diff hist +192 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12): Updated link
24 July 2013
- 12:2012:20, 24 July 2013 diff hist +1 m Main Page No edit summary
- 11:5511:55, 24 July 2013 diff hist +135 m Main Page EPG 413.3
- 11:5211:52, 24 July 2013 diff hist 0 N File:413.3.xlsx No edit summary current
- 11:5211:52, 24 July 2013 diff hist −33 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per Construction and Materials, replaced old Ashpalt Cement Price Index Example file with the new Asphalt Cement Price Adjustment spreadsheet for sq. yd. items.
- 10:2210:22, 24 July 2013 diff hist −186 m Main Page EPG Minor Routes
- 09:2009:20, 24 July 2013 diff hist 0 N File:Optional Shoulder JSP.doc No edit summary current
- 09:1909:19, 24 July 2013 diff hist −154 m Category:Minor Routes Shouldering Project Guidelines →Constructability: Per Design, replaced the reference to the obsolete Modified Shoulder JSP with the Optional Shoulder JSP.
- 06:2606:26, 24 July 2013 diff hist −62,233 m 620.14 3M Installation Contract Per Traffic, since the 3M contract has expired, this article has been archived current
23 July 2013
- 12:2512:25, 23 July 2013 diff hist −158 m Main Page EPG 147.1
- 12:1912:19, 23 July 2013 diff hist 0 N File:147.3.1 FAQ.pdf No edit summary
- 12:1912:19, 23 July 2013 diff hist 0 N File:147.3.1 white paper.pdf No edit summary
- 12:1912:19, 23 July 2013 diff hist 0 N File:147.3.1 guidelines.pdf No edit summary
- 12:1812:18, 23 July 2013 diff hist +441 m 147.1 Alternative Technical Concepts →147.1.3.1 The Standard ATC: Per Design, added Std ATC guidelines
- 10:0610:06, 23 July 2013 diff hist 0 N File:Main Page July 23, 2013.jpg No edit summary current
- 10:0510:05, 23 July 2013 diff hist −209 m Main Page new photo
22 July 2013
- 14:1014:10, 22 July 2013 diff hist 0 N File:616.25 WZ Coord Contacts July 22 2013.docx No edit summary
- 14:1014:10, 22 July 2013 diff hist +3 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated the WZ Coordination Contacts list
- 13:4513:45, 22 July 2013 diff hist 0 m Main Page No edit summary
- 13:4413:44, 22 July 2013 diff hist +1 m Main Page No edit summary
19 July 2013
- 11:4411:44, 19 July 2013 diff hist +117 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.18 Crosswalk Markings (MUTCD Section 3B.18): Per Traffic, updated Zebra marking guidance to comply with Std. Plan 620.00
- 11:1411:14, 19 July 2013 diff hist 0 N File:Main Page July 19, 2013.jpg No edit summary current
- 11:1411:14, 19 July 2013 diff hist +9 m Main Page new photo
18 July 2013
- 13:2513:25, 18 July 2013 diff hist +16 m Main Page No edit summary
17 July 2013
- 14:0214:02, 17 July 2013 diff hist +8 m Main Page No edit summary
- 12:2212:22, 17 July 2013 diff hist 0 N File:Main Page 2 July 17, 2013.jpg No edit summary current
- 12:2212:22, 17 July 2013 diff hist 0 N File:Main Page 3 July 17, 2013.jpg No edit summary current
- 12:2212:22, 17 July 2013 diff hist +234 m Main Page new photos
- 10:0110:01, 17 July 2013 diff hist 0 N File:Main Page July 17, 2013.jpg No edit summary current
- 09:5909:59, 17 July 2013 diff hist +51 m 751.36 Driven Piles added photo
16 July 2013
- 13:5013:50, 16 July 2013 diff hist −106 m Main Page EPG 104.7
- 13:4513:45, 16 July 2013 diff hist 0 N File:Fig 104.7.pdf No edit summary
- 13:4513:45, 16 July 2013 diff hist 0 m 104.7 Scoping Estimates Per Design, updated Cost Estimate Guide
- 12:1712:17, 16 July 2013 diff hist 0 m Main Page No edit summary
15 July 2013
- 13:1713:17, 15 July 2013 diff hist 0 N File:720.1.1.jpg No edit summary current
- 13:1713:17, 15 July 2013 diff hist +33 Category:720 Mechanically Stabilized Earth Wall Systems No edit summary
- 13:1213:12, 15 July 2013 diff hist 0 N File:751.22.1.1.jpg No edit summary current
- 13:1213:12, 15 July 2013 diff hist +36 m 751.22 Prestressed Concrete I Girders →751.22.1 General: new photo
- 13:0013:00, 15 July 2013 diff hist 0 N File:127.13.1.jpg No edit summary current
- 12:5912:59, 15 July 2013 diff hist +35 m 127.13 Noise new photo
- 12:3812:38, 15 July 2013 diff hist 0 N File:Main Page July 15, 2013.jpg No edit summary current
- 12:3712:37, 15 July 2013 diff hist −83 m Main Page new photo
- 11:0811:08, 15 July 2013 diff hist −15 m 643.3 Policy, Standards and Regulations →643.3.2 Roadway Classification: updated link
12 July 2013
- 12:2512:25, 12 July 2013 diff hist +81 m LPA:136.13 LPA Policy Changes Fig. 136.3.19
- 12:2312:23, 12 July 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.19 updated
- 12:2312:23, 12 July 2013 diff hist 0 N File:Fig.136.3.19 2013.pdf No edit summary
- 12:2212:22, 12 July 2013 diff hist +10 m LPA:136.3 Federal Aid Basics Per Bridge, the BEAP Consultant List was updated
- 09:4309:43, 12 July 2013 diff hist 0 N File:Main Page July 12, 2013.jpg No edit summary current