User contributions for Smithk
Jump to navigation
Jump to search
17 May 2013
- 09:5809:58, 17 May 2013 diff hist 0 N File:Main Page May 17, 2013.jpg No edit summary current
- 09:5809:58, 17 May 2013 diff hist +70 m Main Page new photo
- 09:2709:27, 17 May 2013 diff hist 0 N File:134.2.2.2 May 2013.doc No edit summary current
- 09:2609:26, 17 May 2013 diff hist 0 m Category:134 Engineering Professional Services Per Design, two spelling corrections in Fig. 134.2.2.2
- 06:5406:54, 17 May 2013 diff hist +1 m LPA:136.13 LPA Policy Changes No edit summary
- 06:3406:34, 17 May 2013 diff hist +221 m LPA:136.13 LPA Policy Changes Figs. 136.9.1 and 136.9.3.
- 06:3206:32, 17 May 2013 diff hist +8 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
- 06:3106:31, 17 May 2013 diff hist 0 N File:136.9.3 May 17, 2013.doc No edit summary
- 06:3006:30, 17 May 2013 diff hist 0 N File:136.9.1 May 17, 2013.xlsx No edit summary
- 06:3006:30, 17 May 2013 diff hist +48 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
16 May 2013
- 13:5813:58, 16 May 2013 diff hist +212 m LPA:136.13 LPA Policy Changes EPG 136.4.2.7.5
- 13:5513:55, 16 May 2013 diff hist +375 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.4 Ceasing Negotiation: Per LPA, new guidance about contract execution timeframe
- 13:4913:49, 16 May 2013 diff hist +113 m Main Page EPG 751.6.2
- 13:3913:39, 16 May 2013 diff hist +52 m 751.50 Standard Detailing Notes Per Bridge, amended Standard detailing Notes for editorial corrections.
- 13:2713:27, 16 May 2013 diff hist +223 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, amended Non-Destructive Testing to specifically require only welds of terminal sections of cover plates in tension areas to be checked.
- 13:2413:24, 16 May 2013 diff hist +575 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, guidance for computing slab quantity for bridge plans added
- 13:1213:12, 16 May 2013 diff hist −1 m Main Page No edit summary
- 13:0413:04, 16 May 2013 diff hist 0 N File:Main Page 3 May 16, 2013.jpg No edit summary current
- 13:0413:04, 16 May 2013 diff hist −79 m Main Page EPG 751.2
- 12:4412:44, 16 May 2013 diff hist −10 m 751.2 Loads →751.2.4 Load Distributions: Per Bridge, revised the definition of "ts" to mean full depth of concrete slab
- 10:2910:29, 16 May 2013 diff hist +238 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 10:2610:26, 16 May 2013 diff hist +905 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, additional guidance for selecting and scoring a consultant
- 10:1910:19, 16 May 2013 diff hist 0 N File:236 Form 3.4.2 2013.docx No edit summary
- 10:1810:18, 16 May 2013 diff hist +30 m 236.3 Administration Per RW, minor update to Form 3.4.2. CE, EA and EIS boxes added
- 09:4009:40, 16 May 2013 diff hist −72 m Category:616 Temporary Traffic Control Per Traffic, removed archaic "Work Zone Fine signing sequence" figure. The current figure is still available at EPG 616.12.3.4.
- 06:2406:24, 16 May 2013 diff hist +104 m LPA:136.13 LPA Policy Changes Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
- 06:2306:23, 16 May 2013 diff hist +11 m LPA:136.12 Figures, Glossary and Other Useful Links Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
- 06:2206:22, 16 May 2013 diff hist +11 m LPA:136.11 Local Public Agency Construction Per ECR, updated Fig. 136.11.13, Job Bulletin Board Checklist
15 May 2013
- 14:2714:27, 15 May 2013 diff hist +2 m Main Page No edit summary
- 14:2514:25, 15 May 2013 diff hist +4 m Main Page No edit summary
- 10:1210:12, 15 May 2013 diff hist +1 m Main Page No edit summary
- 10:1210:12, 15 May 2013 diff hist +2 m Main Page No edit summary
- 09:5609:56, 15 May 2013 diff hist +7 m Main Page No edit summary
- 09:5509:55, 15 May 2013 diff hist 0 N File:Main Page 4 May 15, 2013.jpg No edit summary current
- 09:5509:55, 15 May 2013 diff hist 0 N File:Main Page 3 May 15, 2013.jpg No edit summary current
- 09:5509:55, 15 May 2013 diff hist 0 N File:Main Page 2 May 15, 2013.jpg No edit summary current
- 09:5409:54, 15 May 2013 diff hist 0 N File:Main Page May 15, 2013.jpg No edit summary current
- 09:5409:54, 15 May 2013 diff hist −359 m Main Page EPG 134
- 08:5708:57, 15 May 2013 diff hist +91 m Category:134 Engineering Professional Services →134.1.7 Workforce Diversity: Per Design, minor clarification of the workforce diversity guidance
- 08:5208:52, 15 May 2013 diff hist +112 m Category:134 Engineering Professional Services Per Design, clarification of EPG 134.5.1.1
- 08:2608:26, 15 May 2013 diff hist +116 m LPA:136.13 LPA Policy Changes Fig. 136.4.8
- 08:2408:24, 15 May 2013 diff hist −105 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, removed Fig 136.4.8 since this form is no longer required.
- 08:2308:23, 15 May 2013 diff hist −90 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, removed Fig 136.4.8 since this form is no longer required.
14 May 2013
- 12:3012:30, 14 May 2013 diff hist 0 N File:134.5.1.1 2013.xlsx No edit summary current
- 12:3012:30, 14 May 2013 diff hist −16 m Category:134 Engineering Professional Services Per Design, added a workforce diversity section to Fig. 134.5.1.1, Blank Consultant Invoice.
- 11:1311:13, 14 May 2013 diff hist −319 m Main Page EPG 101
- 11:0311:03, 14 May 2013 diff hist 0 N File:SL Signal Maintenance.docx No edit summary
- 11:0311:03, 14 May 2013 diff hist +96 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG (SL District Signal Maintenance by Contractor Key Dates)
- 09:1709:17, 14 May 2013 diff hist +125 m LPA:136.13 LPA Policy Changes Fig. 136.9.1
- 09:1509:15, 14 May 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1