User contributions for Smithk
Jump to navigation
Jump to search
17 April 2013
- 10:2410:24, 17 April 2013 diff hist 0 N File:131.4 Design Exception Info 2013.doc No edit summary current
- 10:2410:24, 17 April 2013 diff hist +20 m 131.1 Design Exception Process Updated Design Exception Info form by adding line for State Design Engineer's signature
- 09:3809:38, 17 April 2013 diff hist +26 m 750.6 Erosion Control and Energy Dissipation →750.6.3.3 Rock Ditch Liner: updated link
- 09:3209:32, 17 April 2013 diff hist −13 m 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Innovative Products
- 09:3209:32, 17 April 2013 diff hist +40 m 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Innovative Products: updated link
- 09:1509:15, 17 April 2013 diff hist 0 N File:Main Page 4 Apr 17, 2013.jpg No edit summary current
- 09:1509:15, 17 April 2013 diff hist +86 m Main Page new photo
- 08:1008:10, 17 April 2013 diff hist +6 m Main Page No edit summary
- 07:5807:58, 17 April 2013 diff hist 0 N File:Main Page 2 Apr 17, 2013.jpg No edit summary current
- 07:5707:57, 17 April 2013 diff hist −301 m Main Page new safety video
- 07:1307:13, 17 April 2013 diff hist +74 m Category:132 Safety added safety video, TMA Safety Points
- 07:1207:12, 17 April 2013 diff hist −3 m Category:612 Impact Attenuators No edit summary
- 07:1107:11, 17 April 2013 diff hist +349 m Category:612 Impact Attenuators added safety video, TMA Safety Points
16 April 2013
- 09:4109:41, 16 April 2013 diff hist 0 m 751.24 Retaining Walls →751.24.1.2 Loads: corrected formula
- 07:4807:48, 16 April 2013 diff hist −59 m Main Page EPG 121
- 07:3507:35, 16 April 2013 diff hist −121 m 121.4 Quality Assurance / Quality Control for Project Prioritization Per TP, minor clarifications current
- 07:3407:34, 16 April 2013 diff hist −548 m 121.3 The Statewide Transportation Improvement Program (STIP) Per TP, numerous minor clarifications
- 07:3107:31, 16 April 2013 diff hist −647 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, numerous minor clarifications
- 07:2507:25, 16 April 2013 diff hist −67 m 121.1 Public Involvement and Decision-Making Per TP, numerous minor clarifications
- 07:2407:24, 16 April 2013 diff hist −236 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, numerous minor clarifications
- 06:4706:47, 16 April 2013 diff hist 0 N File:320.4.5.2.jpg No edit summary current
- 06:4606:46, 16 April 2013 diff hist 0 N File:320.4.5.1.jpg No edit summary current
- 06:4606:46, 16 April 2013 diff hist +59 m 320.4 Procedure for Final Sounding updated links, technical accommodation
- 06:3106:31, 16 April 2013 diff hist +110 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): updated link, per Bridge. Only a technical adjustment
15 April 2013
- 13:5813:58, 15 April 2013 diff hist +13 m Main Page No edit summary
- 12:1112:11, 15 April 2013 diff hist +576 m LPA:136.13 LPA Policy Changes EPG 136.11
- 12:0612:06, 15 April 2013 diff hist +413 m LPA:136.11 Local Public Agency Construction Per LPA, a link to CUF red flags added in E 136.11.9; guidance added in E 136.11.20 for LPA to provide documentation that each DBA was paid in full.
- 10:2810:28, 15 April 2013 diff hist +28 m Main Page No edit summary
- 10:2410:24, 15 April 2013 diff hist +28 m Main Page EPG 134
- 10:1010:10, 15 April 2013 diff hist +8 m Category:134 Engineering Professional Services No edit summary
- 10:0910:09, 15 April 2013 diff hist 0 N File:134.2.2.5.1 Apr 2013.doc No edit summary current
- 10:0910:09, 15 April 2013 diff hist 0 N File:134.2.2.2 Apr 2013.doc No edit summary current
- 10:0510:05, 15 April 2013 diff hist +2,705 m Category:134 Engineering Professional Services Per Design, MoDOT’s engineering consultant solicitations now require consultant to describe their company’s approach to promoting a diverse workforce. Forms 134.2.2.2 and 134.2.2.5 updated.
- 08:5708:57, 15 April 2013 diff hist +31 m Category:240 Maintenance and Emergency Crossovers photo added
- 08:5608:56, 15 April 2013 diff hist 0 N File:240.3.jpg No edit summary current
- 08:1208:12, 15 April 2013 diff hist 0 N File:136.12.3.3.1 Obligation Request Form 2013.docx No edit summary
- 08:1208:12, 15 April 2013 diff hist +141 m LPA:136.13 LPA Policy Changes No edit summary
- 08:1108:11, 15 April 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.3.1 Commonly Used Forms: Per LPA, updated Obligation Request Form
- 08:1108:11, 15 April 2013 diff hist +136 m LPA:136.13 LPA Policy Changes Obligation Request Form revision
12 April 2013
- 12:2112:21, 12 April 2013 diff hist +24 m Main Page No edit summary
- 12:1512:15, 12 April 2013 diff hist +38 m Main Page No edit summary
- 12:1112:11, 12 April 2013 diff hist 0 N File:100 nichols 2013.jpg No edit summary current
- 12:1012:10, 12 April 2013 diff hist +5 m Category:100 GENERAL →100.1.1 MoDOT Organization: new photo
- 11:4311:43, 12 April 2013 diff hist 0 N File:Main Page Apr 12, 2013.jpg No edit summary current
- 11:4211:42, 12 April 2013 diff hist +650 m Main Page new photo
- 10:0610:06, 12 April 2013 diff hist −83 m 320.4 Procedure for Final Sounding updated links
- 10:0410:04, 12 April 2013 diff hist −109 m Category:101 Standard Forms →Bridge: upated links
- 10:0310:03, 12 April 2013 diff hist 0 N File:M-40b.docx No edit summary
- 10:0210:02, 12 April 2013 diff hist 0 N File:M-40a.docx No edit summary
- 10:0210:02, 12 April 2013 diff hist −273 m 751.1 Preliminary Design Per Bridge, message submission updated to reflect the preferences of the new Geotechnical Director.