User contributions for Smithk
Jump to navigation
Jump to search
27 March 2013
- 09:3909:39, 27 March 2013 diff hist +151 m Category:805 Seeding →Acceptance (Sec 805.4): Per CM, updated this subarticle to comply with recent changes to Sec 805.4.
- 09:2309:23, 27 March 2013 diff hist +107 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 09:2209:22, 27 March 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 09:2009:20, 27 March 2013 diff hist 0 N File:Fig. 136.4.1 Mar 2013.docx No edit summary
- 09:1909:19, 27 March 2013 diff hist +20 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor revision to Fig. 136.4.1 ESC
- 09:0709:07, 27 March 2013 diff hist +20 m LPA:136.7 Design →136.7.6 Public Hearings: update dlink
25 March 2013
- 13:4713:47, 25 March 2013 diff hist −244 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): Per Bridge, removed archaic gif files
- 13:3013:30, 25 March 2013 diff hist 0 N File:M-40 2013.docx No edit summary current
- 13:2913:29, 25 March 2013 diff hist −49 m Category:101 Standard Forms →Design Forms: Per Bridge, updated M-40 form with new geotechnical director's name
- 13:0413:04, 25 March 2013 diff hist −102 m Main Page EPG 641
- 12:5112:51, 25 March 2013 diff hist +282 m Category:641 Bicycle Facilities Per Engineering Policy Group, guidance was generally clarified
22 March 2013
- 12:2912:29, 22 March 2013 diff hist +29 m Main Page No edit summary
- 11:3211:32, 22 March 2013 diff hist −355 m Main Page Form BR 105 R
- 11:2611:26, 22 March 2013 diff hist −16 m 751.1 Preliminary Design Per Bridge, Form Br 105 R shortened to include only district info needed to design bridge.
- 11:2511:25, 22 March 2013 diff hist −130 m 748.7 Bridge Reports and Layouts Per Bridge, Form Br 105 R shortened to include only district info needed to design bridge.
- 11:2111:21, 22 March 2013 diff hist 0 N File:BR 105 R.docx No edit summary
- 11:2011:20, 22 March 2013 diff hist −30 m 238.3 Route Surveying Per Bridge, Form Br 105 R shortened to include only district info needed to design bridge.
- 10:3110:31, 22 March 2013 diff hist 0 m Category:100 GENERAL →100.1.1 MoDOT Organization
- 10:3010:30, 22 March 2013 diff hist 0 N File:100 nichols.jpg No edit summary current
- 10:2910:29, 22 March 2013 diff hist +1 m Category:100 GENERAL →100.1 Construction Inspection Guidelines for MoDOT Organization and Committees: new photo
- 10:0610:06, 22 March 2013 diff hist +6 m Main Page new photo
- 09:5109:51, 22 March 2013 diff hist 0 N File:751.10.2.jpg No edit summary current
- 09:5109:51, 22 March 2013 diff hist +188 m 751.10 General Superstructure →751.10.2 Stay-in-Place Bridge Deck Forms: new photo
- 08:0808:08, 22 March 2013 diff hist −612 m Main Page EPG 147.3.5
- 07:4107:41, 22 March 2013 diff hist +122 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: added links
- 07:3607:36, 22 March 2013 diff hist +202 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, added guidance for RE to submit new bond to CCO and CCO submit it to CM
21 March 2013
- 11:4211:42, 21 March 2013 diff hist +22 m Main Page No edit summary
- 11:3211:32, 21 March 2013 diff hist 0 m Main Page No edit summary
- 11:2811:28, 21 March 2013 diff hist +84 m Main Page No edit summary
- 11:2611:26, 21 March 2013 diff hist 0 N File:Main Page 3 Mar 21, 2013.jpg No edit summary current
- 11:2611:26, 21 March 2013 diff hist 0 N File:Main Page 2 Mar 21, 2013.jpg No edit summary current
- 11:2611:26, 21 March 2013 diff hist +412 m Main Page new photos
- 06:2206:22, 21 March 2013 diff hist −224 m Main Page EPG 148
- 06:1006:10, 21 March 2013 diff hist 0 N File:148 abc.jpg No edit summary current
- 06:0906:09, 21 March 2013 diff hist +2,660 Nm Category:148 Accelerated Bridge Construction (ABC) Per Bridge and Design, this new article presents a brief summary of the accelerated bridge construction process, an innovative concept.
- 06:0806:08, 21 March 2013 diff hist +80 m Category:100 GENERAL New article EPG 148 Accelerated Bridge Construction (ABC)
20 March 2013
- 11:4311:43, 20 March 2013 diff hist +155 m LPA:136.13 LPA Policy Changes Fig. 136.4.14
- 11:4011:40, 20 March 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.14
- 11:3911:39, 20 March 2013 diff hist 0 N File:Fig. 136.4.14 Mar 2013.doc No edit summary current
- 11:3911:39, 20 March 2013 diff hist +12 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.14 was revised with updated document references
- 08:0208:02, 20 March 2013 diff hist +145 m Main Page EPG 903.17
- 07:4407:44, 20 March 2013 diff hist 0 N File:903.17.22 2013.jpg No edit summary current
- 07:4307:43, 20 March 2013 diff hist 0 N File:903.17.21 2013.jpg No edit summary current
- 07:4307:43, 20 March 2013 diff hist 0 N File:903.17.22 2013.pdf No edit summary current
- 07:4307:43, 20 March 2013 diff hist 0 N File:903.17.21 2013.pdf No edit summary current
- 07:4207:42, 20 March 2013 diff hist +20 m 903.16 Typical Signing Applications Per Traffic, updated Figs. 903.17.21 & 903.17.22. Upstream "Keep Right" replaced w/ optional "Do Not Pass". MUTCD requires no "Keep Right" sign be placed where driver passes to the left of the sign.
19 March 2013
- 06:5906:59, 19 March 2013 diff hist −8 m Main Page No edit summary
- 06:3506:35, 19 March 2013 diff hist 0 N File:Main Page Mar 18, 2013.jpg No edit summary current
- 06:3506:35, 19 March 2013 diff hist +238 m Main Page new photo
18 March 2013
- 10:1110:11, 18 March 2013 diff hist 0 N File:101 Precon letter, state 2013.docx No edit summary