User contributions for Smithk
Jump to navigation
Jump to search
27 February 2013
- 13:5613:56, 27 February 2013 diff hist +785 m 751.37 Drilled Shafts →751.37.6 Structural Resistance of Drilled Shafts: Per Bridge, clarified column and drilled shaft longitudinal reinforcement requirements and drilled shaft transverse reinforcement requirements.
- 13:1313:13, 27 February 2013 diff hist +351 m 751.31 Open Concrete Intermediate Bents →751.31.2.3 General Design Assumptions: Per Bridge, clarified column and drilled shaft longitudinal reinforcement requirements and drilled shaft transverse reinforcement requirements.
- 12:5412:54, 27 February 2013 diff hist 0 N File:Main Page 5 Feb 27, 2013.jpg No edit summary current
- 12:5412:54, 27 February 2013 diff hist 0 N File:Main Page 4 Feb 27, 2013.jpg No edit summary current
- 12:5412:54, 27 February 2013 diff hist 0 N File:Main Page 3 Feb 27, 2013.jpg No edit summary current
- 12:5412:54, 27 February 2013 diff hist 0 N File:Main Page 2 Feb 27, 2013.jpg No edit summary current
- 12:5312:53, 27 February 2013 diff hist +157 m Main Page new photos
- 11:2011:20, 27 February 2013 diff hist +36 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: Per Design, updated members of the PSC
26 February 2013
- 15:2315:23, 26 February 2013 diff hist +180 m LPA:136.13 LPA Policy Changes Fig. 136.4.7
- 15:2215:22, 26 February 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig. 136.4.7
- 15:2115:21, 26 February 2013 diff hist 0 N File:136.4.7 Feb 2013.doc No edit summary current
- 15:2115:21, 26 February 2013 diff hist +16 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.7, Sample Solicitation & Sample Scope of Services updated to include "right of way plans" in the sample scope of services
- 14:4614:46, 26 February 2013 diff hist +2 m Main Page No edit summary
- 14:4514:45, 26 February 2013 diff hist 0 N File:Main Page Feb 26, 2013.jpg No edit summary current
- 14:4514:45, 26 February 2013 diff hist +76 m Main Page new photo
- 13:3213:32, 26 February 2013 diff hist 0 m Main Page No edit summary
- 11:0211:02, 26 February 2013 diff hist +1,495 m 751.40 LFD Widening and Repair Per Bridge, numerous archaic references replaced with EPG links
25 February 2013
- 14:5814:58, 25 February 2013 diff hist 0 m Main Page No edit summary
- 14:4914:49, 25 February 2013 diff hist +931 m LPA:136.13 LPA Policy Changes expanded info based on 2/21/13 LPA Bulletin
- 10:3810:38, 25 February 2013 diff hist −8 m LPA:136 Local Public Agency (LPA) Policy minor update
- 08:3708:37, 25 February 2013 diff hist +298 m LPA:136.13 LPA Policy Changes EPG 136.11.12
- 08:3408:34, 25 February 2013 diff hist −1 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultantant Administration
- 08:3408:34, 25 February 2013 diff hist −34 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7 Step 6 - Consultant Contract Negotiations
- 08:3308:33, 25 February 2013 diff hist −16 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultant Construction Engineering Services
- 08:2908:29, 25 February 2013 diff hist +226 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7 Step 6 - Consultant Contract Negotiations: Per LPA, link provided to updated EPG 136.11.12.
- 08:2508:25, 25 February 2013 diff hist +1,216 m LPA:136.11 Local Public Agency Construction →136.11.12 Consultant Construction Engineering Services: Per LPA, update giving more guidance on construction administration expectations. Also, 136.11.12 re-titled.
22 February 2013
- 13:1413:14, 22 February 2013 diff hist 0 N File:616.23.1 non-motorize 2013.jpg No edit summary current
- 13:1413:14, 22 February 2013 diff hist +5 m 616.23 Traffic Control for Field Operations →616.23.1 Definitions: new photo
- 12:5212:52, 22 February 2013 diff hist −9 m Main Page No edit summary
- 12:2912:29, 22 February 2013 diff hist 0 N File:Main Page Feb 22, 2013.jpg No edit summary current
- 12:2912:29, 22 February 2013 diff hist −68 m Main Page new photo
- 11:2511:25, 22 February 2013 diff hist +32 m Category:128 Conceptual Studies →128.4 Pavement Rehabilitation Projects for Freeways: new photo
- 11:2511:25, 22 February 2013 diff hist 0 N File:128.4.jpg No edit summary current
- 09:2609:26, 22 February 2013 diff hist +1,643 m Talk:941.37 Welcome To Monuments for Cities : current
- 09:0809:08, 22 February 2013 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2013.docx No edit summary
- 09:0709:07, 22 February 2013 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, minor correction to QRG "Digital Signature for Adobe Pro 10 (Contractors)"
- 07:1007:10, 22 February 2013 diff hist +1 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: Design updated email address from Contractual Payments to Obligate and PB&J
21 February 2013
- 09:2909:29, 21 February 2013 diff hist +180 m LPA:136.13 LPA Policy Changes EPG 136.9.2.10
- 09:2709:27, 21 February 2013 diff hist −18 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.10 ADA Certification and Checklist: Per LPA, EPG 136.9.2.10 retitled "ADA Checklist" (from "ADA Certification and Checklist")
- 07:5607:56, 21 February 2013 diff hist −1 m Main Page No edit summary
- 07:4907:49, 21 February 2013 diff hist 0 N File:Main Page 3 Feb 21, 2013.jpg No edit summary current
- 07:4907:49, 21 February 2013 diff hist −483 m Main Page new photo
20 February 2013
- 15:0815:08, 20 February 2013 diff hist −5 m Main Page No edit summary
- 13:0113:01, 20 February 2013 diff hist 0 N File:Main Page 4 Feb 20, 2013.jpg No edit summary current
- 13:0013:00, 20 February 2013 diff hist +17 m Main Page new photo
- 09:2009:20, 20 February 2013 diff hist 0 N File:Main Page 2 Feb 20, 2013.jpg No edit summary current
- 09:2009:20, 20 February 2013 diff hist −50 m Main Page new photo
- 08:4208:42, 20 February 2013 diff hist 0 N File:236.11 Roster of Approved Contract Mediators (Form 11.2.3) 2013.pdf No edit summary
- 08:4208:42, 20 February 2013 diff hist −40 m 236.11 Mediation Per RW, updated Roster of Approved Contract Mediators
19 February 2013
- 14:3314:33, 19 February 2013 diff hist +87 m Category:170 Maintenance Activity Planning Guidelines →Introduction: added link to safety video