User contributions for Smithk
Jump to navigation
Jump to search
5 February 2013
- 14:0114:01, 5 February 2013 diff hist +249 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.1 Wage Interviews: Per CM, since the SiteManager Policy & Procedure Manual is no longer used, new guidance gives direction on how wage rate interviews should be documented in SiteManager.
- 11:2411:24, 5 February 2013 diff hist −6 m Main Page No edit summary
- 11:2311:23, 5 February 2013 diff hist +1 m Main Page No edit summary
- 11:2211:22, 5 February 2013 diff hist −659 m Main Page EPG 147.3
- 11:1911:19, 5 February 2013 diff hist +1,505 m 147.3 Job Order Contracting (JOC) Per Design, in E 147.3.5, a minor clarification for contract extensions. Also, E 147.3.9 is new guidance for the change order approval process.
- 09:1309:13, 5 February 2013 diff hist 0 m Main Page No edit summary
- 09:1109:11, 5 February 2013 diff hist 0 N File:Main Page 3 Feb 5, 2013.jpg No edit summary current
- 09:1009:10, 5 February 2013 diff hist −266 m Main Page No edit summary
- 07:0307:03, 5 February 2013 diff hist 0 N File:147 asphalt pavement repair 2013.doc No edit summary current
- 07:0307:03, 5 February 2013 diff hist 0 N File:147 bridge 2013.doc No edit summary current
- 07:0307:03, 5 February 2013 diff hist 0 N File:147 concrete pavement repair 2013.doc No edit summary current
- 07:0307:03, 5 February 2013 diff hist +15 m 147.3 Job Order Contracting (JOC) Per Design, additional updates to three JSPs
4 February 2013
- 15:2415:24, 4 February 2013 diff hist +201 m Main Page EPG 147.3
- 15:2015:20, 4 February 2013 diff hist 0 N File:147 asphalt pavement repair.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist 0 N File:147 bridge.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist 0 N File:147 concrete pavement repair.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist 0 N File:147 fence.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist 0 N File:147 guard cable.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist 0 N File:147 guardrail.doc No edit summary current
- 15:1915:19, 4 February 2013 diff hist +509 m 147.3 Job Order Contracting (JOC) Per Design, JSPs updated, deadlines adjusted and guidance on how to increase the performance contract bond.
- 10:5410:54, 4 February 2013 diff hist +106 m LPA:136.13 LPA Policy Changes Fig. 136.4.11
- 10:5310:53, 4 February 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Fig. 136.4.11
- 10:5210:52, 4 February 2013 diff hist 0 N File:136.4.11 Feb 2013.doc No edit summary current
- 10:5210:52, 4 February 2013 diff hist +8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.9.11, added the conflict of interest line item.
- 10:3810:38, 4 February 2013 diff hist −85 m 751.14 Steel Superstructure →751.14.5.9.1 Drip Bar Guidance: Per Bridge, removed "See Bridge Development Section for details."
- 10:3110:31, 4 February 2013 diff hist +19 m LPA:136.7 Design →136.7.4 Engineer’s Estimate: Updated link
- 10:2410:24, 4 February 2013 diff hist −27 m Main Page EPG 136.1.2.2
- 10:1310:13, 4 February 2013 diff hist +406 m LPA:136.13 LPA Policy Changes EPG 136.1.2.2
- 10:1010:10, 4 February 2013 diff hist −99 m LPA:136.1 Introduction →136.1.2.2 Project Sponsor Eligibility: Per LPA, the definition of an eligible sponsor for federal aid transportation projects was clarified.
1 February 2013
- 09:2409:24, 1 February 2013 diff hist +158 m LPA:136.13 LPA Policy Changes Figs. 136.9.1 and 136.9.12
- 09:2209:22, 1 February 2013 diff hist −7 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.1
- 09:2109:21, 1 February 2013 diff hist 0 N File:136.9.1 2013.xlsx No edit summary
- 09:2109:21, 1 February 2013 diff hist −291 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, Fig. 136.9.1 updated to remove the requirement for ADA certification. Also, Fig. 136.9.12 (ADA Certification) deleted.
- 09:0709:07, 1 February 2013 diff hist +304 m Main Page EPG 134
- 08:4208:42, 1 February 2013 diff hist −854 m Category:134 Engineering Professional Services Per Design, clarification of the criteria for prequalifying a consultant for MoDOT and LPA work.
- 08:2908:29, 1 February 2013 diff hist +15 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.4.1, 136.4.7, 136.4.8, 136.4.9, 136.4.11, 136.4.14 updated
- 08:2708:27, 1 February 2013 diff hist +1,233 m LPA:136.13 LPA Policy Changes EPG 136.4
- 08:2008:20, 1 February 2013 diff hist 0 N File:136.4 How to Evaluate 2013.ppt No edit summary current
- 08:2008:20, 1 February 2013 diff hist 0 N File:Fig. 136.4.14 2013.doc No edit summary current
- 08:2008:20, 1 February 2013 diff hist 0 N File:136.4.11 2013.doc No edit summary current
- 08:1808:18, 1 February 2013 diff hist 0 N File:136.4.9 2013.doc No edit summary current
- 08:1808:18, 1 February 2013 diff hist 0 N File:Fig. 136.4.8 2013.doc No edit summary current
- 08:1808:18, 1 February 2013 diff hist 0 N File:136.4.7 2013.doc No edit summary current
- 08:1808:18, 1 February 2013 diff hist 0 N File:Fig. 136.4.1 2013.docx No edit summary
- 08:1708:17, 1 February 2013 diff hist −495 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Design, clarification of the criteria for prequalifying a consultant for MoDOT and LPA work. Several figures and "How to Evaluate" PowerPoint updated.
- 07:1607:16, 1 February 2013 diff hist +316 m Category talk:626 Rumble Strips No edit summary current
- 07:1507:15, 1 February 2013 diff hist 0 N File:626 talk.jpg No edit summary current
- 07:0507:05, 1 February 2013 diff hist −6 m Main Page No edit summary
30 January 2013
- 13:0213:02, 30 January 2013 diff hist 0 m Main Page No edit summary
29 January 2013
- 13:2013:20, 29 January 2013 diff hist +96 m LPA:136.13 LPA Policy Changes EPG 136.7.2.4.2