User contributions for EPG-Admin
Jump to navigation
Jump to search
13 November 2008
- 10:2310:23, 13 November 2008 diff hist −115 m 127.3 Community Impact Assessment remove "Key Points" box
- 10:2210:22, 13 November 2008 diff hist −132 m 127.2 Historic Preservation and Cultural Resources remove "Key Points" box
- 10:2010:20, 13 November 2008 diff hist −122 m 127.1 Request for Environmental Services remove "Key Points" box
- 10:1810:18, 13 November 2008 diff hist −122 m Category:124 Quality Control / Quality Assurance (QC/QA) remove "Key Points" box
- 10:1710:17, 13 November 2008 diff hist −121 m Category:126 Location Study and Alternatives Analysis remove "Key Points" box
- 10:1510:15, 13 November 2008 diff hist −112 m Category:123 Federal-Aid Highway Program remove "Key Points" box
12 November 2008
- 14:2214:22, 12 November 2008 diff hist 0 Talk:940.3 Clearance of Functional Areas of Interchanges →Minimum distance between ramps and first entrance or outerroad current
- 14:1914:19, 12 November 2008 diff hist +310 N Talk:940.3 Clearance of Functional Areas of Interchanges Minimum distance between ramps and first entrance or outerroad
- 11:2611:26, 12 November 2008 diff hist +35 User talk:Smithk No edit summary current
- 11:2311:23, 12 November 2008 diff hist +22 User talk:Willibc No edit summary current
- 11:1911:19, 12 November 2008 diff hist −91 User talk:Willibc Removing all content from page
- 11:1911:19, 12 November 2008 diff hist −16 User talk:Willibc →Test
- 11:1811:18, 12 November 2008 diff hist −59 User talk:Willibc →Email test
- 11:1711:17, 12 November 2008 diff hist +59 User talk:Willibc Email test
- 11:1011:10, 12 November 2008 diff hist +1 m Category:501 Concrete Correcting broken link
- 11:0811:08, 12 November 2008 diff hist +10 Category:501 Concrete →501.2.5.1 Trial Batch
- 11:0611:06, 12 November 2008 diff hist +1 Category:501 Concrete →501.2.4.3 Admixtures
- 11:0511:05, 12 November 2008 diff hist +9 Category:501 Concrete No edit summary
10 November 2008
- 14:0314:03, 10 November 2008 diff hist +41 751.50 Standard Detailing Notes Revised notes in E3.2 and E3.3 to reference inclusion of subsurface data in electronic deliverables.
- 13:3813:38, 10 November 2008 diff hist +103 237.9 Submission of Plans and Supporting Documents Revised to reflect inclusion of subsurface data with electronic deliverables.
- 13:3313:33, 10 November 2008 diff hist +282 237.14 Electronic Design Data Delivery (BIM Deliverables) 237.14.1.7 Revised to be entitled "Preliminary Geotechnical Report" and reflect inclusion of subsurface data with electronic deliverables.
- 13:0013:00, 10 November 2008 diff hist −2 320.2 Release of Subsurface Information Revised to reflect inclusion of subsurface data with electronic deliverables.
- 11:3311:33, 10 November 2008 diff hist +317 Category talk:403 Asphaltic Concrete Pavement No edit summary current
7 November 2008
- 13:0113:01, 7 November 2008 diff hist +180 Category talk:403 Asphaltic Concrete Pavement No edit summary
6 November 2008
- 15:0115:01, 6 November 2008 diff hist +326 Category talk:403 Asphaltic Concrete Pavement No edit summary
- 13:3213:32, 6 November 2008 diff hist +178 N Category talk:403 Asphaltic Concrete Pavement New page: 403.1.5 under Gradation line 4 and 5 shouldn't the sentance"QA is required to independently sample the aggregate and perform a sieve analysis once per lot." read "once per day."?
5 November 2008
- 13:4113:41, 5 November 2008 diff hist +91 m Engineering Professional Services Guidelines add link to DE01-MOU
- 13:3913:39, 5 November 2008 diff hist +198 m Engineering Professional Services Guidelines add links to DE01-SF and DE01-MOU
- 13:3113:31, 5 November 2008 diff hist +9 m Engineering Professional Services Guidelines improve wording of link to the CCO internal website
- 13:2213:22, 5 November 2008 diff hist +4 m Engineering Professional Services Guidelines revise address of link to CCO agreements DE01 and DE01-SF
- 11:0111:01, 5 November 2008 diff hist +79 m 237.6 Project Estimates add link to "sediment removal" in 806.2.1
- 10:5510:55, 5 November 2008 diff hist +239 m Category:806 Pollution, Erosion and Sediment Control add section to discuss "sediment removal"
- 09:1809:18, 5 November 2008 diff hist +1 m Engineering Professional Services Guidelines correct "number" of form DE01-SUP
- 09:1609:16, 5 November 2008 diff hist +8 m Engineering Professional Services Guidelines revise CCO "intranet address" of DE consultant contracts
- 08:4908:49, 5 November 2008 diff hist +27 m Category:350 Design for Bases and Aggregate Surfaces Updated link for A2 Shoulder Special Sheet
4 November 2008
- 06:5806:58, 4 November 2008 diff hist +161 Talk:Main Page Change Orders
3 November 2008
- 13:1213:12, 3 November 2008 diff hist −2 Main Page No edit summary
- 13:1213:12, 3 November 2008 diff hist +5 Main Page No edit summary
31 October 2008
- 08:1308:13, 31 October 2008 diff hist +141 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Electronic bridge plans can be made available.
30 October 2008
- 09:4009:40, 30 October 2008 diff hist −54 m 237.4 Plan-Profile Sheets improve the location of the CADD services link
- 09:2609:26, 30 October 2008 diff hist +338 m Category:125 CADD Services add link to Geopak and Microstation drawing standards for external MoDOT users
- 08:4008:40, 30 October 2008 diff hist +36 m Category:235 Preliminary Plans rearrange wording of the first paragraph and add a link to "alternate pavement"
- 08:2908:29, 30 October 2008 diff hist 0 m Category:235 Preliminary Plans very minor wording improvement
- 07:1107:11, 30 October 2008 diff hist 0 m 230.1 Horizontal Alignment modify the address for the link to "minimum horizontal clearance"
29 October 2008
- 07:1707:17, 29 October 2008 diff hist +22 m 236.13 Designing Right of Way Plans revise link to "letter of approval" from an uploaded version to a webbased version
- 07:1507:15, 29 October 2008 diff hist +69 m 236.13 Designing Right of Way Plans revise the link to "sample cover letter" from an uploaded version to a webbased version
- 07:0707:07, 29 October 2008 diff hist +68 m 236.13 Designing Right of Way Plans revise the link to the "sample certification document" from an uploaded version to a webbased version
27 October 2008
- 12:0912:09, 27 October 2008 diff hist +332 m Engineering Professional Services Guidelines add link to a new form "Consultant Approval Selection Letter" and make necessary text revisions for it.
- 12:0212:02, 27 October 2008 diff hist 0 N File:Consultant Selection Approval Letter.doc No edit summary current
- 08:4808:48, 27 October 2008 diff hist +24 m 750.1 Open Channels Clarified footnote to roughness coefficients table.