User contributions for EPG-Admin
Jump to navigation
Jump to search
19 June 2008
- 14:2914:29, 19 June 2008 diff hist +283 m Category:405 Processing Reclaimed Asphalt Added links to JSPs.
- 07:3507:35, 19 June 2008 diff hist 0 m Category:622 Pavement and Bridge Surface Removal and Texturing Corrected JSP designation.
18 June 2008
- 15:0615:06, 18 June 2008 diff hist +2,886 Category:405 Processing Reclaimed Asphalt Hot in place recycling is becoming a viable rehabilitation strategy.
- 14:2814:28, 18 June 2008 diff hist −136 m Category:622 Pavement and Bridge Surface Removal and Texturing Update links to 405 Processing Reclaimed Asphalt
- 11:3011:30, 18 June 2008 diff hist +8 Category:408 Prime Coat Reduced asphalt thickness requiring prime coat.
- 10:2010:20, 18 June 2008 diff hist +308 m Category:806 Pollution, Erosion and Sediment Control add paragraph concerning Standard Plan 806.10 and a link to the plan.
- 08:4708:47, 18 June 2008 diff hist +348 m Category:806 Pollution, Erosion and Sediment Control add links to the spec book (Section 1001) and to the texas DOT website
- 08:3708:37, 18 June 2008 diff hist +348 m 750.6 Erosion Control and Energy Dissipation add links to the spec book (Section 1001) and the Texas DOT website
- 07:3007:30, 18 June 2008 diff hist +106 m 748.7 Bridge Reports and Layouts Clarify Bridge Survey Report submission documents.
17 June 2008
- 12:3612:36, 17 June 2008 diff hist 0 m 751.13 Expansion Joint Systems Typographical correction.
16 June 2008
- 14:2714:27, 16 June 2008 diff hist +559 m 750.6 Erosion Control and Energy Dissipation add links to 806 Pollution, Erosion and Sediment Control
- 12:5012:50, 16 June 2008 diff hist +1 m 233.2 At-Grade Intersections with Stop and Yield Control add period after "signals" in the notes area.
- 12:4212:42, 16 June 2008 diff hist +49 m 233.2 At-Grade Intersections with Stop and Yield Control update thickness of minimum driveway thickness (see 750.6.3)
13 June 2008
- 07:5607:56, 13 June 2008 diff hist 0 606.2 Guard Cable No edit summary
11 June 2008
- 10:1910:19, 11 June 2008 diff hist +1 646.1 Manholes No edit summary
- 10:1810:18, 11 June 2008 diff hist +9 m 646.1 Manholes Corrected link.
- 08:0508:05, 11 June 2008 diff hist 0 m 103.1 Bid Opening and Award Process Corrected link.
9 June 2008
- 15:1315:13, 9 June 2008 diff hist −19 m Category:622 Pavement and Bridge Surface Removal and Texturing Incorporate interim guidance on disposition of coldmillings.
- 13:3213:32, 9 June 2008 diff hist −136 m 237.8 Contract Time Removed outdated information.
- 09:1709:17, 9 June 2008 diff hist +1 606.2 Guard Cable No edit summary
- 07:0307:03, 9 June 2008 diff hist −1 m 750.6 Erosion Control and Energy Dissipation Typographical correction.
6 June 2008
- 10:3610:36, 6 June 2008 diff hist +171 Main Page No edit summary
- 10:3410:34, 6 June 2008 diff hist +128 m 750.7 Non-Hydraulic Considerations Article construction - Moved culvert extension cost information from interim guidance to EPG.
- 09:1709:17, 6 June 2008 diff hist +1 m 751.50 Standard Detailing Notes Typographical correction.
- 09:1209:12, 6 June 2008 diff hist +1 m 751.50 Standard Detailing Notes Typographical correction.
5 June 2008
- 14:1514:15, 5 June 2008 diff hist +413 m Category:622 Pavement and Bridge Surface Removal and Texturing Added link to JSP-06-05.
- 10:0910:09, 5 June 2008 diff hist +593 m 103.1 Bid Opening and Award Process add "practical design issues" to the text (came from "Interim Guidance")
- 07:4807:48, 5 June 2008 diff hist +195 m 751.50 Standard Detailing Notes Minor edits to complete 2 June 2008 revisions.
4 June 2008
- 15:1415:14, 4 June 2008 diff hist +1,715 m 606.1 Guardrail add section concerning "turned down ends"
- 14:4014:40, 4 June 2008 diff hist −227 m 751.36 Driven Piles Revisions correspond with the implementation of the new dynamic pile driving formula in the specifications.
- 14:3314:33, 4 June 2008 diff hist +19 m Category:124 Quality Control / Quality Assurance (QC/QA) correct "name" of first item listed in the "Forms" box to "Project Estimate Quality Assurance Report"
- 14:2614:26, 4 June 2008 diff hist −13 m 237.6 Project Estimates remove reference to "Bid Price Book" and provide link to "Project Cost Estimate" location.
- 14:2114:21, 4 June 2008 diff hist +2,155 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction add wording to this section about cost and providing a link to 237.6 Estimates.
- 11:1111:11, 4 June 2008 diff hist +36 m 751.1 Preliminary Design Corresponds with the implementation of the new dynamic pile driving formula in the specifications.
- 08:1608:16, 4 June 2008 diff hist −11 m 236.3 Administration correct link to Form 6.4.4
- 08:1108:11, 4 June 2008 diff hist −20 m 236.3 Administration correct link to Form 6.4.4
3 June 2008
- 14:5714:57, 3 June 2008 diff hist −30,990 m 751.50 Standard Detailing Notes Additional edits related to 2 June 08 edits.
2 June 2008
- 15:1915:19, 2 June 2008 diff hist −11 m 236.6 Appraisal and Appraisal Review upload revised Form 236.6.4.4
- 14:3914:39, 2 June 2008 diff hist +6,743 m 751.50 Standard Detailing Notes Consolidated LFD Tables and LRFD Chart in E2. corresponding with new dynamic pile driving formula in specs.
- 12:4712:47, 2 June 2008 diff hist −40 m 236.6 Appraisal and Appraisal Review upload revised and renamed Form 236.6.4.4
- 12:4012:40, 2 June 2008 diff hist 0 N File:236.6.4.4 Adjustment of Value or Just Compensation Form 6.4.4.doc No edit summary
- 12:1212:12, 2 June 2008 diff hist +2,095 m 236.6 Appraisal and Appraisal Review add several revisions to the orginial article in the simpliest way possible
29 May 2008
- 14:2514:25, 29 May 2008 diff hist +1,092 Talk:Main Page Change Order Approval Rules
28 May 2008
- 09:5309:53, 28 May 2008 diff hist +258 m Category:236 Right of Way add links to 23 and 49 CFR
- 09:4809:48, 28 May 2008 diff hist 0 m 236.3 Administration in last sentence change "236.18" to the correct number "236.16"
- 09:3809:38, 28 May 2008 diff hist 0 m 236.16 Outdoor Advertising change link for "Records Request Qestionnaire" to the internet location instead of the pdf. location.
23 May 2008
- 11:0511:05, 23 May 2008 diff hist +1,195 N User talk:Millep1 Change Order Approval Rules
22 May 2008
- 12:5312:53, 22 May 2008 diff hist +222 Talk:104.7 Scoping Estimates No edit summary
- 11:0611:06, 22 May 2008 diff hist +1,065 N Category talk:137 Construction Inspection Guidance for Records to be Maintained New page: Ok. I do have a suggestion. It is something that I always thought should've been worded differently in the Construction Manual to clarify the change order approval rules in Section 137.2....
- 07:0107:01, 22 May 2008 diff hist +177 N Talk:104.7 Scoping Estimates Request for add'l information.